ML17292A544 +
NRC 960912 +, GO2-96-201, Responds to NRC Re Violations Noted in Insp Rept 50-397/96-11.Corrective Actions:Design Engineering Manager Approval of All TER Changes Required.On 960724 Scaffolding Stockpiles in RCIC & RHR a & B Rooms Removed +, GO2-83-408, Responds to Re TMI Action Item II.K.3.18, Mods to ADS Sys Logic. One of Two Options (2 or 4) Will Be Implemented.Choice Based on Benefit to Design Impact on Schedule,Availability of Hardware & Analysis & Total Cost + and GO2-83-660, Advises That BWR Owners Group Option 2 Will Be Implemented Per SER (NUREG-0892) Outstanding Issue 1.7(9), Mods to Automatic Depressurization Sys Logic. Reliance on RCIC Sys as HPCS Backup for Selected Accidents Eliminated +
Bemis P + and Energy Northwest +
GO2-96-201, Responds to NRC Re Violations Noted in Insp Rept 50-397/96-11.Corrective Actions:Design Engineering Manager Approval of All TER Changes Required.On 960724 Scaffolding Stockpiles in RCIC & RHR a & B Rooms Removed +, GO2-83-408, Responds to Re TMI Action Item II.K.3.18, Mods to ADS Sys Logic. One of Two Options (2 or 4) Will Be Implemented.Choice Based on Benefit to Design Impact on Schedule,Availability of Hardware & Analysis & Total Cost + and GO2-83-660, Advises That BWR Owners Group Option 2 Will Be Implemented Per SER (NUREG-0892) Outstanding Issue 1.7(9), Mods to Automatic Depressurization Sys Logic. Reliance on RCIC Sys as HPCS Backup for Selected Accidents Eliminated +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
GO2-96-201, Responds to NRC Re Violations Noted in Insp Rept 50-397/96-11.Corrective Actions:Design Engineering Manager Approval of All TER Changes Required.On 960724 Scaffolding Stockpiles in RCIC & RHR a & B Rooms Removed +, GO2-96-201, Responds to NRC Re Violations Noted in Insp Rept 50-397/96-11.Corrective Actions:Design Engineering Manager Approval of All TER Changes Required.On 960724 Scaffolding Stockpiles in RCIC & RHR a & B Rooms Removed +, GO2-96-201, Responds to NRC Re Violations Noted in Insp Rept 50-397/96-11.Corrective Actions:Design Engineering Manager Approval of All TER Changes Required.On 960724 Scaffolding Stockpiles in RCIC & RHR a & B Rooms Removed +, GO2-96-201, Responds to NRC Re Violations Noted in Insp Rept 50-397/96-11.Corrective Actions:Design Engineering Manager Approval of All TER Changes Required.On 960724 Scaffolding Stockpiles in RCIC & RHR a & B Rooms Removed +, GO2-96-201, Responds to NRC Re Violations Noted in Insp Rept 50-397/96-11.Corrective Actions:Design Engineering Manager Approval of All TER Changes Required.On 960724 Scaffolding Stockpiles in RCIC & RHR a & B Rooms Removed +, GO2-96-201, Responds to NRC Re Violations Noted in Insp Rept 50-397/96-11.Corrective Actions:Design Engineering Manager Approval of All TER Changes Required.On 960724 Scaffolding Stockpiles in RCIC & RHR a & B Rooms Removed +, GO2-96-201, Responds to NRC Re Violations Noted in Insp Rept 50-397/96-11.Corrective Actions:Design Engineering Manager Approval of All TER Changes Required.On 960724 Scaffolding Stockpiles in RCIC & RHR a & B Rooms Removed +, GO2-96-201, Responds to NRC Re Violations Noted in Insp Rept 50-397/96-11.Corrective Actions:Design Engineering Manager Approval of All TER Changes Required.On 960724 Scaffolding Stockpiles in RCIC & RHR a & B Rooms Removed +, GO2-96-201, Responds to NRC Re Violations Noted in Insp Rept 50-397/96-11.Corrective Actions:Design Engineering Manager Approval of All TER Changes Required.On 960724 Scaffolding Stockpiles in RCIC & RHR a & B Rooms Removed + and GO2-96-201, Responds to NRC Re Violations Noted in Insp Rept 50-397/96-11.Corrective Actions:Design Engineering Manager Approval of All TER Changes Required.On 960724 Scaffolding Stockpiles in RCIC & RHR a & B Rooms Removed +
October 15, 1996 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
09:25:03, 8 January 2025 +
NUREG-0892, Forwards Suppl to SER Chapter 9 Conditionally Accepting Applicant 830719 Request to Delay Relocation of HPCS Diesel Generator Control Panel & Installation of Air Dryers in Emergency Diesel Generator Air Starting Sys + and NUREG-0737, To NUREG-0737, Request for Extension of Time for Commission Order Dated June 14, 1984 +
28 +
October 15, 1996 +
TS-6.5.2.7 + and TS-6.8.1 +
Responds to NRC Re Violations Noted in Insp Rept 50-397/96-11.Corrective Actions:Design Engineering Manager Approval of All TER Changes Required.On 960724 Scaffolding Stockpiles in RCIC & RHR a & B Rooms Removed +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.