s
"
JUN 1R 1992
Docket Nos.
50-335,
50-389
License
Nos.
Florida Power
and Light Company
ATTN: Mr. J.
H. Goldberg
President
Nuclear Division
. P.O.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
Subject:
SYSTEMATIC ASSESSMENT
OF LICENSEE
PERFORMANCE
(NRC
INSPECTION
REPORT
NOS. 50-335/92-06
AND 50-389/92-06)
The
NRC Systematic
Assessment
of Licensee
Performance
(SALP) has
been
completed for your St.
Lucie facility.
The facility was evaluated for the
period November
1,
1990, through
Hay 2,
1992.
The results of the evaluation
are documented
in the enclosed Initial SALP Report.
This report will be
discussed
with you at
a public meeting to be held at the St. Lucie facility on
June
30,
1992, at 10:00 a.m.
The performance of your St. Lucie facility was evaluated
in the functional
areas of Plant Operations,
Radiological Controls, Maintenance/Surveillance,
Emergency
Preparedness,
Security,
Engineering/Technical
Support,
and Safety
Assessment/guality
Verification.
The assessment
indicates that St.
Lucie continued,
and improved upon, its
history of superior performance.
The assessment
assigned
superior performance
ratings to the facility in all of the SALP,functional
areas,
a condition that
is rarely achieved
by a nuclear
power plant.
This level of performance
can only be achieved
by teamwork at all levels
and
a
dedication to excellence
by everyone
associated
with the facility. It is
indicative of proactive senior management
setting high standards
of safety
performance
and providing the resources
necessary
to achieve
those
standards.
We commend you and your entire staff for this truly superior performance.
Any comments
you have concerning
our evaluation of the performance of your
St.
Lucie facility should
be submitted to this office within 30 days following
the date of our meeting.
These
comments will be considered
in the development
of the Final
SALP Report.
Your comments
and
a summary of our meeting will be
issued
as
an appendix to the Final
SALP Report.
n
~ ~ n ~p
~ <
l4'1 0i l
92070102BB 920&f2
ADOCK 05000335
8
I
"
Florida Power
8 Light Company
JUN 12 19gg
Should you have
any questions
concerning this letter,
we will be glad to
discuss
them with you.
Sincerely,
Original signed
by
Enclosure:
Initial SALP Report - St.
Lucie
cc w/encl:
D. A. Sager
Site Vice President
St.
Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0128
R.
E. Grazio, Director
Nuclear Licensing
Florida Power
and Light Company
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
G. J. Boissy
Plant General
Manager
St. Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0128
Harold F. Reis,
Esq.
Newman
5 Holtzinger
1615
L Street,
NW
D.
C.
20036
John T. Butler,
Esq.
Steel,
Hector
and Davis
400 Southeast
Financial
Center
Miami,
FL
. 33131-2398
Jacob Daniel
Nash
Office of Radiation Control
Department of Health
and
Rehabilitative Services
1317 Winewood Boulevard
Tallahassee,
FL
32399-0700
cc w/encl cont'd:
See
page
3
Stewart
D. Ebneter
Regional Administrator
Florida Power
& Light Company
cc w/encl cont'd:
Administrator
Department of Environmental
Regulation
Power Plant Siting Section
State of Florida
2600 Blair Stone
Road
Tallahassee,
FL
32301
Jack Shreve
Public Counsel
Office of the Public Counsel
c/o The Florida Legislature
111 West Hadison
Avenue,
Room 812
Tallahassee,
FL, 32399-1400
Robert
G. Nave, Director
Emergency
Hanagement
Department of Community Affairs
2740 Centerview Drive
Tallahassee,
FL
32399-2100
James
V. Chisholm
County Administrator
St. Lucie County
2300 Virginia Avenue
Fort Pierce,
FL
34982
Charles
B. Brinkman
Washington Nuclear Operations
ABB Combustion
Engineering,
Inc.
12300 Twinbrook Parkway,
Suite
330
Rockville,
HD
20852
bcc w/encl:
The Chairman
K. C. Rogers,
Commissioner
J.
R. Curtiss,
Commissioner
F. J.
Remick,
Commissioner
J.
H. Taylor,
H. L. Thompson, Jr.,
J.
F. Wechselberger,
Regional
Coordinator,
T.
E. Hurley,
S. Varga,
H.
N. Berkow,
J.
A. Norris,
bcc w/encl cont'd:
See
page
4
I
-
Florida Power
8 Light Company
bcc w/encl cont'd:
F. Allenspach,
SALP Coordinator,
Regional Administrators,
RI, RIII
RIV, and
RV
K. Clark, RII,
PAO
M. V. Sinkule,
DRP, RII
K. D. Landis,
DRP, RII
R. Schin,
DRP, RII
TSS, RII
NRC Resident
Inspector
DRS and
DRSS Branch Chiefs,
and Section Chiefs
Document Control
Desk
SEE
PREVIOUS
CONCURRENCE
PAGE
RII:DRP
RII:DRP
RII:DRP
RII:DRP
RII:DRSS
RII:DRS
RSchin
KLandis
HSinkule
JJohnson
JStohr
AGibson
06/
/92
06/
/92
06/
/92
06/
/92
06/
/92
06/
/92
NRR
RI I:DRP
HBerkow
JNorris
SElrod
06/
/92
06/
/92
06/
/92
RI I:DRP
LReyes
06/
/92
Florida Power
& Light
mpany
bcc w/encl cont'd
DRS and
DRSS
anch Chiefs,
and Secti
Chiefs
Document
ntrol Desk
RI 'P
RII:
P
RII:DRP
po'r
R c in
-
KL
ss
HSinkule
06/q /92
06/Q /92
06/)0/92
NR
NR
R
)DRP
erkow
Norris
S
rod
06/Q /92
06/9 /92
06/) i /92
RII
son
6//(/92
RII
eyes
06'(/92
JSt
r
06/~Q/92
son
06/IO/92
RII:
S
RII:D S