ML17286B104

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec 3/4.3.5 & Tables 3.3.5-1 & 4.3.5-1 Re RCIC Instrumentation & Surveillance Requirements
ML17286B104
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/15/1991
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17286B103 List:
References
NUDOCS 9110240133
Download: ML17286B104 (5)


Text

O4" QN Ow OO DOB CQcJr RQ n

ImD Kl FUNCTIONAL UNITS TABLE 3. 3. 5-1 REACTOR CORE ISOLATION COOLING SYSTEM ACTUATION IHSTRUllENTATION HIHIMUH OPERABLE CllABBELl PER TRIP SYSTEM ACTION a.

Reactor Vessel Mater Level - Low Low, Level 2

b.

Reactor Vessel Water Level - lligh, Level 8 c.

Condensate Storage Tank Mater Level Low Low d.

llanual Initiation 2(b) 2(c) i 1(d) 50 51 52 53 placing the trip system in the tripped condition provided at least one other OPERABLE channel in the same trip systenr is monitoring that parameter.

(b)

One trip system with two-out-of-two logic.

(c)

One trip system with one-out-of-two logic.

(d)

One trip system with one channel.

0K Q

I I

fTI DA" 0

..0

1 t

I

~ I ONTROLLED C0PY

~ ~

I I'

  • t TABLE 3. 3. 5-1 (Continued)

REACTOR CORE ISOLATION COOLING SYSTEM ACTUATION INSTRUMENTATION ACTION STATEMENTS ACTION 50 -

With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip System requirement:

a.

For one trip system, place the inoperable channel(s) and/or that trip system in the tripped condition within 2-hou~ or declare the RCIC system inoperable.

r4o~fZS b.

For both trip systems, declare the RCIC system inoperable.

ACTION 51 -

With the number of OPERABLE channels less than required by the minimum OPERABLE channels per Trip System requirement, AecLa~

bl ACTION 52 -

With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip System requirement, place at least one inoperable channel in the tripped condition within -

our or declare the RCIC system inoperable.

C70urLS ACTION 53 -

With t e number of OPERABLE channels one less than required by the Minimum OPERABLE Channels per Trip System requirement, restore the inoperable channel to OPERABLE status within

-B-hears or declare the RCIC system inoperable.

/

gg p go~%

r,,~ 5',I.j,/ ~

EJ c

/n/ppd v klc

...Sir~ d7 pc/ Q

~yale WASHINGTON NUCLEAR - UNIT 2 3/4 3-49

TABLE 4. 3. 5. l-l REACTOR CORE ISOLATION COOLING SYSTEH ACTUATION INSTRUHENTATION SURVEILLANCE RE UIREHENTS FUNCTIONAL UNITS a.

Reactor Vessel Mater Level-(Low Low, Level 2) b.

Reactor Vessel Mater Level Nigh, Level (B) c.

Condensate Storage Tank Level - Low d.

Hanual Initiation CIIANNEL CIIECK N. A.

CflANNEL FUNCTIONAL TEST CflANNEL CALIBRATION N.A.

R Q

I Iffl U

OQ

.,"0

0 1.

l,