Monthly Operating Rept for Jan 1989 for Washington Nuclear Plant-2
ML17285A256
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/31/1989
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8902230474
Download: ML17285A256 (8)


Text

~ gpgp~~7ED DI~BUTJON DEMONSTR/CION SY) TEM REGULATORY INFORMATION DIgTRQBUTION SYSTEM (RIDS) gg/o ~zD ACCESSION NBR: 8902230474 DOC. DATE: -89~1~

NOTARIZED: NO DOCKET g FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.

Washington Public Power Supply System POWERS,C.M.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Jan 1989 for WNP-2.W 890210 ltr.

DISTRIBUTION CODE IE24D COPIES RECEIVED LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPXENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRR/PREP/R 10 EG FILE EXTERNAL: EGGG SXMPSON i F LPDR NSIC COPIES LTTR ENCL 1

0 1

0 10

,10 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA ARM TECH ADV NRR/DOEA/EAB ll NUDOCS-ABSTRACT RGN5 EG&G WILLIAMS,S NRC PDR COPXES LTTR ENCL 5

5 1

1 2

2 1

1 1

1 1

1 1

1 1

1 R

I S

h NOIE 'IO ALL "RIDS" RECIPIENIS:

PIZASE HELP US 'IO REDUCE HASTE.'GNI'ACT KEE DOQJMENI'OÃIBDL DESK,

. ROOM Pl-37 (EXT. 20079)

KO ELIMZPZE YOUR %RE FBQM DISTIGBUTXGN LISTS FOR DOCKMEÃZS YOU DON'T NEZDf TOTAL NUMBER OF COPIES REQUIRED:

LTTR 32 ENCL 30

BEKAT PERIOD JAN 19 89

mcnth, year T15.

o~K 'vipE l&aiT8 HUisGH

~sF.

lu>

LNIT SIIUTDOl'NS / REDUCTIONS IZfID= ~Y it.iWIPII' DOCKET NO.

50'-397 UNIT NN(E "IE COhIPLETEO BY LB HUTCHISON TELER IONE (509) 377-2486 89-01 1-7-89 S

82.9

A 1

N/A HC HTEXCHD PLANT WAS SHUT DOWN TO CORRECT A CONDENSER TUBE IN-LEAKAGE PROBLEM.

REPAIRS WERE PER-FORMED AND UNIT RETURNED TO SERVICE.

89-02 1-30-89 F

42.8 A

EB ELECON GENERATOR TRIPPED AT 100K POWER DUE TO A FAULT ON AN INSULATOR BETWEEN THE MAIN STEP-UP TRANS-FORMERS AND GENERATOR DISCONNECTS.

THE INSULATOR WAS REPLACED AND INSPECTION/CLEANING WAS PER-FORMED ON REMAINING INSULATORS PRIOR TO STARTUP.

l SWNRY I 'llNP-2 INCURRED 1

SCHEDULED AND 1 FORCED OUTAGE IN JANUARY AS DESCRIBED ABOVE.

F-Forced S-SCI1KI F-Admin G-Oper Error H-Other A-Equip Failure 0-Maint or Test

~

C-Ref ue ling 0-Regulatory Res triction E-Operator TraIning h License Examination IIETHOD 1-manual 2-Manual ScratA 3-pluto Scram 4-Continued

%Menticed Load 9-Other 8902230474 S90i3 PDR ADGCK 05000397 PDC SYSTEH h COMPOM.:NT Exhibit F & H Instructions for Preparation oP Data Entry Sheet Licensee Event Beport (LER) File (NUAEG-0161)

s '

I

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-397 UNIT WNP-2 MONTH JANUARY 1989 COMPLETED BY L'B HUTCHISON TELEPHONE 509) 377.-',2486 2.

3.

4.

5.

6.

7.

8.

9.

10.

12.

13.

14.

15.

16.

DAY AVERAGE DAILY POWER LEVEL (MwE-Net) 194 04 805 726 1054 1065 1060 17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

31.

DAY AVERAGE DAILY POWER LEVEL (MwE-Net) 10 1087 1084 1057 1054 1084 223 INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month.

Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100K line (or the restricted power level line).

In such

cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

OPERATING DATA REPORT WNP-2 01-Feb-89 1.

DOCKET: 50-397 2.

REPORTING PERIOD:

UTILITY CONTACT:

Jan-89 OUTAGE + ON-LINE HOURS LEONARD HUTCHISON (509) 377-2486 4.

LICENSED THERMAL POWER (MWt):

5.

NAMEPLATE RATING (GROSS MWe)s 6.

DESIGN ELECTRICAL RATING (NET MWe):

?.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

8.

MAXIMUM DEPENDABLE CAPACITY (NET MWe) z

&323 1200 9 1100 1140 1095 9.

IF CHANGES OCCUR ABOVE SINCE LAST REPORT~

GIVE REASONS:

10.

POWER TO WHICH RESTRICTED~

IF ANY (NET MWe):

11.

REASONS FOR RESTRICTIONS IF ANY'2.

REPORT PERIOD HOURS 13.

HOURS REACTOR CRITICAL 14.

RX RESERVE SHTDWN HRB 15.

HRS GENERATOR ON LINE lb. UNIT RESERVE SHUTDOWN HOURS 17.

GROSS THERMAL ENERGY (MWH) 18.

GROSS ELECTRICAL ENERGY (MWH) 19.

NET ELECTRICAL ENERGY (MWH) 20.

UNIT SERVICE FACTOR 21.

UNIT AVAILABILITYFACTOR 22.

UNIT CAPACITY FACTOR (MDC NET) 23.

UNIT CAPACITY FACTOR (DER NET) 24.

UNIT FORCED OUTAGE RATE 25.

FORCED OUTAGE HOURS MONTH 744 632.0 0.0 618. 3 0.0 1917400 643480 620516

83. 1/
83. 1%
76. 2%
75. 8/
b. 5%
42. 8 YEAR CUMULATIVE 744 36248. 2 632.0 26849.6
0. 0 340. 4 618.3 25782.9
0. 0 381. 7 1917400 71028605 643480 23676980 620516 22788824
83. 1%
71. 1%
83. 1%
72. 2/
76. 2/
57. 4/
75. 8%
7. 2%
b. 5%
9. 6%
42. 8 2734. 4 26.

SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE DURATION):

REFJJELlUCi.dlILLGE EQH.M IMYS ZIMUACi4/M489 27.

IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

2+2/89'.

rv

'lt' v jk tt I>>

($

t j'I Ijj

,It I

~t IJ L4 Ir I f 4

'Ilt Itr, ' 'I Pt kff(

EI<<(t 4 f 't(

~"

III

)EJ I

(

'I( I r 1(t(f Vlf I V=.'

  • (j e>>

=

Vti (

'I

'V". I lj.v

'v f(,

(V

<<J rl I.(,

Iftfl 1

tr

'I t\\

( 0

~

kj r c~

f

,t It V,I t I

(

E. 349k'I

>> g r

a'l a;V o<<,

t'I II.Jt e(

V W ekt f JJ, I

'r

, I JV

'l III U.,V>>'l

~

yt r(

jj I

t IIVV IIIj

~ <<

.J ,.,

EEQ 1

W(f,

'$,'I

" "(k('J

(

IV

~ Vy <<f I

t gtl I kf(tk I

I fit II "i.

V,(t

)

t t I

I I

'I ttt JI 4

'lr

. J(,jf (I

Ef, ff 4<<

t

) I 4

IJ

(

J

ti WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ 3000 George Washington Way

~ Richland, Washington 99352 Docket No. 50-397 February 10; 1989 U.S. Nuclear Regulatory Commission Document Control Desk Washington,'.C.

20555

Dear Sir:

SUBJECT:

NUCLEAR PLANT NO.

2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for January 1989 as required by our Technical Specifications 6.9.1.6.

Very Truly Yours, Oker ~

C.

M. Powers (M/D 927M)

WNP-2 Plant Manager CMP/lc Encl osur e cc: Mr. J.

B. Martin Mr. C. J.

Bosted Ms. Dottie Sherman Mr. J. T. Wheelock Mr.

W.

H. Lovelace NRC Regi on V

NRC Site Representative (901A)

ANI, Farmington CT INPO NRC, Washington D.C.

~

~