ML17277B396
| ML17277B396 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 04/13/1984 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17277B397 | List: |
| References | |
| TASK-2.B.3, TASK-TM NUDOCS 8405150124 | |
| Download: ML17277B396 (9) | |
Text
~
.'l~ ~<COg c~
lu O
DQ e
+>>*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 WASHINGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO. 50-397 WPPSS NUCLEAR PROJECT NO.
2 AMENDMENT TO FACILITY OPERATING LICENSE License No. NPF-21 Amendment No.
1 1.
The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
A.
The application for license by the Washington Public Power Supply System (WPPSS, also the licensee),
complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I;
B.
The facility will operate in conformity with the application as
- amended, the provisions of the Act, and the regu'lations of'he Commission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and {ii) that such activities will be conducted in compliance with the Commission's regulation set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, for the Facility Operating License No. NPF-21, paragraphs 2.C.(l) and 2.C.(13) are hereby amended to read as follows:
(1)
Maximum Power Level The licensee is authorized to operate the facility 'at reactor core power levels not in excess of full power {3323 megawatts thermal).
Items in Attachment 1 shall be completed as specified.
Attachment 1
is hereby incorporated into this license.
8405150i24 8404i3~
PDR ADOCN 05000397 P'DR
I
+p
(13) Post-Accident Sam lin TMI Item II.B.3, Section 9.3.2-4,
- SER, SSER SSER 5
Prior to May 1, 1984, the licensee shall install, test and have operational the reactor coolant dissolved gas grab sampling capability.
3.
This license amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Date of Issuance:
APQ g g Qg Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation 11 DL' M
c :kw a4V<<
DL:LB
/LA EG n
3g 4
DL:LB82/BC ASchwencer 3/g'f/84.
ELD 0
/8 L
DL:
TM ovak t
Pjj)/84
/y/84
A l
I I
ll tt
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 WASHItIGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO. 50-397 HPPSS NUCLEAR PROJECT NO.
2 AMENDMENT TO FACILITY OPERATING LICENSE L1cense 'No.
NPF-21 Amendment No.
1 1.
The Nuclear Regulatory Commission (the Commission or the NRC) has found that A.
The application f'r license by the Washington Public Power Supply System (ltPPSS, also the licensee),
complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), a'nd the Commission's regulations set forth in 10 CFR Chapter I;
B.
The facility will operate in conformity with the application as
- amended, the provisions of the Act, and the regulations of the Comlss10n'.
There is reasonable assurance:
(i) that the'ctivities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulation set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, for the Facility Operating License No. NPF-21, paragraphs 2.C. (1) and 2.C. (13) are hereby amended to read as follows:
(1)
Haximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of full power (3323 megawatts thermal).
Items in Attachment 1 shall be completed as specified.
Attachment 1
is hereby incorporated into this license.
(13) Post-Accident Sam ling (TMI Item II.B.3, Section 9.3.2-4,
- SER, SSER 4,
SSER
.5 Prior to t".ay 1, 1984, the, licensee shall install, test and have operational the reactor coolant dissolved gas grab sampling capability.
3.
This license amendment is 'effective as of the date of issuance.'OR THE NUCLEAR REGULATORY COMMISSION Date of Issuance:
APR i 3 Qg 0 '"'i+~~ j F)~o~V'ivision of Licensing Office of Nuclear Reactor Regulation
EP,R RE'GU
~o Docket No. 50-397 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 Apri1 27, 1984 DISTRIBUTION Docoument Control 50-397 LB¹2 Reading EGHYlton
- FIngram, PA Docketing and Service Section Office of the Secretary of the Commission
SUBJECT:
NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE FOR tlPPSS NUCLEAR PROJECT NO. 2 One Ex'igned origina/ of the Federal Register Notice identified below are enclosed foryour transmittal to the Office ofthe Federal Register for publication. Additional conformed copies ( 6
) of the Notice are enclosed for your use.
0 Notice of Receipt of Application for Construction Permit(s) and Operating License(s) 0 Notice of Receipt of Partial Application forConstruction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.
0 Notice of Availabilityof Applicant's Environmental Report.
0 Notice of Proposed Issuance of Amendment to Facility Operating License.
0 Notice of Receipt of Application'or Facility License(s);
Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.
0 Notice of Availabilityof NRC Draft/Final Environmental Statement.
0 Notice of Limited Work Authorization.
0 Notice of Availabilityof Safety Evaluation Report.
0 Notice of Issuance of Construction Permit(s).
Q Notice of Issuance of Facility Operating License(s) or Amendment(s).
0 Other:
Enclosure:
As Stated Office of Nuclear Reactor Regulation OFFCE~
SURNAME~
DATE~
'r
)'y DL:LB ton 4/27/84
I CI a
t I
~ s
~,,
I t