Proposed Tech Specs,Allowing Suspension of Containment Inerting During Power Ascension Test Program Until Rated Thermal Power Trip Tests Completed
ML17277B404
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/11/1984
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17277B402 List:
References
NUDOCS 8405160258
Download: ML17277B404 (2)


Text

I~

ilr 4

SPECIAL TEST EXCEPTIONS 3/4, 10. 5 OXYGBI CONCENTRATION LIMITING CONOITION FOR OPERATION 3.10.5 The provisions of Specification 3.6.6,4 nay be suspended during the perfonnance of the Startup -Test Progr~<i) until either the required 100K of RATEO THERMAL POMER trip tests have been cot,".pfeted or the reactor has opera"ed for 12G Effective Full Power Oays.

APPLICABILITY:

OPERATIONAL CONOITIQN l.

ACTlON Mith the requirerents of the above specification not satisfied, be in at leas STARTUP w>thorn 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVE LANCE RFQUIREt<EHT 4.10.5 The Effective Full Power Oays "f'peration shall be verified to be less than

120, by " lculation, at least once per 7 days during the Startup Test Programma.

PROPOSED CHANGE Attachment 8405 i60258 '405 i'i u