Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000397/1996014 + (09:24:06, 8 January 2025)
- ML17292A622 + (09:24:07, 8 January 2025)
- GO2-96-237, Responds to NRC Re Violations Noted in Insp Rept 50-397/96-16.Corrective Actions:Asd Testing Stopped & site- Wide Timeout for All Employees Conducted + (09:24:08, 8 January 2025)
- GO2-96-235, Submits Cycle 12 Startup Rept for Plant Per Ts.Encl Repts Provide Descriptions of Startup & Power Ascension Testing Activities + (09:24:10, 8 January 2025)
- ML17292A618 + (09:24:11, 8 January 2025)
- ML17292A616 + (09:24:12, 8 January 2025)
- TAC:M91159 + (09:24:12, 8 January 2025)
- GO2-96-229, Submits Response to SE on Inservice Testing Program Relief Requests for Pumps & Valves. WNP-2 IST Program Plan (Pumps & Valves) 2nd Interval (941213-041212), Rev 1 Encl + (09:24:13, 8 January 2025)
- ML17292A610 + (09:24:15, 8 January 2025)
- ML17292A611 + (09:24:15, 8 January 2025)
- GO2-96-231, Responds to Request for MOV Actuator Capability Calculations for HPCS Injection Valve HPCS-V-4 & RCIC Suppression Pool Suction Valve RCIC-V-31 + (09:24:16, 8 January 2025)
- GO2-96-230, Responds to NRC Re Exercise Weakness in Insp Rept 50-397/96-14.Corrective Actions:Reiterated Mgt Expectations Associated W/Offsite Notification Process to Appropriate Personnel Responsible for Protective Action Recommendations + (09:24:17, 8 January 2025)
- ML17292A604 + (09:24:19, 8 January 2025)
- IR 05000397/1996019 + (09:24:20, 8 January 2025)
- IR 05000397/1996021 + (09:24:23, 8 January 2025)
- ML17292A596 + (09:24:25, 8 January 2025)
- IR 05000397/1996013 + (09:24:26, 8 January 2025)
- IR 05000397/1996011 + (09:24:27, 8 January 2025)
- GO2-96-223, Monthly Operating Rept for Oct 1996 for WNP-2 + (09:24:28, 8 January 2025)
- GO2-96-221, Special Rept:On 961023,intermediate & High Range Stack Monitors PRM-RE-1B & PRM-RE-1C Declared Inoperable.Caused by Monitor Output Had Upward Trend Due to Electronic Noise Interference.Work Request Generated + (09:24:30, 8 January 2025)
- ML17292A591 + (09:24:30, 8 January 2025)
- ML17292A589 + (09:24:32, 8 January 2025)
- GO2-96-222, Provides Required 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves + (09:24:33, 8 January 2025)
- GO2-96-217, Submits Response to NRC Bulletin 96-003, Potential Plugging of Emergency Core Cooling Suction Strainers by Debris in Bwrs + (09:24:34, 8 January 2025)
- ML17292A587 + (09:24:34, 8 January 2025)
- GO2-96-216, Provides Addl Info to Assist NRC in Evaluating Issues in Insp Rept 50-397/96-16 & NOV + (09:24:36, 8 January 2025)
- ML17292A584 + (09:24:38, 8 January 2025)
- ML17292A582 + (09:24:39, 8 January 2025)
- ML17292A581 + (09:24:40, 8 January 2025)
- ML17292A578 + (09:24:41, 8 January 2025)
- ML17292A577 + (09:24:42, 8 January 2025)
- GO2-96-213, Informs That Written Summary Rept Will Be Submitted to NRC Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, within 120 Days + (09:24:43, 8 January 2025)
- ML17292A576 + (09:24:43, 8 January 2025)
- ML17292A574 + (09:24:45, 8 January 2025)
- GO2-96-208, Responds to NRC Re Violations Noted in Insp Rept 50-397/96-16.Corrective Actions:Log Entry Corrected + (09:24:46, 8 January 2025)
- ML17292A568 + (09:24:50, 8 January 2025)
- ML17292A567 + (09:24:51, 8 January 2025)
- ML17292A563 + (09:24:51, 8 January 2025)
- ML17292A560 + (09:24:52, 8 January 2025)
- IR 05000397/1995001 + (09:24:54, 8 January 2025)
- ML17292A558 + (09:24:55, 8 January 2025)
- IR 05000397/1996001 + (09:24:56, 8 January 2025)
- ML17292A555 + (09:24:57, 8 January 2025)
- ML17292A551 + (09:24:58, 8 January 2025)
- GO2-96-199, Application for Amend to License NPF-21 to Modify TS for Secondary Containment & Standby Gas Treatment Sys to Reflect Revised Secondary Containment Drawdown & post-accident Analyses Results.Affidavit,Encl + (09:24:59, 8 January 2025)
- GO2-96-202, Responds to Addl Request by Staff That Plants W/Spring 1997 Refueling Outages Make Plant Specific Submittals Justifying Not Meeting Bulletin 96-003 Implementation Schedule.Summary of Significant Barriers to Spring 1997 & Justification,Enc + (09:25:00, 8 January 2025)
- GO2-96-200, Provides Response to Request for Addl Info on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves + (09:25:01, 8 January 2025)
- GO2-96-201, Responds to NRC Re Violations Noted in Insp Rept 50-397/96-11.Corrective Actions:Design Engineering Manager Approval of All TER Changes Required.On 960724 Scaffolding Stockpiles in RCIC & RHR a & B Rooms Removed + (09:25:03, 8 January 2025)
- GO2-96-197, Forwards Response to NRC Re Violations Noted in Insp Rept 50-397/96-16.Corrective Action:Cro Log Has Been Corrected + (09:25:04, 8 January 2025)
- GO2-96-198, Informs That Change to Met Tower Data Point Ids Reflects Configuration for Weather (Met) Signal Point Ids Associated W/Stability Class,Wind Speed & Wind Direction + (09:25:05, 8 January 2025)
- ML17292A541 + (09:25:06, 8 January 2025)