Forwards Emergency Operating Procedures Generation Package Requested at Mgt Meeting Re 840716 Insp.Guidelines Will Be Used for Addl Verification of Response to TMI Item I.C.1 Re Development of Procedures for Transients & Accidents
ML17277B466
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/26/1984
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
TASK-1.C.1, TASK-TM NUDOCS 8408090262
Download: ML17277B466 (1)


Text

i Aggro Mo Washington Public Power Supply System PO.Box966 3000GaorgaWaahingtonWay Richland,Waahigl~n93352 (509)372-5000 U PlI2:3g Docket No. 50-397 July 26, 1984 RE810g PI~F Mr. T.W. Bishop, Director Division of Reactor Safety and Projects U.S.

Nuclear Regulatory Commission Region V

1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Attention:

Mr. A. L. Hon, Reactor Inspector 8408090262 840726" PDR ADOCK 05000897 P

PDR,.

(E, FILE COPY

Subject:

Reference:

NUCLEAR PLANT NO.

2 LICENSE NO.

NPF-21 NRC INSPECTION WEEK JULY 16, 1984 Letter G02-83-908 dated 10/ll/83 from G.C.

Sorensen (SS) to A. Schwencer (NRC); Procedure Generation Package for WNP-2 At the Management Meeting for the subject inspection, Mr. A~L. Hon requested a copy of the BWR Owners'roup guidelines that were used t6 generate Emer-gency Operating Procedures.

The guidelines will be used for additional verification of WNP-2's response to TMI Item I.C.l, Development of Procedures for Transients and Accidents.

Please find attached a copy of the referenced letter which includes the guidelines used for these procedures.

Should you have any questions concerning our response, please do not hesitate to call me.

g8 G.

C. Sorensen

Manager, Regulatory Programs RCM:jdb Attachments:

As stated