Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17275A635 + (13:49:44, 8 January 2025)
- ML17275A631 + (13:49:46, 8 January 2025)
- IR 05000397/1980004 + (13:50:47, 8 January 2025)
- IR 05000397/1980002 + (13:50:49, 8 January 2025)
- GO2-80-199, Responds to IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Facility Does Not Use Westinghouse Type W-2 Control Switches in Any Safety Sys Design + (13:50:50, 8 January 2025)
- ML17275A624 + (13:50:50, 8 January 2025)
- GO2-80-200, Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies. Initial Response of 790918 Indicated Action Would Be Taken.Responses Received from Suppliers Indicate No Operational Problems Experienced w/safety-related Pumps + (13:50:52, 8 January 2025)
- GO2-80-196, Responds to IE Bulletin 79-03A, Longitudinal Weld Defects in ASME SA-312,Type 304 Stainless Steel Pipe. Initial Response of 800808 Indicated Review Due by 800915.Due to Delay in Obtaining Info,Review Will Be Completed 801103 + (13:50:53, 8 January 2025)
- GO2-80-215, Requests Addl NRC Branch Reviews Required on Util Safety Relief Valve Rept.Potential Need Exists for Review of Refinements to Generic Mark II Condensation Oscillation Load or Alternative Load Definition & Methodology + (13:50:55, 8 January 2025)
- GO2-80-211, Deficiency Rept Re Primary Containment Pressure Monitoring Instrumentation Sensing Line Routing to Initiate Eccs.Ped 220-I-324 & -329 Issued,Reassigning Instrumentation Sensing Lines to Penetrations Below Instrument Rack Elevation + (13:50:57, 8 January 2025)
- ML17275A617 + (13:50:57, 8 January 2025)
- GO2-80-212, Deficiency Rept Re Lack of Installation Documentation for Class IE Cables in Main Control Room Raceways.Evaluation Revealed Inadequate Insp Criteria & QA Program for Installation of Electrical Cables.Procedures Being Revised + (13:50:59, 8 January 2025)
- ML17275A615 + (13:50:59, 8 January 2025)
- GO2-80-210, Confirms 800930 & 1001 Meeting Schedules W/Reactor Sys Branch & Structural Engineering Branch,Respectively,Re Sacrificial Shield Wall at Facility + (13:51:01, 8 January 2025)
- ML17275A612 + (13:51:06, 8 January 2025)
- GO2-80-202, Deficiency Rept Re Large Diameter Piping Found to Have Less than ASME Code Required Min Wall Thickness.Caused by Overgrinding While Preparing Weld Profiles for ASME Section 11 Inservice Insp.Contractors to Revise Procedures + (13:51:07, 8 January 2025)
- ML17275A611 + (13:51:07, 8 January 2025)
- GO2-80-208, Deficiency Rept Re Power Piping Co Beam attachment,HS-142, Used in Rigid Sway Brace Assemblies Supplied W/Undersized Welds.Caused by Bracket Design Deficiency.Stop Work Order Issued to All Contractors Installing Subj Brackets + (13:51:09, 8 January 2025)
- GO2-80-203, Forwards Oath of Affirmation Inadvertently Omitted from Dl Renberger to Bj Youngblood + (13:51:10, 8 January 2025)
- ML17275A602 + (13:51:12, 8 January 2025)
- ML17275A603 + (13:51:12, 8 January 2025)
- ML17275A592 + (13:51:13, 8 January 2025)
- GO2-80-174, Responds to IE Bulletin 79-03A, Longitudinal Weld Defects in ASME SA-312,Type 304 Stainless Steel Pipe. Two Contracts Identified Where Matl May Be Used.Matl List Requested from Contractors + (13:51:14, 8 January 2025)
- GO2-80-198, Forwards Util 800910 Transmittal Ltr & Certificate of Svc for Amend 10 to FSAR + (13:51:15, 8 January 2025)
- ML17275A589 + (13:51:17, 8 January 2025)
- IR 05000397/1980011 + (13:51:19, 8 January 2025)
- IR 05000397/1980012 + (13:51:21, 8 January 2025)
- ML17275A585 + (13:51:22, 8 January 2025)
- ML17275A583 + (13:51:23, 8 January 2025)
- GO2-80-189, Responds to IE Bulletin 80-19.No mercury-wetted Matrix Relays Used in Reactor Protective Sys or Any safety-related Sys + (13:51:24, 8 January 2025)
- ML17275A581 + (13:51:26, 8 January 2025)
- ML17275A580 + (13:51:26, 8 January 2025)
- ML17275A578 + (13:51:27, 8 January 2025)
- ML17275A577 + (13:51:28, 8 January 2025)
- GO2-80-170, Forwards Amend 10 to Fsar.Affidavit of Distribution Will Be Furnished within 10 Days of Filing.Affidavit & Burns & Roe Errata Sheet Encl + (13:51:29, 8 January 2025)
- ML17275A573 + (13:51:31, 8 January 2025)
- ML17275A570 + (13:51:32, 8 January 2025)
- GO2-80-171, Forwards Updated Response to IE Bulletin 79-02,Revision 2, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. W/O Encl.Final Response Will Be Issued in First Quarter 1981 + (13:51:33, 8 January 2025)
- ML17275A568 + (13:51:33, 8 January 2025)
- GO2-80-190, Requests Meeting on 800918 W/Instrumentation & Controls Sys Branch & Reactor Sys Branch to Discuss Concerns Before Contract Expiration on 800930 + (13:51:36, 8 January 2025)
- ML17275A565 + (13:51:36, 8 January 2025)
- ML17275A563 + (13:51:42, 8 January 2025)
- ML17275A560 + (13:51:44, 8 January 2025)
- ML17275A562 + (13:51:44, 8 January 2025)
- GO2-80-172, Forwards SRV Loads - Improved Definition & Application Methodology for Mark II Containments, Prepared by Burns & Roe,Inc.Rept Withheld (Ref 10CFR2.790) + (13:51:45, 8 January 2025)
- ML17275A554 + (13:51:47, 8 January 2025)
- ML17275A553 + (13:51:48, 8 January 2025)
- ML17275A552 + (13:51:49, 8 January 2025)
- ML17275A551 + (13:51:50, 8 January 2025)
- IR 05000397/1980009 + (13:51:51, 8 January 2025)
- ML17275A548 + (13:51:52, 8 January 2025)