Discusses 920615-16 Senior Managers Meeting to Evaluate Nuclear Safety Performance of Operating Reactors,Fuel Facilities & Other Matls Licensees.Plant Was Noted W/High Level of Safety Performance & Met Criteria for Recognition
ML17227A498
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/30/1992
From: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
References
NUDOCS 9207100050
Download: ML17227A498 (6)


Text

s4

~P,g RE+0~

~o O

I cA0

+0

+>>*+>>

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 June 30, 1992 Docket Nos. 50-335, 50-389 Florida Power and Light Company ATTN:

Hr. J.

H. Goldberg President Nuclear P. 0.

Box 14000 Juno Beach, FL 33408-0420 Gentlemen:

On June 15 and 16,

1992, NRC senior managers met to evaluate the nuclear safety performance of operating reactors, fuel facilities, and other materials licensees.

The NRC conducts this meeting semiannually to determine if the safety performance of the various licensees exhibits sufficient weaknesses to warrant increased NRC attention.

In addition, at this meeting, senior managers identify specific plants that have demonstrated a level of safety performance that deserves formal NRC recognition.

At the June 1992 Senior Hanagement Heeting, the St. Lucie nuclear power plant was identified as having achieved a high level of safety performance and met criteria for recognition of its performance.

In identifying such plants, senior managers perform an evaluation of perfor-mance in many areas including operational

safety, self-assessment, problem resolution, and plant management organization and oversight.

NRC senior management recognizes that management involvement in all phases of plant operation, the dedicated and knowledgeable staff that supports plant activities, and the commitment to safety throughout the organization are necessary to achieve the level of performance demonstrated by the St.

Lucie nuclear power plant.

We commend you and your staff for achieving a high level of safety performance.

Your achievement is the result of dedicated efforts from your staff and is a positive example to the industry.

The greatest challenge that you now face is to maintain this level of perfor-mance and not to rest on past achievements.

Continued management involvement A)9 9p07i00050 820630 PDR ADOCK 05000335'tp

'DR NI(C pg~

Cgpgg ~>~

I'

\\

1

Florida Power and Light Company and support, and dedicated efforts from your staff to identify and promptly correct problems, are necessary for you to continue to meet this difficult challenge.

Sincerely, Original Signed By; James M'. Taylor James H. Taylor Executive Director for Operations cc:

See next page bcc:

K. Landis, RII J. Norris, NRR Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Commission 7585 South Highway AIA Jensen

Beach, FL 33457 DISTRIBUTION:

Central File SDEbneter JANorris NNarkley PDR SAVarga JGPartlow EDO R/F~

LPEB R.F.

GCLainas GGZech JHTaylor HHBerkow LPlisco OFC HAH SDEbneter DATE b

v 92

NRR EHur 1 e DEDO JHSniezek 92 NT ylor 92 92 OFFICIAL RECORD COPY Document Name:

LUCIE.FIN

Florida Power and Light Company and support, and dedicated efforts from your staff to identify and promptly correct problems, are necessary for you to continue to meet this difficult challenge.

Sincerely, Original Signed By<

lames M. Taylot James H. Taylor Executive Director for Operations cc:

See next page bcc:

K. Landis, RII J. Norris, NRR Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Commission 7585 South Highway AIA Jensen

Beach, FL 33457 DISTRIBUTION:

Central File SDEbneter JANorris HHarkley PDR SAVarga JGPartlow EDO R/F2 LPEB R.F.

GCLainas GGZech JHTaylor HHBerkow LPlisco OFC NAM SDEbneter DATE b

2 92 0:NRR EHurle DEDO JHSniezek 92 JHT ylor 92

/92 OFFICIAL RECORD COPY Document Name:

LUCIE.FIN GuvUG2

1

'h

) '

'h I

+k 4

~

+

g 1"

I

't

Florida Power and Light Company CC:

Senior Resident Inspector St. Lucie Plant U.S. Nuclear Regulatory Commission 7585 S.

Hwy A1A Jensen

Beach, FL 33457 R.

E. Grazio, Director Nuclear Licensing Florida Power and Light Company P. 0.

Box 14000 Juno

Beach, FL 33408-0420 Regional Administrator, RII U. S. Nuclear. Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Harold F. Reis, Esq.

Newman 5 Holtzinger 1615 L Street, NW Washington, D.

C.

20036 John T. Butler, Esq.

Steel, Hector and Davis 400 Southeast Financial Center Miami, FL 33131-2398 Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, FL 32301 Jack Shreve Public Counsel Office of the Public Counsel c/o The Florida Legislature 111 West Madison Avenue, Room 812 Tallahassee, FL '2399-1400 Robert G. Nave, Director Emergency Management Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 James V. Chisholm County Administrator St. Lucie County 2300 Virginia Avenue Fort Pierce, FL 34982 Charles B. Brinkman Washington Nuclear Operations ABB Combusion Engineering, Inc Suite 330 12300 Twinbrook Parkway Rockville, MD 20852