ML17277B390

From kanterella
Jump to navigation Jump to search
Concurs W/Util Position of Indefinitely Suspending Preoperational Test PT 33-0-B for Chemical Waste Processing. Prior to Placing Permanent Sys Into Operation,Test Must Be Completed
ML17277B390
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/13/1984
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 8405020375
Download: ML17277B390 (4)


Text

Docket No.:

50-397

~0 APR 18 1984

~1 Nr. G. C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way Richland, Washington 99352

Dear ter. Sorensen:

Subject:

Chemical Waste Processing Preoperational

'Test

Reference:

1. Letter, G02-84-024, G.

C. Sorensen,(WPPSS) to A. Schwencer (NRC), "Chemical waste processing preoperational test," dated January 17, 1984.

2. Letter, G02-84-035, G.

C. Sorensen (WPPSS) to A. Schwencer (NRC), "Schedule for completion of preoperational and acceptance tests before exceeding five percent power,"

dated January 24, 1984.

The reference letters stated that the Supply System has contracted with Chemical Nuclear System, Inc. to process wet, solid radioactive waste and that the preoperational test for waste concentrators, PT 33.0-B, will be suspended indefinitely.

The portable system to be used at WNP-2 is described in FSAR Amendment No. 33 and as stated in the SSER84, has been approved by the NRC staff through review and acceptance of chemical Nuclear Topical Report CNSI-2 4313-01354-01).

The staff agrees with the Supply System's position of indefinitely suspending the preoperational test PT 33-0-B.

Prior to placing the permanent system into operation, PT 33-0-B must be completed.

Sincerely, vl'spinal gtgned by cc:

See next page A. Schwencer, Chief Licensing Branch No.

2 Division of Licensing DISTRIBUTIO+ Docket File=~

NRC PDR LPDR EHylton RAul uck ACR (16)

NS IC NGrace PRC System EJordan LB82 Reading OELD, Attorney 4

D

~

DL:L 2

pob ASchwencer g/84 4//+84 8405020375 840413 PDR ADOCK,05000397

'P PDR

k 'll t

r+~

j ~

P

~

~0

~.

Mr. G. C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P. 0. Box 968 3000 George Washington Way Richland, Washington'-

99352 CC:

Nicholas Reynolds, Esquire

Bishop, Cook, Liberman, Purcell

& Reynolds 1200 Seventeenth

Street, N.

W.

Washington, D. C.

20036 Mr. G. E. Doupe, Esquire Washingtcn Pub]ic Power Supply System P. 0.

Box 968 3000 George Washington Way

Richland, Washington 99352 Nicholas Lewis, Chairman Energy Facility Site Evaluation Council Mail Stop PY-ll Olympia, Washington 98504 P. L. Powell, Licensing Manager Washington Public Power Supply System P. 0.

Box 968

Richland, Washington 99352 Mr. W. G. Conn, Sr. N/M Group Supervisor Burns and Roe, Incorporated

$ 1 Williams Boulevard

Richland, Washington 99352 R. B. Glasscock, Director Licensing and Assurance Washington Public Power Supply System P. 0.

Box 968, MD 650

Richland, Washington 99352 Mr. J.

D. Martin WNP-2 Plant Manager Washington Public Power Supply System P. 0.

Box 968

Richland, Washington 99352

~I