Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17277B482 + (12:13:02, 8 January 2025)
- GO2-84-465, Semiannual Effluent Rept,Jan-June 1984 + (12:13:04, 8 January 2025)
- ML17277B480 + (12:13:09, 8 January 2025)
- ML17277B477 + (12:13:10, 8 January 2025)
- GO2-84-472, Concurs W/Clarification Re Piping Failures Outside Primary Containment,Allowing Credit for Offsite Power to Mitigate Consequences of Pipe Failure Causing Scram or Turbine Trip. Offsite Power Assumed Lost When Undervoltage Occurs + (12:13:11, 8 January 2025)
- GO2-84-456, Application to Amend License NPF-21,revising Condition 2.C(11) Re Shield Wall Deferral.Change Would Allow Ongoing ALARA Reviews to Identify Need for Addl Shielding + (12:13:13, 8 January 2025)
- ML17277B472 + (12:13:18, 8 January 2025)
- ML17277B471 + (12:13:20, 8 January 2025)
- ML17277B470 + (12:13:21, 8 January 2025)
- ML17277B468 + (12:13:23, 8 January 2025)
- ML17277B466 + (12:13:23, 8 January 2025)
- GO2-84-445, Requests Confirmation of CRGR Review Re Specific Uncertainties Conservatively Treated in GE Instrument Setpoint Methodology for Bwrs.Concern Should Be Treated as Generic + (12:13:24, 8 January 2025)
- GO2-84-444, Forwards Fee for Review of Util 840717 Application Re Enhancement of Control Room Floor + (12:13:28, 8 January 2025)
- GO2-84-427, Discusses Replacement of Vinyl Asbestos Tiled Floor W/Carpeting to Enhance Control Room Condition & Improve Human Performance.Proposed Carpeting Meets or Exceeds Critical Radiant Flux Rating,Per ASTM E-648 Test + (12:13:35, 8 January 2025)
- GO2-84-429, Notifies That Preoperational Test 22.0-B of Nitrogen Inerting Sys Completed.Results Reviewed & Accepted by Plant Operations Committee + (12:13:37, 8 January 2025)
- ML17277B452 + (12:13:41, 8 January 2025)
- ML17277B450 + (12:13:43, 8 January 2025)
- ML17277B448 + (12:13:44, 8 January 2025)
- GO2-84-409, Forwards Amend 34 to Fsar.Amend Updates Technical & Equipment Qualifications,Incorporates Preoperational Test Results,Failure Analyses & Safe Shutdown Analyses Previously Reported & Incorporates Tech Specs Values for Startup Test + (12:13:45, 8 January 2025)
- GO2-84-414, Informs That Items Listed in Attachment 1 of License Condition 2.C(1) of License NPF-21,Amend 1 Completed + (12:13:47, 8 January 2025)
- GO2-84-413, Forwards Info Re Effluent Radiation Monitors Per Licensing Condition 2.C.(27).Licensing Condition 2.C.(27) Satisfied + (12:13:54, 8 January 2025)
- GO2-84-369, Advises That Operable Redundant Seismic Category I Environmentally Qualified Water Chillers for Control Room HVAC Installed,Satisfying License Condition + (12:14:05, 8 January 2025)
- GO2-84-376, Requests Temporary Exemption from 30-minute Rated Supply Requirement of 10CFR50,App R.App R Requires Rated Operating Air Supply of at Least 30 Minutes for self-contained Breathing Apparatus for Use by Fire Brigade + (12:14:47, 8 January 2025)
- GO2-84-363, Retracts 840309 Request for Amend to License NPF-21,changing Tech Specs to Delete Requirement to Verify Isolation & Annunciation on High Voltage Abnormally Low During Quarterly Channel Function Surveillance Test + (12:14:56, 8 January 2025)
- GO2-84-364, Responds to Generic Ltr 84-11 Re Cracks in BWR Stainless Steel Piping.Response Addresses Scope & Schedule of Planned Insp,Qualifications of Examiners,Description of Surveillance Methods & Measures Taken When Cracks Discovered + (12:15:18, 8 January 2025)
- ML17277B421 + (12:15:48, 8 January 2025)
- GO2-84-338, Reactor Containment Bldg Integrated Leak Rate Test. W/ + (12:15:51, 8 January 2025)
- GO2-84-300, Forwards Addl Data Re Results of Operability Testing Performed on Purge & Vent Valves.Package Should Replace Data in Attachment H of 831219 Submittal + (12:16:34, 8 January 2025)
- ML17277B416 + (12:17:03, 8 January 2025)
- ML17277B410 + (12:17:05, 8 January 2025)
- ML17277B404 + (12:17:07, 8 January 2025)
- GO2-84-298, Application for Amend to License NPF-21,changing Tech Specs to Allow Suspension of Containment Inerting During Power Ascension Test Program Until Rated Thermal Power Trip Tests Completed.Fee Encl + (12:17:08, 8 January 2025)
- ML17277B396 + (12:17:42, 8 January 2025)
- GO2-84-285, Requests Changes to Tech Specs,Clarifying Design Alarm, Identifying Changes to Battery Terminal Voltages for 125- & 250-volt Batteries & Correcting Identification for Proper breaker.Marked-up Tech Specs Encl + (12:17:44, 8 January 2025)
- ML17277B394 + (12:18:10, 8 January 2025)
- GO2-84-284, Requests 15-day Extension,Until 840515,to Submit Response to Generic Ltr 84-11 Re Insps of BWR Stainless Steel Piping.Due to Unknown Reasons,Nrc Was Not Received by Util Until 840502 + (12:18:11, 8 January 2025)
- GO2-84-272, Advises That Reactor Coolant Disolved Gas Grab Sampling Capability Installed,Tested & Operational,Per Condition of Amend 1 to License NPF-21.Procedures Prepared & Appropriate Personnel Trained + (12:18:18, 8 January 2025)
- ML17277B390 + (12:18:23, 8 January 2025)
- GO2-84-269, Updated Application for Amend to License NPF-21,clarifying 840309 Application Re Change to Section 6 of Tech Specs Re Util Organization & Util Organization Responsibilities, Per NRC Request + (12:18:24, 8 January 2025)
- ML17277B384 + (12:18:44, 8 January 2025)
- ML17277B382 + (12:18:45, 8 January 2025)
- GO2-84-236, Informs That Seven Human Engineering Deficiencies Corrected. Deficiency F6.115 Recognized 116 Inconsistent Fonts & Switch Eschuteon Legends Needing replacement.Thirty-eight Legends Installed.Remainder Replaced W/Temporary Lending + (12:18:46, 8 January 2025)
- GO2-84-212, Confirms Info Provided in 840410 Telcon W/R Auluck,F Churney & R Li Re Listed Facility Sys Having High Pressure/Low Pressure Interface Features.Info Provided to Expedite Review of 840120 Request to Amend Tech Spec 3.4.2 + (12:18:50, 8 January 2025)
- GO2-84-220, Confirms Info Provided in Gc Sorensen to a Schwencer Re Tech Spec 3.4.3.2 Change Request.Unit May Not Immediately Proceed to Mode 2 (Startup) W/O Avoiding Reinitiation of 7-day Surveillances,Unless Approved by NRC + (12:18:55, 8 January 2025)
- GO2-84-218, Suppl to 840120 Application for Amend to License NPF-21, Submitting Info Re High Pressure/Low Pressure Interfaces W/ Listed Features,Per 840410 Telcon + (12:19:10, 8 January 2025)
- GO2-84-221, Annual Financial Rept 1983 + (12:19:51, 8 January 2025)
- GO2-84-210, Forwards Rev to Equipment Justification 6,per Util 830630 & 0916 Ltrs.Analyzer Unqualified for post-accident Pressure, Temp & Humidity Conditions.Rationale for Interim Operation, Per ,Remains Applicable + (12:19:58, 8 January 2025)
- ML17277B369 + (12:19:58, 8 January 2025)
- DD-84-07, Directors Decision DD-84-07 Denying 831014 2.206 Petition on Behalf of Coalition for Safe Power,Requesting NRC Revoke CP & Deny OL + (12:20:04, 8 January 2025)
- ML17277B364 + (12:20:06, 8 January 2025)
- GO2-84-177, Confirms 840328 Telcon Re post-accident Sampling Sys. Modified Sys Installed,Tested,Functional & in Compliance W/Tmi Action Item II.B.3 & License Condition 13 + (12:20:07, 8 January 2025)