Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17286B011 + (10:36:22, 8 January 2025)
- GO2-91-154, Forwards Revised Crew Composition & Planned Shift Scheduled for Modes 4 & 5,per 910725 & s + (10:36:23, 8 January 2025)
- ML17286B008 + (10:36:26, 8 January 2025)
- GO2-91-153, Forwards Rev 7 to Washington Nuclear Plant 2 Licensed Operator Requalification Program Corrective Action Plan, Per NRC Request at 910802 Exit Meeting + (10:36:27, 8 January 2025)
- GO2-91-155, Responds to NRC Re Violations Noted in Insp Rept 50-397/91-18.Corrective Actions:Nov to Be Included as Topic of Discussion During License Operator Requalification Training Program + (10:36:30, 8 January 2025)
- 05000397/LER-1991-018, :on 910712,control Room Emergency Filtration & Standby Gas Treatment Sys Carbon Absorber Surveillances Not Performed Per TS 4.7.2 Requirements.Caused by Inadequate Procedures.Carbon Replaced + (10:36:33, 8 January 2025)
- GO2-91-132, Monthly Operating Rept for Jul 1991 for WPPSS-2 + (10:36:33, 8 January 2025)
- 05000397/LER-1991-020, :on 910716,discovered That RHR Valve B Capability to Shutdown in Event of Fire Could Be Jeopardized Due to Hot Short in Control Circuits.Caused by Design Deficiency.Wiring Changes Implemented.W/Undated Ltr + (10:36:36, 8 January 2025)
- ML17286A999 + (10:36:38, 8 January 2025)
- GO2-91-150, Forwards Fitness for Duty Program Performance Data Personnel Subj to 10CFR26 Rept for Jan-June 1991 + (10:36:39, 8 January 2025)
- ML17286A997 + (10:36:39, 8 January 2025)
- ML17286A992 + (10:36:43, 8 January 2025)
- ML17286A990 + (10:36:44, 8 January 2025)
- ML17286A988 + (10:36:46, 8 January 2025)
- GO2-91-148, Responds to NRC Re Violations Noted in Insp Rept 50-397/91-12 on 910401-0512 & 0516.Corrective Actions:Plant Procedures 2.7.2, Emergency Standby AC Generator, & 7.4.8.1.1.2.1, Diesel Generator..., Revised + (10:36:47, 8 January 2025)
- IR 05000397/1991021 + (10:36:53, 8 January 2025)
- ML17286A980 + (10:36:54, 8 January 2025)
- ML17286A979 + (10:36:55, 8 January 2025)
- ML17286A977 + (10:36:56, 8 January 2025)
- IR 05000397/1991022 + (10:36:57, 8 January 2025)
- ML17286A974 + (10:36:58, 8 January 2025)
- 05000397/LER-1991-016, :on 910707,ESF Actuation Occurred.Caused by Blown Rupture Disk.Corrective Actions Taken to Replace Blown Rupture Disk & to Test Relief Valves for Proper Operating Pressure + (10:37:03, 8 January 2025)
- NUREG-1438, Forwards NUREG-1438, Findings on Issues of Offsite Emergency Preparedness for Pilgrim Power Station, to Assist in Resolution of Outstanding FEMA Deficiencies.W/O Encl + (10:37:04, 8 January 2025)
- TAC:60493 + (10:37:05, 8 January 2025)
- GO2-91-143, Clarifies Inservice Testing Program for Pumps & Valves,Per Generic Ltr 89-04 Re Cold Shutdown,Containment Deinerted Testing & Relief Requests Applicable to All Valves + (10:37:06, 8 January 2025)
- GO2-91-140, Requests Approval to Change to Three Rotating Shifts of 12 Hrs While Shut Down & in Mode 4 to Facilitate Completion of Remediation Program by Allowing for Most Efficient Use of Instructors & Simulator & Operating Crews + (10:37:13, 8 January 2025)
- IR 05000397/1991018 + (10:37:16, 8 January 2025)
- ML17286A965 + (10:37:17, 8 January 2025)
- IR 05000397/1991017 + (10:37:20, 8 January 2025)
- ML17286A960 + (10:37:22, 8 January 2025)
- ML17286A958 + (10:37:23, 8 January 2025)
- ML17286A957 + (10:37:24, 8 January 2025)
- TAC:76783 + (10:37:24, 8 January 2025)
- ML17286A956 + (10:37:25, 8 January 2025)
- GO2-91-135, Special Rept:On 910604,time History Triaxial Acceleration Sensor Found Malfunctioning During Performance of Seismic Sys Maint Activities.Failed Unit Returned Under Warranty to Supplier for Repair.Sys Now Fully Operational + (10:37:26, 8 January 2025)
- ML17286A951 + (10:37:26, 8 January 2025)
- GO2-91-133, Requests That Crew B Be Approved to Assume Shift Responsibilities in Operational Modes 4 & 5.Approval Necessary to Support Present Licensed Operator Remediation Training Program Still Maintaining Shift Rotation + (10:37:28, 8 January 2025)
- ML17286A937 + (10:37:30, 8 January 2025)
- ML17286A938 + (10:37:30, 8 January 2025)
- ML17286A936 + (10:37:32, 8 January 2025)
- ML17286A934 + (10:37:33, 8 January 2025)
- ML17286A932 + (10:37:34, 8 January 2025)
- IR 05000397/1991010 + (10:37:35, 8 January 2025)
- ML17286A929 + (10:37:36, 8 January 2025)
- GO2-91-134, Forwards Response to NRC 910213 Request for Addl Info on Topical Rept WPPSS FTS-129, BWR Transient Analysis Model + (10:37:37, 8 January 2025)
- TAC:77048 + (10:37:37, 8 January 2025)
- ML17286A922 + (10:37:39, 8 January 2025)
- IR 05000397/1991015 + (10:37:41, 8 January 2025)
- ML17286A919 + (10:37:43, 8 January 2025)
- ML17286A915 + (10:37:43, 8 January 2025)
- ML17286A914 + (10:37:44, 8 January 2025)