JUI 07 199Z
Docket Nos.
50-335,
50-389
License
Nos.
Florida Power
8 Light Company
ATTN:
J.
H. Goldberg
President
Nuclear Division
P. 0.
Box 14000
Juno
Beach,
33408-0420
Gentlemen:
SUBJECT:
NRC
INSPECTION
REPORT
NOS. 50-335/92-10
AND 50-389/92-10
This refers to the inspection
conducted
by S.
A. Elrod of this office on
Hay 3
June 8,
1992.
The inspection
included
a review of activities
authorized for your St.
Lucie facility.
At the'onclusion of the inspection,
the findings were discussed
with those
members of your staff identified in the
enclosed report.
Areas
examined during the inspection are,.identified
in the report.
Within
~
~
~
~
~
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
Within the scope of the inspection, violations or deviations
were not
identified.
In accordance
with 10 CFR 2.790 of the NRC's
".Rules of Practice,"
a copy of
this letter
and its enclosure will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
ORIGINALSIGNED BY
~)
KERRY D. LANDIS
Marvin V. Sinkule, Chief
Reactor Projects
Branch
2
Division of Reactor Projects
Enclosure:
NRC Inspection
Report
cc w/encl:
D. A. Sager
Site Vice President
St.
Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0128
cc w/encl:
See
page
2
'P207i70i98
920707
poR
Aoocx osooosss
0
Florida Power
& Light Co.
cc w/encl cont'd:
R.
E. Grazio, Director
Nuclear Licensing
Florida Power
and Light Company
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
G. J. Boissy
Plant General
Nanager
St. Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0128
Harold F. Reis,
Esq.
Newman
& Holtzinger.
1615
L Street,
NW
D.
C.
20036
John T. Butler,
Esq.
Steel,
Hector and Davis
400 Southeast
Financial
Center
Miami,
FL
33131-2398
Jacob
Daniel
Nash
Office of Radiation Control
Department of Health
and
Rehabilitative Services
1317 Winewood Boulevard
Tallahassee,
FL
32399-0700
Administrator
Department of Environmental
Regulation
Power Plant Siting Section
State of Florida
2600 Blair Stone
Road
Tallahassee,
FL
32301
Jack Shreve
Public Counsel
Office of the Public Counsel
c/o The Florida Legislature
111 West Madison Avenue,
Room 812
Tallahassee,
FL
32399-1400
JUP () "/ 1992
Robert
G. Nave, Director
Emergency
Management
Department of Community Affairs
2740 Centerview Drive
Tallahassee,
FL
32399-2100
James
V. Chisholm
County Administrator
St. Lucie County
2300 Virginia Avenue
Fort Pierce,
FL
34982
Charles
B. Brinkman
Washington Nuclear Operations
ABB Combustion
Engineering,
Inc.
12300 Twinbrook Parkway,
Ste.
330
Rockville,
HD
20852
bcc w/encl:
K. Landis, RII
J. Johnson,
RII
Document Control
Desk
NRC Resident
Inspector
U.S. Nuclear Regulator
Comm.
7585 South
Highway AIA
Jenson
Beach,
FL
33457
'P
R chin
07/7 /92
RII:,DRP
KLanais
07/
/92