Text
ACCE1ZRATED
DISTKBUTION
DEMONSTRXTIO'.i
SYSTEM
violations noted.
DISTRIBUTION CODE:
IEOID
COFIES RECEIVED:LTR I
ENCL /
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
REGULATORY INFORbRTION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8902280398
DOC.DATE: 89/02/14
NOTARIZED: NO
DOCKET ¹
FACIL:50-397, WPPSS Nuclear Project, Unit 2, Washington Public
Powe
05000397
~
~
~
~
~
~
AUTH.NAMC
AUTHOR AFFILIATION
ZIMMERMAN,R.P.
Region 5, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
SORENSEN,G.C.
Washington Public Power Supply System
SUBJECT: Forwards
Insp Rept 50-397/88-45
on 881212-890108.No
0
I
I
INTERNAL:
l ~
XTERNAL:
RECIPIENT
ID CODE/NAME
AEOD/DEIIB
NRR SHANKMAN,S
NRR/DLPQ/PEB
11
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ZLRB12
- BE
N,J
G FILE
02
LPDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
2
2
1
1
1
.
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
SAMWORTH,R
DEDRO
NRR/DEST DIR
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC/HDS2
RGN5
FILE
01
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
R
D
NCTE 'I0 ALL 'RIDS
RECZPIENIS.
PIZASE HELP US 'IO REDUCE RASTB.'GFI'ACZ 'IHE DOCUKWZ COPTBOL DESK,
RXN Pl-37
(EXT. 20079)
KO EIZMIMXEYOUR MME PBON DISTRIHITICN
LISTS FOR DOCUMENTS Y0U DOHiT HEEDI
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
25
ENCL
25
Docket No.
50-397
Washington Public Power Supply System
P.
0.
Box 968
Richland,
99352
Attention:
Mr.
G.
C. Sorensen
Manager of Regulatory
Programs
Gentlemen:
Subject:
NRC Inspection
This refers to the inspection
conducted
by Messrs.
C. J.
Bosted
and
R.
C.
Sorensen
of this office on December
12 - January
8,
1989 of activities
authorized
by
NRC Operating
License
No.
and to the discussions
of
findings held by the inspectors
with Mr.
C.
Powers
and other members of the
Supply System staff at the conclusion of the inspection.
Areas
examined during'this inspection are described
in the enclosed
inspection
report.
Within these
areas,
the. inspection consisted of selective
examina-
tions of procedures
and representative
records,
interviews with personnel
and
observations
by the inspectors.
No violations of NRC requirements
were identified within .the scope of this
inspection.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be pleased
to
discuss
them with you.
Qg+( ~~ ~
Reactor Projects
Branch
Enclosure:
Inspection
Report
No. 50-397/88-45
cc w/enclosure:
A.
L. Oxsen,
WPPSS Assistant
Managing Director for Operations
C.
M. Powers,
WNP-2 Plant Manager
G.
D. Bouchey,
WPPSS Director, Assurance
& Licensing
A.
G. Hosier,
WNP-2 Licensing Manager
G.
E.
Doupe,
Esq.
N.
S.
Reynolds,
Debevois,
Cook, Purcell
& Reynolds
State of Washington
8902280398
8902i4
ADOCK 05000397
8
E
-2-
FEB .',;a8g
bcc w/copy of enclosures
1
Oocket File
Project Inspector
Resident
Inspector
G.
Cook
B. Faulkenberry
J. Martin
A. Johnson
T. Foley,
R. Kiessel,
R. Samworth,
bcc w/enclosure
1 only:
M. Smith
LFMB
RE 0iV
I2
/+S,e
en
p Gtfo24 d
1
2/~~/p9
jtC2/(i'189
and 2:
I
P'Joh
son
2/[~2S9
, REQ
r YES /
NO-
A.PB.
RZimmerman
2/jg/89
Q
YES /
0
/ YES