ML17221A512

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-335/87-21 & 50-389/87-20 on 870906-1031 & Notice of Violation
ML17221A512
Person / Time
Site: Saint Lucie  
Issue date: 11/17/1987
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Woody C
Florida Power & Light Co
Shared Package
ML17221A513 List:
References
NUDOCS 8711230157
Download: ML17221A512 (3)


See also: IR 05000335/1987021

Text

ACCESSION

NBR

FACIL: 50-335

50-.389

AUTH. NAME

VERRELLIi D. M

REC1P. NAME

WOODYi C. O.

REGULATORY INFQRflATION DISTR IBUTION SYSTEM

< RIDS)

8711230157

DOC. DATE: 87/11/17

NOTARIZED:

NO

St.

! uci e Plant

Unit

1 i Flori da Power

';~ Light Co.

St.

Lucie Plant* Unit 2i Florida Power

8. Light Co.

AUTHOR AFFILIATION

Region

2i

Ofc of the Director

RECIPIENT AFFILIATION

Florida Power

'! Light Co.

DOCKET

N

05000335

0500038-'UBJECT:

Forwards

Insp Repts

50-335/87-21

5 50-389/87-20

on

870906-1031

5 notice of violation.

.DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED: LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

REC IF IENT

ID CODE/NAME

PD2-~

PD

INTERNAL:

AEOD

NRR

MORISSEAUi D

NRR/DOEA

D IR

NPR/DREP/RPB

NRR/PMAS/ ILRB

OGC/HDS

'ES

DEPY GI

TERNAL:

LPDR

NS I C.

COPIES

LTTR ENCL

1

1

1

1

2

1

REC IP IENT

ID CODE/NAME

TQURIGNY. E

DEDRO

NRR/DLPG/PEB

NRR/DREP/EPB

NRR/DRIS DIR

Q

BERMANi J

G FIL.

RGN2

F ILE

01

NRC

PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

21

ENCL

21

Docket Nos.

50-335,

50-389

License

Nos.

DPR-67,

NPF-16

Florida Power

and Light Company

ATTN:

Nr.

C. 0.

Moody

Group Vice President

Nuclear

Energy Department

P. 0.

Box 14000

Juno

Beach,

FL

33408

Ge'ntl.emen:

SUBJECT:

NOTICE OF VIOLATION

(NRC

INSPECTION

REPORT

NOS. 50-335/87-21

AND 50-389/87-20)

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

R.

V. Crlenjak

on

September

6 - October 31,

1987.

The inspection

included

a

review of activities authorized for your St.

Lucie facility.

At the conclusion

of the inspection,

the findings were discussed

with those

members of your staff

identified in the enclosed

inspection report.

Areas

examined

during

the

inspection

are

identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

The inspection

findings indicate that certain activities

appeared

to violate

NRC requirements.

The violations, with pertinent

references

and

elements

to

be included in your response,

are described

in the enclosed

Notices.

In accordance

with Section

2.790

of the

NRC's

"Rules of Practice",

Part 2,

Title 10,

Code

of

Federal

Regulations,

a

copy

of this letter

and its

enclosures will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,'lease

contact

us.

Sincerely,

David N. Verrelli, Chief

Reactor

Projects

Branch

1

Division of Reactor Projects

Enclosures:

(See

page

2)

8711230157

871117

PDR

ADOCK 05000335

6

PDR

Florida Power

and Light Company

0

Enclosures:

1.

Notice

of Violation

2.

NRC Inspection

Report

cc w/encls:

K.. N. Harris, Vice President

St.

Lucie Nuclear Plant

J.

G. Boissy, Plant Manager

J.

B. Harper, Site

QA Superintendent

bcc w/encls:

NRC Resident

Inspector

Document Control

Desk

State'of Florida

RII

HC

istensen:er

11/>'7/87

RII

ilson

11/('1 /87