ML17285A264
| ML17285A264 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 02/16/1989 |
| From: | Samworth R Office of Nuclear Reactor Regulation |
| To: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17285A265 | List: |
| References | |
| GL-83-28, TAC-60758, NUDOCS 8902270461 | |
| Download: ML17285A264 (4) | |
Text
~
~
February 16, 1989 Docket No. 50-397 Mr. G.
C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way Richland, Washington 99352
Dear Mr. Sorensen:
SUBJECT:
SAFETY EVALUATION REPORT FOR GENERIC LETTER 83-28 ITEM 2.1 (PART 2)
(VENDOR INTERFACE PROGRAMS - RTS COMPONENTS)
FOR WNP-2 (TAC NO. 60758)
The Washington Public Power Safety System was required by Generic Letter 83-28, Item 2.1 (Part 2) to confirm that you have established an interface with either the NSSS vendor or with the vendors of each of the components of your Reactor Trip System.
The response was to confirm that this interface program includes periodic communication between WNP 2 and the vendor and a
system of positive feedback which confirms receipt of transmittals of technical information.
We have reviewed your responses of November 18, 1983 and May 17,
- 1985, as documented in the enclosed SER.
We find your responses to Generic Letter 83-28, Item 2.1 (Part 2) to be acceptable.
We, therefore, consider Part 2 of Item 2.1 to be closed by this action.
This review does not address Generic Letter B3-2B, item 2.2.2, "Vendor Inter-face Program For All Other Safety-Related Components."
I will advise you of any further development on our review of item 2.2.2.
Sincerely, original si gned by Robert B. Samworth, Senior Project Manager Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects
Enclosure:
As stated CONTACT:
R. Samworth, x21364 DISTRIBUTION f"~t NRC
& Local PDRs PD 85 Reading tlVirgilio JLee RSamworth OG f/info only)
DRSP/PD5 RSamworth:rw 2////89 EJordan BGrimes ACRS (10)
GNewberry SRhow GHolahan AThadani D
- PD5 ton 2/)]/89
~9Q~27 cK Q+QQQ397 89Q2i+
pDR'DO poc p
N I
'I If I
r H
I H
II II I
'i I if II,I H
j
~S RECIj (4
~ 0*0 C
O I
cO0 Cy V/~
/p +a*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 February 16, 1989 Docket No. 50-397 Mr. G.
C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way Richland, Washington 99352
Dear Mr. Sorensen:
SUBJECT:
SAFETY EVALUATION REPORT FOR GENERIC LETTER 83-28 ITEM 2.1 (PART 2)
(VENDOR INTERFACE PROGRAMS - RTS COMPONENTS)
FOR WNP-2 (TAC NO. 60758)
The Washington Public Power Safety System was required by Generic Letter 83-28, Item 2.1 (Part 2) to confirm that you have established an interface with either the NSSS vendor or with the vendors of each of the components of your Reactor Trip System.
The response was to confirm that this interface program includes periodic communication between WNP 2 and the vendor and a
system of positive feedback which confirms receipt of transmittals of technical
'-- information.
We have reviewed your responses of November 18, 1983 and May 17,
- 1985, as documented in the enclosed SER.
We find your responses to Generic Letter 83-28, Item 2.1 (Part 2) to be acceptable.
We, therefore, consider Part 2 of Item 2.1 to be closed by this action.
This review does not address Generic Letter 83-28, item 2.2.2, "Vendor Inter-face Program For All Other Safety-Related Components."
I will advise you of any further development on our review of item 2.2.2.
Sincerely,
Enclosure:
As stated CONTACT:
R. Samworth, x21364 Robert B. Samworth, Senior Project Manager Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects
~
~
'0
~
Mr. G.
C. Sorensen, Manager Washington Public Power Supply System WPPSS Nuclear Project No.
2 (WNP-2)
CC:
Nicholas S. Reynolds, Esq.
- Bishop, Cook, Pur cell 5 Reynolds 1400 L Street NW Washington, D.C.
20005-3502 Mr. G. E. Doupe, Esquire Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way Richland, WaslIington 99532 h1r. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Hail Stop PY-11 Olympia, Washington 98504 Mr. Alan G. Hosier, Licensing Manager Washington Public Power Supply System P. 0.
Box 968, MD 956B Richland, Washington 99352 Mr. A. Lee Oxsen Assistant Managing Director for Operations Washington Public Power Supply System P. 0.
Box 968, MD 1023
- Richland, WA 99352 Mr. Gary D. Bouchey, Director Licensing and Assurance Washington Public Power Supply System P. 0.
Box 968, MD 280 Richland, Washington 99352 Mr. C. H. Powers WNP-2 Plant Manager Washington Public Power Supply System P. 0.
Box HD 927M Richland, Washington 99352 Regional Administrator, Region V
U.S. Nuclear Regulatory Coomission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Chairman Benton County Board of Commissioner s
- Prosser, Washington 99350 Mr. Christian Bosted U. S. Nuclear Regulatory Commission P. 0.
Box 69 Richland, Washington 99352