Amend 95 to License NPF-21,modifying Radioactive Gaseous Effluent Monitoring Instrumentation in TS 3.3.7.12-1 to Allow Operation of Main Condenser off-gas Treatment Sys
ML17286B068
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/18/1991
From: Dyer J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17286B069 List:
References
NUDOCS 9110070159
Download: ML17286B068 (7)


Text

~PS AK0I, c"

o O

J.s

~

+>>*++

UNITED STATES NUCLEAR REGULATORY COMIVllSSION WASHINGTON, D.C. 20555 WASHINGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO. 50-397 NUCLEAR PROJECT NO.

2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

95 License No. NPF-21 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by the Washington Public Power Supply System

( licensee) dated December 12, 1988 (G02-88-264),

complies with the standards and requireIIIents of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Speci-fications as indicated in the attachmentrto this license amendment and paragraph 2.C.(2) of Facility Operating LiceII " No.

NPF-21 is hereby amended to read as follows:

qj g0070l59 9

pDR ADOCK 0500pDR p

(2)

Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.

9~

and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This amendment is effective as of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION ames E. Dyer, Director Project Directorate V

Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

September 18, 1991

ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 95 TO FACILITY OPERATING LICENSE NO. NPF-21 DOCKET NO. 50-397 Replace the following page of the Appendix A Technical Specifications with the enclosed page.

The revised page is identified by amendment number and contains vertical lines indicating the areas of change.

The corresponding overleaf 'page is also provided to maintain document completeness.

REMOVE 3/4 3-91 INSERT 3/4 3-91

l'[

I(,

l' t

TABLE 3.3.7.12-1 (Continued)

TABLE NOTATIONS "At all times.

""During main condenser offgas treatwent system operation.

NRadwaste Building Ventilation Exhaust fan.

There are 3 fans; i%A-FN-XA, MFA-FN"1B and WEA-FN-1C.

ACTION STATEMENTS ACTION 110-ACTION 111-ACTION 112 "

ACTION 113-ACTION 114-ACTION 115-With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requireaent, effluent releases via this pathway may continue for up to 30 days provided that grab samples are taken at least'nce-per-8 hours and analyzed for noble gas gas+a emitters within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, operation of main con-denser offgas treatment system may continue for up to 30 days provided that grab samples are collected at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and analyzed within the following 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

If the recombiner temperature remains constant and THERMAL POWER has not changed, the grab sample co1lection frequency may be changed to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases via this pathway may continue for up to 30 days provided that within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after the channel has been declared inoperable samples are continuously collected with auxiliary sampling equipment as required in Table 4.11-2.

With the number of channels OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases via this pathway may continue for up to 30 days provided that the flow rate is estimated at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

With the number of channels operable less than required by the Minimum Channels OPERABLE requireaent, gases from the main condenser offgas treatment system may be released to the environ-ment for up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> provided:

a.

The offgas treatment system is not bypassed, and b.

The offgas post-treatment aonitor used in a pretreatment-functi'on shall be OPERABLE.~

With the number of channels OPERABLE less than required by the Hinimum Channels OPERABLE requirement, effluent releases via this pathway shall be terminated.

'"With the offgas post-treatment monitor in a pretreatment function unavailable or inoperable, install a temporary replacement ionization chamber for the pre-treatment monitor or be in HOT STANDBY within the following 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />..

WASHINGTON NUCLEAR - UNIT 2 3/4 3-92 Amendment No.

32

TABLE 3.3.7.12-1 (Continued)

RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION INSTRUMENT 5.

Radwaste Building Ventilation Exhaust MINIMUM CHANNELS OPERABLE APPLICABILITY ACTION a.

Noble Gas Activity Monitor 1)

Low Range 2)

Intermediate Range b.

Iodine Sampler c.

Particulate Sampler I

1 110 110 112 d.

Effluent System Flow Rate Measurement 1

Device 8 e.

Sampler Flow Rate Monitor 6.

Main Condenser Off-Gas Treatment Explosive Gas Monitoring System a.

Hydrogen Monitor 115 113 111