Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17285A313 + (10:59:04, 8 January 2025)
- TAC:71390 + (10:59:05, 8 January 2025)
- ML17285A309 + (10:59:06, 8 January 2025)
- 05000397/LER-1989-002, :on 890130,reactor Scram Occurred Due to Turbine Control Valve Fast Closure Actuation of Reactor Protective Sys Logic.Caused by Equipment Design Deficiency. Damaged 500 Kv Insulator Stack Replaced + (10:59:09, 8 January 2025)
- GO2-89-033, Responds to 890217 Telcon Re Requesting Exemption from 10CFR20,App a, Use of GMR-1 Canisters for Protection Against Radiodine. Util Agrees to Change Attachment I,Item A.5 of Ref Ltr as Listed + (10:59:10, 8 January 2025)
- TAC:68268 + (10:59:10, 8 January 2025)
- ML17285A305 + (10:59:11, 8 January 2025)
- ML17285A304 + (10:59:12, 8 January 2025)
- ML17285A301 + (10:59:13, 8 January 2025)
- ML17285A302 + (10:59:13, 8 January 2025)
- ML17285A300 + (10:59:14, 8 January 2025)
- GO2-89-029, Application for Amend to License NPF-21,revising Tech Specs to Allow Use of Advanced Nuclear Fuels Corp Reload Fuel in Cycle 5 + (10:59:15, 8 January 2025)
- ML17285A299 + (10:59:15, 8 January 2025)
- GO2-89-030, Responds to IE Bulletin 88-007,Suppl 1, Power Oscillations in Bwrs. GE Interim Stability Recommendations Fully Implemented by Procedural Rev on 881115 + (10:59:16, 8 January 2025)
- ML17285A293 + (10:59:18, 8 January 2025)
- GO2-89-025, Forwards Status Rept Re Generic Ltr 88-14, Instrument Air Supply Sys Affecting Safety-Related Equipment. Significant Changes Re Info Requested by Generic Ltr Will Be Reflected in Licensee Final Submittal.W/Two Oversize Drawings + (10:59:19, 8 January 2025)
- IR 05000397/1989003 + (10:59:22, 8 January 2025)
- ML17285A281 + (10:59:23, 8 January 2025)
- ML17285A278 + (10:59:24, 8 January 2025)
- ML17285A276 + (10:59:25, 8 January 2025)
- IR 05000397/1988045 + (10:59:27, 8 January 2025)
- ML17285A271 + (10:59:28, 8 January 2025)
- ML17285A267 + (10:59:29, 8 January 2025)
- ML17285A266 + (10:59:30, 8 January 2025)
- ML17285A264 + (10:59:30, 8 January 2025)
- ML17285A262 + (10:59:31, 8 January 2025)
- GO2-89-021, Forwards Semiannual Effluent Rept,Jul-Dec 1988, Corrected Table 3-5 to Jul-Dec 1987 Rept & Amend 6 to Offsite Dose Calculation Manual + (10:59:33, 8 January 2025)
- ML17285A261 + (10:59:33, 8 January 2025)
- ML17285A260 + (10:59:33, 8 January 2025)
- ML17285A256 + (10:59:35, 8 January 2025)
- IR 05000397/1989005 + (10:59:40, 8 January 2025)
- IR 05000397/1988041 + (10:59:41, 8 January 2025)
- GO2-89-020, Responds to NRC Re Violations Noted in Insp Rept 50-397/88-40.Corrective Actions:Plant Procedure 7.0.0 Revised to Require Carbon Sampling Between 720 & 900 H of Operation & Filter Sampling Performed When 720 H Reached + (10:59:42, 8 January 2025)
- GO2-88-241, Forwards Amend 6 to Offsite Dose Calculation Manual + (10:59:44, 8 January 2025)
- ML17285A251 + (10:59:44, 8 January 2025)
- PNO-V-89-015, on 890210,suppression Pool Suction Valve to HPCS Pump Failed in Midposition.Caused by Valve Operator. Personnel Disassembled Valve Operator & Manually Placed Valve in Closed Position & Normal Operation Resumed + (10:59:47, 8 January 2025)
- ML17285A245 + (10:59:47, 8 January 2025)
- ML17285A243 + (10:59:48, 8 January 2025)
- ML17285A242 + (10:59:49, 8 January 2025)
- GO2-89-016, Application for Amend to License NPF-21,incorporating Clarifications to Tech Spec Sections 3.0 & 4.0, Limiting Conditions for Operation & Surveillance Requirements, Per Generic Ltr 87-09 + (10:59:50, 8 January 2025)
- GO2-89-015, Advises That Util Evaluating NRC 881206 Safety Evaluation of Recirculation Pump Trip Sys Design,Per ATWS Rule 10CFR50.62. Discussions Will Be Initiated within Next 30 Days After All Design Considerations Evaluated + (10:59:52, 8 January 2025)
- ML17285A235 + (10:59:53, 8 January 2025)
- ML17285A234 + (10:59:54, 8 January 2025)
- IR 05000397/1989002 + (10:59:55, 8 January 2025)
- GO2-89-014, Responds to NRC Re Violation Noted in Insp Rept 50-397/88-41.Corrective Actions:Applicable Operations & Chemistry Procedures Re Timing for Sampling & Analysis of Drywell for All Venting & Purging Operations Changed + (10:59:56, 8 January 2025)
- GO2-89-010, Submits Revised Response to Util Responding to NRC Re Violations Noted in Insp Rept 50-397/88-24.New Date of Full Compliance Is 890217 for Implementing New Procedure on Control of Test Equipment + (11:00:00, 8 January 2025)
- GO2-89-011, Advises That Complete Response to Generic Ltr 88-14 Cannot Be Provided by 890223.Info That Will Be Submitted Listed. Addl Info on Design Verification Review Will Also Be Provided by 890414 + (11:00:02, 8 January 2025)
- PNO-V-89-009, on 890130,main Turbine Generator Trip Occurred, Resulting in Reactor Trip.Preliminary Indication That Main bus-bar Insulator for Phase a 500 Kv step-up Transformer Shorted to Ground.Outage Expected to Last Min of 5 Days + (11:00:04, 8 January 2025)
- GO2-89-013, Requests Temporary Waiver of Compliance from Tech Spec Surveillance Requirement 4.8.1.1.2.e.7.b.Request Consistent W/Design of Diesel Generator Trip Bypasses as Described in FSAR + (11:00:05, 8 January 2025)
- ML17285A222 + (11:00:06, 8 January 2025)
- ML17285A220 + (11:00:07, 8 January 2025)
- ML17285A218 + (11:00:07, 8 January 2025)
- 05000397/LER-1988-038, :on 881219,determined That Reactor Bldg to Suppression Chamber Vacuum Breaker Valve Inoperable.Caused by Procedural Inadequacies.Technicians Allowed to Complete Channel Functional Test + (11:00:09, 8 January 2025)