UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Iv 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011 6064 NOV 29 I996 J. V. Parrish, Chief Executive Officer Washington Public Power Supply System 3000 George Washington Way P.O. Box 968, MD 1023 Richland, Washington 99352
SUBJECT:
SEMIANNUALPLANT PERFORMANCE REVIEW (SPPR) - WASHINGTON NUCLEAR PLANT 2 On October 30, 1996, the NRC staff completed the Semiannual Plant Performance Review (SPPR) of Washington Nuclear Plant 2 (WNP-2). The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.
The results are used by NRC management to facilitate planning and allocation of inspection, resources.
The SPPR for WNP-2 involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period March through September 1996.
SPPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management Meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the WNP-2 SPPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite.
The enclosure details our inspection plan for the next 8 months.
The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas.
Resident inspections are not listed due to their ongoing and continuous nature.
We will inform you of any changes to the inspection plan.
If you have any questions, please contact Howard Wong at 510-975-0296.
Sincerely, J. E.
yer, Director Division of Reactor Projects Docket No.: 50-397 License No.:
Enclosure:
Inspection Plan 9bi2050059 9bii29 PDR ADOCK 050003'P7 8
Washington Public Power Supply System cc w/enclosure:
Frederick S. Adair, Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, Washington 98504-3172
- Chairman, Benton County Board of Commissioners P.O. Box 69 Prosser, Washington 99350-0190 Mr. Paul R. Bemis (Mail Drop PE20)
Vice President, Nuclear Operations Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Rodney L. Webring (Mail Drop PE08)
Vice President, Operations Support/PIO Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Greg O. Smith (Mail Drop 927M)
WNP-2 Plant General Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. David A. Swank (Mail Drop PE20)
Manager, Regulatory Affairs, Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Al E. Mouncer (Mail Drop 396)
Chief Counsel Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968
Washington Public Power Supply System Ms. Lourdes C. Fernandez IMail Drop PE20)
Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Malcolm H. Phillips, Jr., Esq.
Winston 5 Strawn 1400 L Street, N.W.
Washington, D.C. 20005-3502
. Washington Public Power Supply System NOV 29 l996 bcc to DMB IE01 bcc distrib. by RIV:
L. J. Callan DRP Director Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
Resident Inspector DRS-PSB MIS System RIV File M. Hammond (PAO, WCFO)
R. Azua (DRP/TSS)
DOCUMENT NAME: G'tiDRPDIR>SPPRttWNP.LTR To receive copy of document, indicate In box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:PI'DRP/E C
GWJohnston FRHuey TPGwyn AC:DRP/E C
D:DRS D:DRP JEDye 11/26/96 (DEC) 1 1/26/96 11 96 1 1/giI/96 OFFICIAL RECORD COPY Og002>
Washington Public Power Supply System NOY 29 l996 bcc to DMB IE01 bcc distrib. by RIV:
L. J. Callan DRP Director Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
Resident Inspector DRS-PSB MIS System RIV File M. Hammond (PAO, WCFO)
R. Azua (DRP/TSS)
DOCUMENT NAME: G:tDRPDIRiSPPRiWNP.LTR To receive copy of document, indicate ln box: "C" "-Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:PI:DRP/E C
AC:DRP/E C
D:DRS D:DRP GWJohnston 11/26/96 (DEC)
FRHuey 1 1/26/96 JEDye TPGwyn 1 1/giI/96 11 96 OFFICIAL RECORD COPY
WNP-2 INSPECTION PLAN IP - Inspection Procedure Tl - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)
INSPECTION IP 71001 IP 93801 IP 86750 TI-133 TITLE/
PROGRAM AREA Requalification Inspection SSFI - Architect Engineer Inspection Solid Radwaste and Transportation, and Implementation of Revised 49 CFR NUMBER OF PLANNED INSPECTORS INSPECTION DATES 1 2/9-1 3/96 1 2/9-20/96 1/6-1 7/97 1/6-1 0/97 TYPE OF INSPECTION COMMENTS Core Inspection NRR Initiative Core Inspection IP 81700 Physical Security Program for Power Reactors 1/27-31/97 Core Inspection and Temporary Instruction IP 40500 Tl-132 Effectiveness of Licensee Controls in Identifying, Resolving, and Preventing Problems Vehicle Barrier Inspection To be determined.
Core Inspection Expected to be in January 1997.
To be determined.
Temporary Instruction Expected to be in April 1997 IP 73753 In Service Inspection (ISI) 4/21-25/97 Core Inspection