Forwards Insp Rept 50-397/91-17 on 910513-0605.No Violations or Deficiencies Noted
ML17286A960
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/17/1991
From: Reese J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17286A961 List:
References
NUDOCS 9108050058
Download: ML17286A960 (6)


See also: IR 05000397/1991017

Text

gy,S 4EOgls

0

Oy

A

i~

0

C

O

r.

IA0

Cy

r+/f

0

+**++

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIALANE, SUITE 210

WALNUTCREEK, CALIFORNIA54596-5368

ggt gg

1991

DOCKET NO. 50-397

Washington Public Power Supply System

P. 0.

Box 968

3000 George

Washington

Way

Richland,

Washington

99352

Attention:

Hr.

G.

C. Sorensen,

Manager

Regulatory

Programs

Gentlemen:

SUBJECT:

NRC

INSPECTION

. This letter refers to the inspection

conducted

in office by Mr. A. Mcgueen of

this office from Hay 13 through June

5,

1991, of Revision

12 to the Washington

Nuclear Project,

Unit 2 (WNP-2),

Emergency

Plan Implementing Procedure

(EPIP)

13. 1. 1 submitted

by memorandum,

subject:

WNP-2 Plant Procedures

Hanual-

Volume

13 - Package

No. 91-45,

dated

March 4,

1991; authorized

by

NRC License

No. NPF-21.

This also refers to the discussion of the findings of this

inspection with Hr. A. F. Klauss of your staff on June ll, 1991, at the

conclusion of the inspection.

Areas

examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations of the plan

and associated

documentation

and telephonic

interviews with personnel.

No deficiencies

or violations of NRC requirements

were identified within the

scope of this inspection,

and the revision appears

acceptable

for inclusion in

the. plan.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

regarding this inspection,

we will be glad to

discuss

them with you.

erely,

Ja

.

ee e,

i f

a

uards,

Emergen y Preparedness

and

on-Power Reactor

Branch

Enclosure:

Inspection

Report

No. 50-397/91-17

9iOe050OS8

9>07>7

&DR

ADDCK 05000397

8

PDR

]t= 02

0

cc w/enclosure:

J.

W. Baker,

WNP-2 Plant Hanager

A. G. Hosier,

WNP-2 Licensing Hanager

G.

D. Bouchey, Director, Assurance,8

Licens'ing

G.

E. Doupe,

Esq.,

WPPSS

A. Lee Oxsen,

Deputy Hanaging Director

State of Washington (Curtis Eschels)

H.

H. Philips,

Esq., Attorney, Winston

8 Strawn

R., Donovan,

FEHA, Region

X

~i

cc w/enclosure:

J.

W. Baker,

WNP-2 Plant Manager

A.

G. Hosier,

WNP-2 Licensing Manager

G.

D. Bouchey; Director, Assurance

8 Licensing

G.

E. Doupe,

Esq.,

WPPSS

A. Lee Oxsen,

Deputy Managing Director

State of Washington

(Curtis Eschels)

M. H. Philips,

Esq., Attorney, Winston

5. Strawn

R. Donovan,

FEMA, Region

X

bcc:

A. Mcgueen,

RV

Terry Strong,

DOH

Central File

RV/GMD

EST

COPY

YE

NO(g~

AMcQuee

7/I</981

ST

COPY 'D TO

PDR

NO

.

~YES

NO

se

/g/91

(k

l