ML17221A512
| ML17221A512 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 11/17/1987 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Woody C Florida Power & Light Co |
| Shared Package | |
| ML17221A513 | List: |
| References | |
| NUDOCS 8711230157 | |
| Download: ML17221A512 (3) | |
See also: IR 05000335/1987021
Text
ACCESSION
NBR
FACIL: 50-335
50-.389
AUTH. NAME
VERRELLIi D. M
REC1P. NAME
WOODYi C. O.
REGULATORY INFQRflATION DISTR IBUTION SYSTEM
< RIDS)
8711230157
DOC. DATE: 87/11/17
NOTARIZED:
NO
St.
! uci e Plant
Unit
1 i Flori da Power
';~ Light Co.
St.
Lucie Plant* Unit 2i Florida Power
8. Light Co.
AUTHOR AFFILIATION
Region
2i
Ofc of the Director
RECIPIENT AFFILIATION
Florida Power
'! Light Co.
DOCKET
N
05000335
0500038-'UBJECT:
Forwards
Insp Repts
50-335/87-21
5 50-389/87-20
on
870906-1031
.DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED: LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
REC IF IENT
ID CODE/NAME
PD2-~
INTERNAL:
MORISSEAUi D
NRR/DOEA
D IR
NPR/DREP/RPB
NRR/PMAS/ ILRB
OGC/HDS
'ES
DEPY GI
TERNAL:
LPDR
NS I C.
COPIES
LTTR ENCL
1
1
1
1
2
1
REC IP IENT
ID CODE/NAME
TQURIGNY. E
DEDRO
NRR/DLPG/PEB
NRR/DREP/EPB
NRR/DRIS DIR
Q
BERMANi J
G FIL.
RGN2
F ILE
01
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
21
ENCL
21
Docket Nos.
50-335,
50-389
License
Nos.
Florida Power
and Light Company
ATTN:
Nr.
C. 0.
Moody
Group Vice President
Nuclear
Energy Department
P. 0.
Box 14000
Juno
Beach,
FL
33408
Ge'ntl.emen:
SUBJECT:
(NRC
INSPECTION
REPORT
NOS. 50-335/87-21
AND 50-389/87-20)
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
R.
V. Crlenjak
on
September
6 - October 31,
1987.
The inspection
included
a
review of activities authorized for your St.
Lucie facility.
At the conclusion
of the inspection,
the findings were discussed
with those
members of your staff
identified in the enclosed
inspection report.
Areas
examined
during
the
inspection
are
identified in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
The inspection
findings indicate that certain activities
appeared
to violate
NRC requirements.
The violations, with pertinent
references
and
elements
to
be included in your response,
are described
in the enclosed
Notices.
In accordance
with Section
2.790
of the
NRC's
"Rules of Practice",
Part 2,
Title 10,
Code
of
Federal
Regulations,
a
copy
of this letter
and its
enclosures will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter,'lease
contact
us.
Sincerely,
David N. Verrelli, Chief
Reactor
Projects
Branch
1
Division of Reactor Projects
Enclosures:
(See
page
2)
8711230157
871117
ADOCK 05000335
6
Florida Power
and Light Company
0
Enclosures:
1.
Notice
of Violation
2.
NRC Inspection
Report
cc w/encls:
K.. N. Harris, Vice President
St.
Lucie Nuclear Plant
J.
G. Boissy, Plant Manager
J.
B. Harper, Site
QA Superintendent
bcc w/encls:
NRC Resident
Inspector
Document Control
Desk
State'of Florida
RII
HC
istensen:er
11/>'7/87
RII
ilson
11/('1 /87