Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000335/1992007 + (18:58:46, 8 January 2025)
- IR 05000335/1992009 + (18:58:47, 8 January 2025)
- ML17227A541 + (18:58:49, 8 January 2025)
- ML17227A538 + (18:58:50, 8 January 2025)
- ML17227A539 + (18:58:50, 8 January 2025)
- ML17227A532 + (18:58:51, 8 January 2025)
- ML17227A525 + (18:58:53, 8 January 2025)
- ML17227A530 + (18:58:53, 8 January 2025)
- 05000335/LER-1992-005-01, :on 920629,discovered That EDG 1B Declared Out of Svc on 920618 W/O Two Operable Flow Paths & W/O Required Vol in Boric Acid Makeup Tank.Caused by Personnel Error. Personnel Counseled & Pump Returned to Svc + (18:58:57, 8 January 2025)
- L-92-217, Special Rept:On 920630,DG 1A Declared Out of Svc in Order to Perform Preventative Maint on Air Start Sys.Caused by Spurious Operation of Trip Which Is Bypassed in Emergency Operating Mode.Temp Switches Repaired & Reinstalled + (18:58:58, 8 January 2025)
- L-92-212, NPDES Noncompliance Notification:On 920714,discovered Loss of Pump Suction on Hydrazine Chemical Feed Sys Tanks, Resulting in Discharge of 72 Lbs of Hydrazine to Storm Drain Sys.Caused by Open Drain Valve.Investigation Underway + (18:58:59, 8 January 2025)
- ML17227A514 + (18:59:01, 8 January 2025)
- ML17227A513 + (18:59:02, 8 January 2025)
- ML17227A511 + (18:59:03, 8 January 2025)
- ML17227A509 + (18:59:04, 8 January 2025)
- L-92-192, Responds to Violations Noted in Insp Repts 50-335/92-09 & 50-389/92-09.Corrective Actions:Contractor Orientation Procedure Will Be Developed W/Emphasis on Attention to Detail & Procedure Compliance + (18:59:05, 8 January 2025)
- L-92-194, Informs That Util Currently Does Not Plan to Replace or Downgrade Qualification of Safety Injection Tank Level & Pressure Instruments,In Response to NRC Re Reg Guide 1.97 + (18:59:06, 8 January 2025)
- IR 05000335/1992010 + (18:59:10, 8 January 2025)
- ML17227A504 + (18:59:12, 8 January 2025)
- L-92-202, Monthly Operating Repts for June 1992 for St Lucie Units 1 & 2 + (18:59:13, 8 January 2025)
- ML17227A501 + (18:59:15, 8 January 2025)
- ML17227A498 + (18:59:16, 8 January 2025)
- L-92-189, Forwards Response to GL 92-01,Rev 1, Reactor Vessel Structural Integrity + (18:59:17, 8 January 2025)
- 05000389/LER-1992-001, :on 920421,three of Four Local Power Density pre-trips in RPS Alarmed & Turbine Remained Tied to Sys Grid.Caused by Inadequate Core Axial Shape Index Mgt Guidelines.Procedures Changed + (18:59:19, 8 January 2025)
- L-92-172, Responds to Violations Noted in Insp Rept 50-389/92-07. Corrective Actions:On 920421,main Steam Safety Valve Testing Stopped & Gauge Calibr Data Sheets Reviewed & Containment Pressure Sensing Lines Will Be Labeled + (18:59:20, 8 January 2025)
- IR 05000335/1992005 + (18:59:22, 8 January 2025)
- ML17227A489 + (18:59:24, 8 January 2025)
- ML17227A488 + (18:59:25, 8 January 2025)
- ML17227A486 + (18:59:26, 8 January 2025)
- IR 05000335/1992006 + (18:59:38, 8 January 2025)
- ML17227A481 + (18:59:39, 8 January 2025)
- ML17227A479 + (18:59:40, 8 January 2025)
- IR 05000335/1992012 + (18:59:42, 8 January 2025)
- ML17227A475 + (18:59:44, 8 January 2025)
- L-92-184, NPDES Noncompliance Notification:On 920507,effluent Ph of Sewage Treatment Plant Noted Below 6.0 Std Units Required by NPDES Permit.Sodium Carbonate Added & Average Flow from Sewage Plant Diluted by Circulating Water Flow + (18:59:45, 8 January 2025)
- ML17227A474 + (18:59:45, 8 January 2025)
- L-92-180, Forwards St Lucie Site Dune survey,920604.Dune Condition Acceptable Per Criteria in TS 5.1.3 + (18:59:49, 8 January 2025)
- 05000389/LER-1992-003-03, :on 920526,EDG 2B Inadvertently Actuated When Relay Installed in Cubicle 1 of 4,160-volt Bus 2B3.Caused by Design Error.Electrical Loads Returned to Normal & Test Circuit Design Will Be Changed + (18:59:53, 8 January 2025)
- 05000335/LER-1992-004-02, :on 920521,relay Time Delay Settings Altered Due to Personnel Error.Remaining Load Sequence Timers on Both Units 1 & 2 Were Inspected to Ensure Thumbwheel Switches Were Set Correctly + (18:59:55, 8 January 2025)
- TAC:M68608 + (18:59:57, 8 January 2025)
- ML17227A463 + (18:59:57, 8 January 2025)
- ML17227A460 + (18:59:58, 8 January 2025)
- ML17227A459 + (18:59:59, 8 January 2025)
- ML17227A457 + (19:00:01, 8 January 2025)
- L-92-170, Monthly Operating Repts for May 1992 for St Lucie,Units 1 & 2 + (19:00:04, 8 January 2025)
- ML17227A455 + (19:00:10, 8 January 2025)
- ML17227A454 + (19:00:11, 8 January 2025)
- ML17227A452 + (19:00:12, 8 January 2025)
- L-92-140, Forwards Comments Re Written Exams Administered by NRC on 920427 at Plant + (19:00:13, 8 January 2025)
- ML17227A450 + (19:00:15, 8 January 2025)
- ML17227A448 + (19:00:16, 8 January 2025)