ML17285A245
| ML17285A245 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 01/04/1989 |
| From: | Bjorgen J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | |
| Shared Package | |
| ML17285A244 | List: |
| References | |
| 50-397-OL-88-03, 50-397-OL-88-3, NUDOCS 8902160136 | |
| Download: ML17285A245 (2) | |
Text
!Y U.S.
NUCLEAR REGULATORY COMMISSION REGION III Report No. 50-397/OL 88-03 Docket No. 50-397 Licensee:
Washington Public Power Supply System Facility Name:
WNP-2 Examination Administered At:
- Richland, Washington Examination Conducted:
December 7,
1988 License No. NPF-21 Chief Examiner:
J.
C. Bjorgen ate Approved By:
M. J. Jordan, Chief Date Examination Summar Examination administered on December 7,
1988 Re ort No. 50-397/OL 88-03 A simulator examination was administered to one senior reactor operator candidate.
Results:
The candidate passed the examination.
REPORT DETAILS 1.
Examiners J.
C. Bjorgen, Region III 2.
~iN An exit meeting was held on December 7, 1988.
The following personnel were present at this meeting:
Washin ton Public Power Su 1
S stem B. Barmettlor, Facility Training Manager M. Schmitz, Training Instructor G. Richmond, Training Instructor USNRC J.
C. Bjorgen, Chief Examiner, RIII G.
C. Wright, Chief, Operations Branch, RIII The following topics were discussed in the exit meeting:
a.
The examiner identified no generic weaknesses at the exit meeting.
b.
A general discussion was held concerning the examination process and the estimated date that the exam results would be completed.