ML17221A536
| ML17221A536 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 12/01/1987 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17221A537 | List: |
| References | |
| NUDOCS 8712070378 | |
| Download: ML17221A536 (4) | |
See also: IR 05000335/1987023
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION
NBR: 8712070378
DOC. DATE: 87/12/01
NOTARIZED:
NO
FACIL: 50-335 St.
Lucie Plant>
Unit 1. Florida Power
5 Light Co.
50-389 St.
Lucie Plant>
Unit
2> Florida Power
4 Light Co.
AUTH. NAME
AUTHOR AFFILIATION
ERDT> A. R.
Region
2.
Ofc
o8 the Direc tor
RECIP. NAME
REC IP IENT AFFILIATION
WOODY C. O.
Florida Power
'.! Light Co.
DOCKET
05000335
05000389
SUBJECT:
Forwards
Insp
Rep ts 50-335/87-23
5 50-389/87-22
on 871019-23 '
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED: LTR
ENCL
SIZE:
TITLE: Qeneral
(50 Dkt)-Insp Rept/Notice
of Violation Response
NOTES:
REC IP lENT
ID CODE/NAME
PD2-2
COPIES
LlTR
ENCI
1
i.
REC IP IENT
ID CODE/NAME
TOUR IQNY> E
COPIES
LTTR ENCL
2
2
INTERNAL:
MORISSEAU
D
NRR/DOEA DER
NRR/DREP/RPB
NRR/PMAS/ILRB
OQC/HDS2
DEPY QI
ERNAL:
LPDR
NSI C
DEDRO
NRR/DLPG/PEB
NRR/DREP/EPB
NRR/DR IS
DI'R
O
EBERMAN, J
REQ
F I
RQN2
FILE
01
NRC
1
1
1
1
1
]
1
1
1
1
1
1
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
21
ENCL
21
pEt; p
Docket Nos. 50-335,
50-309
~
t
License
Nos.
Florida Power and Light Company
ATTN:
Mr. C. 0.
Moody
Group Vice President
Nuclear Energy Department
P. 0.
Box 14000
Juno
Beach,
FL
33408
Gentlemen:
SUBJECT:
(NRC INSPECTION
REPORT
NOS. 50-335/87-23
AND 50-389/87-22)
This refers
to the Nuclear Regulatory
Commission
!NRC) inspection
conducted
by
Milliam P. Kleinsorge
on October 19-23,
1987.
The inspection included
a review
of activities authorized for your St. Lucie facility.
At the conclusion of the
inspection,
the
findings
were
discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined
during
the inspection
are identified in the repor
.
Mithin
these
areas,
the inspection
consisted of selective
examinations
of procedures
and
representative
records,
interviews
with personnel,
and observation
of
activities in progress.
The inspection
findings indicate that certain activities appeared
to violate
NRC requirements.
The violation, references
to pertinent
requirements,
and
elements
to be included in your response
are described
in the enclosed
Notice
of Violation.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosures
will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter and its enclosures
are not subject to the
clearance
procedures
of the Office of Management
and Budget
as required
by the
Paperwork Reduction Act of 1980,
PL 96-51l.
Should you have
any questions
concerning this letter, please
contact us.
Sincerely,
8712070378
871201
ADQCK 05000335
6
Enclosures:
(See
page
2)
Alan R. Herdt, Chief
Engineering
Branch
Division of Reactor Safety
Flor'ida Power
and Light Company
OEQ 0
1 1987
Enclosures:
1.
2.
NRC Inspection Report
cc w/encls:
K. N. Harris, Vice President
St.
Lucie Nuclear Plant
J.
G. Boissy, Plant Manager
J.
B. Harper, Site
gA Superintendent
bcc w/encls:
NRC Resident
Inspector
Document Control
Desk
State of Florida
1einsorge: lb
J
P-/87
lake
g-/87
1I/z.f/87