REGULAT
'NFORMATION DISTRIBUTIO YSTEM (RIDS)
ACCESSION NBR:8009300394 DOC ~ DATE: 80/09/23 NOTARIZED:
NO DOCKET FACIL:50-397 WPPSS Nuclear Projects Unit 2P Washington Public Powe 05000397 AUTH BYNAME AUTHOR AFFILiATION DEUBKRTPJ ~ R.
Fox Industries RECIP ~ NAME RECIPIENT AFFILIATION DENTONgH ~ RE Office of Nuclear Reactor Regulationg Director
SUBJECT:
Requests reply to'00221 8
0625 ltrs re status of technical review of topical'ept on Fox-Howlett rebar couplers.
DISTRIBUTION CODE:
TOIOS COPIES RECEIVED:LTR
+ENCL' SIZE:
TITLE: N-P Top Rept-Std Dist (cc:Berggren x28347)
NOTES:PM:
2 comics of all Hu.
rV e~Pcn RECIPIENT ID CODE/NAME matertaka COPIES LIITTR ENCL RECIPIENT ID CODE/NAME'OPIES LTTR ENCL'5000397 INTERNAL: A/D COMPESTRUCT A/D ENV TECH A/D LICENSING A/D OP. REACT A/D RAD PROT A/D TECHNOLOGY AEOD ASLB BERGGRENpJ
~
CONT SYS BR DIRp EMER PL't PRO DIRPHUM FAC SFY DIR P SFTY TECH DIRE TMI PROG EFF TR'YS BR EMERG PREP LIC'QUIP QUAL".'R GEOSCIENCES HYD/GEO BR IH C SYS BR LB2 BR LIC GUID BR MATL ENG BR NRC PDR OP EX EVALI BR OR ASSESS BR ORB 2
BR ORB 4
BR PLPASPP-433 PROC/TST REV BR BR RE FIL STDS COOR SAFTY PROG
- EVALI, SIT ANAL BR STD 8
SPEC PROJ SYS INTERAC BR XTRA CCBERGGREN 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1.
1 1
1 1
2 1
1 1
1 1
40 0
0 0
0 0
0 1
1 1
0 0
0 0
0 0
0 0
0 0
0 0
0 0
1 0
0 0
0 0
0 0
2 0
0 0
0 0
40 A/D CORE 8
CS A/D GEN PROJ A/D NATL L QUAL A/D PLANT SYS A/D SFTY ASSESS ACC KVAL BR ASLAP AUX SYS BR CHEM ENG BR CORE'ERF BR DIR E ENGINEERING DIRP LICENSING'IRg SYS INTEGR DIRECTOR NRR EMERG PREP DEV ENV ENG BR GEN ISSUES BR HUM FACT ENG BR I
L E
LB1 Bf'B3 BR LIC QUAL BR MECH ENG BR OELD OP LIC BR ORB 1
BR ORB 3
BR ORB 5
BR POWER SYS BR QA BR REAC SYS BR RESEARCH~
T 198P SEP BR STANDARDS STRUCT ENG BR UT FIN BR 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
6 1-1 1
1 1
1 1
1 1
1 1
1 1
1 1
3 1
1 EXTERNAL: ACRS 16 16 NSIC TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~
ENCL' 1
'0 Hl
(415) 843 3123 FOX INDUSTRIES 722 FOLGER AVENUE BERKELEY, CALIFORNIA 94710 September 23, 1980 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D. C 20555
Subject:
Topical Report on Pox-Howlett Rebar Couplers-Status Dear Mr. Denton; As of this date we have not received an answer to our letters of Peb.
21, and June 25, 1980 (copies enclosed),
inquiring into the status of the technical review of our topical report.
We continue to receive inquiries from contractors on the status of our topical report, most',recently from a reinforcing steel placing contractor on a nuclear power plant, for WPPSS in the Northwest.
This contractor is anxious to use the Pox-Howlett Coupler 'in place of the specified '.filler'etal connector because of his many problems encountered during inclement weather.
Also, the Pox-Howlett Coupler is at least foun (4) times faster to install in the field and requires considerably less testing.
The time-saving effect on,job, completion alone would be substantial, resul-ting in savings to the utility of many millions of dollars'owever, without NRC staff approval of our topical report the taper threaded connector can not be &ferenced in specific nuclear power plant applications'ithout such an approval utilities, architect-engineering firms and contractors are reluctant to initiate the use of Pox-Howlett Couplers fearing a slow NRC review process and resulting construction delays.
Would you kindly ask your technical staff to let us know when the review of our topical report was rescheduled, as indicated in your letter of March 8,1979, last paragraph, how the technical review is progressing and when we can expect taper threaded splices to be referenced in nuclear power plant applications.
Any effort on your part to help us gain this information much appreciated.
Thank you.
Very Truly Yours POX INDUSTRIES John R. Deubert
'anager 8ooosoo3'W'ill be very 7Q/Q AM:
6 DGnOow g
/
JRD/pd:
enclosure
U C
~
~
)
l
'