ML17227A479

From kanterella
Jump to navigation Jump to search
Forwards SALP Repts 50-335/92-06 & 50-389/92-06 Covering 901101-920502.Commends Util for Superior Performance
ML17227A479
Person / Time
Site: Saint Lucie  
Issue date: 06/12/1992
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17227A480 List:
References
NUDOCS 9207010288
Download: ML17227A479 (6)


See also: IR 05000335/1992006

Text

s

"

JUN 1R 1992

Docket Nos.

50-335,

50-389

License

Nos.

DPR-67,

NPF-16

Florida Power

and Light Company

ATTN: Mr. J.

H. Goldberg

President

Nuclear Division

. P.O.

Box 14000

Juno

Beach,

FL

33408-0420

Gentlemen:

Subject:

SYSTEMATIC ASSESSMENT

OF LICENSEE

PERFORMANCE

(NRC

INSPECTION

REPORT

NOS. 50-335/92-06

AND 50-389/92-06)

The

NRC Systematic

Assessment

of Licensee

Performance

(SALP) has

been

completed for your St.

Lucie facility.

The facility was evaluated for the

period November

1,

1990, through

Hay 2,

1992.

The results of the evaluation

are documented

in the enclosed Initial SALP Report.

This report will be

discussed

with you at

a public meeting to be held at the St. Lucie facility on

June

30,

1992, at 10:00 a.m.

The performance of your St. Lucie facility was evaluated

in the functional

areas of Plant Operations,

Radiological Controls, Maintenance/Surveillance,

Emergency

Preparedness,

Security,

Engineering/Technical

Support,

and Safety

Assessment/guality

Verification.

The assessment

indicates that St.

Lucie continued,

and improved upon, its

history of superior performance.

The assessment

assigned

superior performance

ratings to the facility in all of the SALP,functional

areas,

a condition that

is rarely achieved

by a nuclear

power plant.

This level of performance

can only be achieved

by teamwork at all levels

and

a

dedication to excellence

by everyone

associated

with the facility. It is

indicative of proactive senior management

setting high standards

of safety

performance

and providing the resources

necessary

to achieve

those

standards.

We commend you and your entire staff for this truly superior performance.

Any comments

you have concerning

our evaluation of the performance of your

St.

Lucie facility should

be submitted to this office within 30 days following

the date of our meeting.

These

comments will be considered

in the development

of the Final

SALP Report.

Your comments

and

a summary of our meeting will be

issued

as

an appendix to the Final

SALP Report.

n

~ ~ n ~p

~ <

l4'1 0i l

92070102BB 920&f2

PDR

ADOCK 05000335

8

PDR

I

"

Florida Power

8 Light Company

JUN 12 19gg

Should you have

any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

Original signed

by

Enclosure:

Initial SALP Report - St.

Lucie

cc w/encl:

D. A. Sager

Site Vice President

St.

Lucie Nuclear Plant

P. 0.

Box 128

Ft. Pierce,

FL

34954-0128

R.

E. Grazio, Director

Nuclear Licensing

Florida Power

and Light Company

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

G. J. Boissy

Plant General

Manager

St. Lucie Nuclear Plant

P. 0.

Box 128

Ft. Pierce,

FL

34954-0128

Harold F. Reis,

Esq.

Newman

5 Holtzinger

1615

L Street,

NW

Washington,

D.

C.

20036

John T. Butler,

Esq.

Steel,

Hector

and Davis

400 Southeast

Financial

Center

Miami,

FL

. 33131-2398

Jacob Daniel

Nash

Office of Radiation Control

Department of Health

and

Rehabilitative Services

1317 Winewood Boulevard

Tallahassee,

FL

32399-0700

cc w/encl cont'd:

See

page

3

Stewart

D. Ebneter

Regional Administrator

Florida Power

& Light Company

cc w/encl cont'd:

Administrator

Department of Environmental

Regulation

Power Plant Siting Section

State of Florida

2600 Blair Stone

Road

Tallahassee,

FL

32301

Jack Shreve

Public Counsel

Office of the Public Counsel

c/o The Florida Legislature

111 West Hadison

Avenue,

Room 812

Tallahassee,

FL, 32399-1400

Robert

G. Nave, Director

Emergency

Hanagement

Department of Community Affairs

2740 Centerview Drive

Tallahassee,

FL

32399-2100

James

V. Chisholm

County Administrator

St. Lucie County

2300 Virginia Avenue

Fort Pierce,

FL

34982

Charles

B. Brinkman

Washington Nuclear Operations

ABB Combustion

Engineering,

Inc.

12300 Twinbrook Parkway,

Suite

330

Rockville,

HD

20852

INPO

bcc w/encl:

The Chairman

K. C. Rogers,

Commissioner

J.

R. Curtiss,

Commissioner

F. J.

Remick,

Commissioner

J.

H. Taylor,

EDO

H. L. Thompson, Jr.,

EDO

J.

F. Wechselberger,

Regional

Coordinator,

EDO

T.

E. Hurley,

NRR

S. Varga,

NRR

H.

N. Berkow,

NRR

J.

A. Norris,

NRR

bcc w/encl cont'd:

See

page

4

I

-

Florida Power

8 Light Company

bcc w/encl cont'd:

F. Allenspach,

SALP Coordinator,

NRR

Regional Administrators,

RI, RIII

RIV, and

RV

K. Clark, RII,

PAO

M. V. Sinkule,

DRP, RII

K. D. Landis,

DRP, RII

R. Schin,

DRP, RII

TSS, RII

NRC Resident

Inspector

DRS and

DRSS Branch Chiefs,

and Section Chiefs

Document Control

Desk

SEE

PREVIOUS

CONCURRENCE

PAGE

RII:DRP

RII:DRP

RII:DRP

RII:DRP

RII:DRSS

RII:DRS

RSchin

KLandis

HSinkule

JJohnson

JStohr

AGibson

06/

/92

06/

/92

06/

/92

06/

/92

06/

/92

06/

/92

NRR

NRR

RI I:DRP

HBerkow

JNorris

SElrod

06/

/92

06/

/92

06/

/92

RI I:DRP

LReyes

06/

/92

Florida Power

& Light

mpany

bcc w/encl cont'd

TSS

DRS and

DRSS

anch Chiefs,

and Secti

Chiefs

Document

ntrol Desk

RI 'P

RII:

P

RII:DRP

po'r

R c in

-

KL

ss

HSinkule

06/q /92

06/Q /92

06/)0/92

NR

NR

R

)DRP

erkow

Norris

S

rod

06/Q /92

06/9 /92

06/) i /92

RII

RP

son

6//(/92

RII

eyes

06'(/92

JSt

r

06/~Q/92

son

06/IO/92

RII:

S

RII:D S