ML17221A516

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-335/87-27 & 50-389/87-26 on 871026-30 & Notice of Violation
ML17221A516
Person / Time
Site: Saint Lucie  
Issue date: 11/18/1987
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17221A517 List:
References
NUDOCS 8711230286
Download: ML17221A516 (3)


See also: IR 05000335/1987027

Text

RFGULATORY INFORMATION DISTRIBUTION SYSTEM (BIDS>

ACCESSION

NBR: 8711230286

DQC. DATE: 87/11/18

NQT*RIZFD:

NQ

,FACIL 50335 Bt. Lucie

Plant'nit ii Florida

PoUJer

8c Light Co.

50-389 St.

Lucie Planti

Unit 2

Florida Poeer

5 Light Co.

AUTH. NAME

AUTHOR AFFILIATION

COLLINB. D. M.

Region

2i

Qfc of the Director

RECIP. NAME

RECIPIENT AFFILIATION

4lOODYi C. 0,

Flov ida Power i Light Co.

DOCV,E r

0500C>335

05000389

SUBJECT:

Forwards

Insp Repts

50-335/87-27

0 50-389/87-26

on 871026-30

5 notice of violation.

DISTRIBUTION CODE:

IE06D

COPIES

RECEIVED: LTR g ENCL J

SIZE:

TITLE: Environ

0 Radiological

(50 DKT)-Insp Rept/Notice

of Violation Respons

f NOTES:

REC IP IENT

ID CODE/NAME

PD2-2

LA

TOUR IGNYi E

COPIES

LTTR ENCL

1

0

1

i.

RECIPIENT

ID CODE/NAME

PD2-2

PD

COPIES

LTTR ENCL

1

1

INTERNAL: AEQD/DOA

NMSS/LLOB

NRR/DLPG/PEB

NRR/DREP/EP8

. N

A~ 'B

02

RES

DEPY GI

RGN2/DRSS/EPRPB

1

1

1

1

1

1

AEOD/DBP

NMSS/SGOB

NRR/DOEA/EAB

NRR/DREP/RPG

OGC/HDB2

REB

RGN2

FILE

01

RGN4

MURRAY> 8

1

1

1

1

2

2

1

1

1

1

1

1

i,

TERNAL:

LPDR

NBIC

1

1

NRC

PDR

1

1

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

23

ENCL

22

Docket Nos. 50-335,

50-389

~

~

License

Nos.

DPR-67,

NPF-16

Florida Power and Light Company

ATTN:

Mr. C. 0.

Woody

Group Vice President

Nuclear Energy Department

P. 0.

Box 14000

Juno

Beach,

FL

33408

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION REPORT

NOS. 50-335/87-27

AND 50-389/87-26)

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

C.

H. Bassett

on October

26-30,

1987.

The inspection

included

a review of

activities authorized for your St. Lucie facility.

At the conclusion of the

inspection,

the findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within

~

~

~

~

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of

activities in progress.

The inspection

findings indicate that certain activities

appeared

to violate

NRC requirements.

The violation, references

to pertinent

requirements,

and

elements

to be included in your response

are described

in the enclosed

Notice

of Violation.

In accordance

with Section 2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosures

will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter and its enclosures

are not subject to the

clearance

procedures

of the Office of Management

and Budget

as required

by the

Paperwork

Reduction Act of 1980,

PL 96-511.

Florida Power and Light Company

Should you have

any questions

concerning this letter,

please

contact us.

Sincerely,

Enclosures:

1.

Notice of Violation

2.

Inspection

Report

cc w/encls:

K. N. Harris, Vice President

St. Lucie Nuclear Plant

J.

G. Boissy, Plant Hanager

J.

B. Harper, Site

gA Superintendent

bcc w/encls:

NRC Resident Inspector

Document Control

Desk

State of Florida

Douglas

N. Collins, Chief

Emergency

Preparedness

and

Radiological Protection

Branch

Division of Radiation Safety

and Safeguards

RI

R I

CBassett

Mosey

11/ ()/87

11/ /(y /87

BWils n

11//7/87