Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-91-178, Submits Status of Corrective Actions Associated W/Ler 91-017-00 Re Automatic Start of Diesel Generators Caused by Offsite Grid Disturbance.Operator Responsible for Mispositioned Switch Subj to Disciplinary Action + (10:35:08, 8 January 2025)
- GO2-91-188, Application for Amend to License NPF-21,revising TS 3/4.3.5 & Tables 3.3.5-1 & 4.3.5-1 Re RCIC Actuation Instrumentation & Surveillance Requirements + (10:35:10, 8 January 2025)
- ML17286B104 + (10:35:10, 8 January 2025)
- 05000397/LER-1991-025, :on 910911,train a of Containment Atmosphere Control Sys Rendered Inoperable for More than 30-day Limit Permitted by Ts.Caused by Loss of Oil from Recombiner Blower.Train a & Recombiner Blower Repaired + (10:35:12, 8 January 2025)
- 05000397/LER-1991-024, :on 910909,unanalyzed Condition Associated W/ Postulated Main Steam Line Failure Outside Containment Discovered by Ge.Caused by Failure to Consider Iodine Source Term.Procedure Re Cold Startup Changed + (10:35:14, 8 January 2025)
- GO2-91-180, Monthly Operating Rept for Sept for WNP-2 + (10:35:15, 8 January 2025)
- GO2-91-191, Responds to Generic Ltr 91-06, Adequacy of Safety-Related DC Power Supplies, Pursuant to 10CFR50.54(F).Provides Justification to Questions Listed W/No as Answer + (10:35:16, 8 January 2025)
- GO2-91-012, Provides Actions Planned for Improving Performance of Reactor Bldg post-accident Grab Sampling Sys (REA-SR-48),per Insp Rept 50-397/90-29.State-of-art in-line post-accident Monitoring Sys to Be Installed in Elevated Release Duct + (10:35:18, 8 January 2025)
- GO2-91-192, Forwards Response to NRC Re Violations Noted in Insp Rept 50-397/91-26.Corrective Actions:Containers Labeled as Required & Individuals Involved Were Counseled & Labeling Requirements Discussed + (10:35:19, 8 January 2025)
- ML17286B095 + (10:35:21, 8 January 2025)
- ML17286B093 + (10:35:22, 8 January 2025)
- ML17286B089 + (10:35:23, 8 January 2025)
- ML17286B092 + (10:35:23, 8 January 2025)
- GO2-91-184, Forwards Primary Containment 1991 Integrated Leakage Rate Test Final Rept + (10:35:24, 8 January 2025)
- 05000397/LER-1991-023, :on 910906,HPCS Sys Pump Suction Switchover from Condensate Storage Tanks to Suppression Pool Occurred During Maint Testing.Caused by Incomplete Planning & Scheduling.Operators Realigned HPCS Suction + (10:35:26, 8 January 2025)
- GO2-91-168, Provides Current Status of Corrective Actions for All Outstanding FEMA Deficiencies.One Deficiency Against Wpps Identified.Appropriate Procedures Revised & Provided to FEMA + (10:35:27, 8 January 2025)
- GO2-91-177, Forwards Rev 11 of Emergency Preparedness Plan,Reflecting Changes to Section 11.6.1,Page 11-7,Section 4.4.2.1,Page 4-26,Section 4.4.2.5,Page 4-32,Item F,Section 14.4.1,Page 14-3 & Section 6,Table A.2 + (10:35:30, 8 January 2025)
- ML17286B074 + (10:35:32, 8 January 2025)
- ML17286B073 + (10:35:33, 8 January 2025)
- ML17286B071 + (10:35:34, 8 January 2025)
- ML17286B070 + (10:35:35, 8 January 2025)
- ML17286B068 + (10:35:36, 8 January 2025)
- IR 05000397/1991034 + (10:35:37, 8 January 2025)
- ML17286B061 + (10:35:38, 8 January 2025)
- ML17286B060 + (10:35:39, 8 January 2025)
- ML17286B058 + (10:35:40, 8 January 2025)
- GO2-91-170, Forwards Topical Rept WPPSS-FTS-131, Applications Topical Rept for BWR Design & Analysis + (10:35:41, 8 January 2025)
- ML17286B057 + (10:35:41, 8 January 2025)
- ML17286B054 + (10:35:43, 8 January 2025)
- ML17286B053 + (10:35:44, 8 January 2025)
- ML17286B052 + (10:35:45, 8 January 2025)
- ML17286B049 + (10:35:46, 8 January 2025)
- ML17286B050 + (10:35:46, 8 January 2025)
- GO2-91-169, Provides Response to Request for Addl Info Re Generic Ltr 89-10,Suppl 3, Consideration of Results of NRC-Sponsored Tests of Motor-Operated Valves + (10:35:47, 8 January 2025)
- TAC:77801 + (10:35:47, 8 January 2025)
- GO2-91-167, Responds to NRC Re Violations Noted in Insp Rept 50-397/91-16.Corrective Actions:Improvement Initiatives Have Been Planned to Strengthen Mgt Oversight & Implementation of MOV Program + (10:35:49, 8 January 2025)
- ML17286B047 + (10:35:49, 8 January 2025)
- ML17286B044 + (10:35:51, 8 January 2025)
- GO2-91-165, Monthly Operating Rept for Aug 1991 for WNP-2 + (10:35:52, 8 January 2025)
- ML17286B042 + (10:35:52, 8 January 2025)
- GO2-91-164, Responds to Restart Actions of 910614 Confirmatory Action Ltr Re Unsatisfactory Licensed Operator Requalification Training Program & Establishes How Facility Has Met Restart Requirements Delineated in Confirmatory Action Ltr + (10:35:54, 8 January 2025)
- 05000397/LER-1991-013, :on 910507,non-compliances W/Tech Specs Identified as Part of Program of Surveillance Procedure Verification.Further Evaluation Performed.Quality Action Team to Be Chartered to Evaluate Program + (10:35:56, 8 January 2025)
- IR 05000397/1991023 + (10:36:01, 8 January 2025)
- ML17286B034 + (10:36:02, 8 January 2025)
- 05000397/LER-1991-021, :on 910801,determined That Tritium Sampling Was Not Being Performed During Startup,Shutdown & 15 Percent Power Change Evolutions.Caused by Inadequate Procedure/ Procedure Review.Changed Procedure + (10:36:03, 8 January 2025)
- GO2-91-158, WNP-2 Semiannual Radioactive Effluent Release Rept for Jan-June 1991 + (10:36:04, 8 January 2025)
- IR 05000397/1991012 + (10:36:06, 8 January 2025)
- GO2-89-222, Provides Schedule for Corrective Actions Identified in FEMA Region X Rept for 890201-0301 Ingestion Pathway Zone & re-entry/recovery Exercise + (10:36:07, 8 January 2025)
- IR 05000397/1991025 + (10:36:09, 8 January 2025)
- ML17286B025 + (10:36:11, 8 January 2025)
- ML17286B024 + (10:36:12, 8 January 2025)