Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17292A647 + (09:23:44, 8 January 2025)
- 05000397/LER-1996-008, :on 961205,failure to Comply with TS Action Requirement for Emergency Core Cooling Sys Actuation Instrumentation Occurred Due to Unidentified Inoperability Condition.Pmr Initiated + (09:23:46, 8 January 2025)
- TAC:M94226 + (09:23:47, 8 January 2025)
- NUREG-1434, Forwards Final Draft SE of Washington Public Power Supply System Proposed Conversion of Washington Nuclear Project 2 TS to Improve TS Based on NUREG-1434, Standard TS of GE Plants,Bwr 6, Rev 1 Dated Apr 1995.W/o Encl + (09:23:48, 8 January 2025)
- ML17292A643 + (09:23:49, 8 January 2025)
- GO2-96-253, Informs of Change of Address for Corporate Offices.Current Distribution List for Nrc,Encl + (09:23:50, 8 January 2025)
- GO2-96-252, Forwards Rept Qualification of Supply Sys Use of RODEX2 Code, for Gap Conductance Calculation in Topical Rept WPPSS-FTS-131, Applications Topical Rept for BWR Design & Analysis. Rept Provides Justification for Use of Code + (09:23:52, 8 January 2025)
- ML17292A641 + (09:23:52, 8 January 2025)
- GO2-96-246, Submits Response to GL 94-02,Action 2, Long-Term Solutions & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Boiling Water Reactors + (09:23:53, 8 January 2025)
- ML17292A638 + (09:23:55, 8 January 2025)
- 05000397/LER-1996-007, :on 961122,electrical Breakers Were Not Seismically Qualified in Test/Disconnect Position.Circuit Breaker Mfg Did Not Consider Raced Out Breaker Position During Testing.Relocated Circuit Breakers + (09:23:56, 8 January 2025)
- GO2-96-016, Washington Public Power Supply Sys Annual Rept for 1996 + (09:23:58, 8 January 2025)
- GO2-96-241, Submits Proposed Mod to Amend Requests Revs a & B Re Overall Conversion of Current TS to Improved TS Based Upon NUREG-1434,rev 1 + (09:23:59, 8 January 2025)
- ML17292A634 + (09:23:59, 8 January 2025)
- GO2-96-239, Monthly Operating Rept for Nov 1996 for WNP-2 + (09:24:01, 8 January 2025)
- GO2-96-238, Forwards Util Rept on FW Nozzle Exams Performed During Spring 1996 Refueling Outage + (09:24:02, 8 January 2025)
- ML17292A628 + (09:24:04, 8 January 2025)
- ML17292A624 + (09:24:05, 8 January 2025)
- IR 05000397/1996014 + (09:24:06, 8 January 2025)
- ML17292A622 + (09:24:07, 8 January 2025)
- GO2-96-237, Responds to NRC Re Violations Noted in Insp Rept 50-397/96-16.Corrective Actions:Asd Testing Stopped & site- Wide Timeout for All Employees Conducted + (09:24:08, 8 January 2025)
- GO2-96-235, Submits Cycle 12 Startup Rept for Plant Per Ts.Encl Repts Provide Descriptions of Startup & Power Ascension Testing Activities + (09:24:10, 8 January 2025)
- ML17292A618 + (09:24:11, 8 January 2025)
- ML17292A616 + (09:24:12, 8 January 2025)
- TAC:M91159 + (09:24:12, 8 January 2025)
- GO2-96-229, Submits Response to SE on Inservice Testing Program Relief Requests for Pumps & Valves. WNP-2 IST Program Plan (Pumps & Valves) 2nd Interval (941213-041212), Rev 1 Encl + (09:24:13, 8 January 2025)
- ML17292A610 + (09:24:15, 8 January 2025)
- ML17292A611 + (09:24:15, 8 January 2025)
- GO2-96-231, Responds to Request for MOV Actuator Capability Calculations for HPCS Injection Valve HPCS-V-4 & RCIC Suppression Pool Suction Valve RCIC-V-31 + (09:24:16, 8 January 2025)
- GO2-96-230, Responds to NRC Re Exercise Weakness in Insp Rept 50-397/96-14.Corrective Actions:Reiterated Mgt Expectations Associated W/Offsite Notification Process to Appropriate Personnel Responsible for Protective Action Recommendations + (09:24:17, 8 January 2025)
- ML17292A604 + (09:24:19, 8 January 2025)
- IR 05000397/1996019 + (09:24:20, 8 January 2025)
- IR 05000397/1996021 + (09:24:23, 8 January 2025)
- ML17292A596 + (09:24:25, 8 January 2025)
- IR 05000397/1996013 + (09:24:26, 8 January 2025)
- IR 05000397/1996011 + (09:24:27, 8 January 2025)
- GO2-96-223, Monthly Operating Rept for Oct 1996 for WNP-2 + (09:24:28, 8 January 2025)
- GO2-96-221, Special Rept:On 961023,intermediate & High Range Stack Monitors PRM-RE-1B & PRM-RE-1C Declared Inoperable.Caused by Monitor Output Had Upward Trend Due to Electronic Noise Interference.Work Request Generated + (09:24:30, 8 January 2025)
- ML17292A591 + (09:24:30, 8 January 2025)
- ML17292A589 + (09:24:32, 8 January 2025)
- GO2-96-222, Provides Required 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves + (09:24:33, 8 January 2025)
- GO2-96-217, Submits Response to NRC Bulletin 96-003, Potential Plugging of Emergency Core Cooling Suction Strainers by Debris in Bwrs + (09:24:34, 8 January 2025)
- ML17292A587 + (09:24:34, 8 January 2025)
- GO2-96-216, Provides Addl Info to Assist NRC in Evaluating Issues in Insp Rept 50-397/96-16 & NOV + (09:24:36, 8 January 2025)
- ML17292A584 + (09:24:38, 8 January 2025)
- ML17292A582 + (09:24:39, 8 January 2025)
- ML17292A581 + (09:24:40, 8 January 2025)
- ML17292A578 + (09:24:41, 8 January 2025)
- ML17292A577 + (09:24:42, 8 January 2025)
- GO2-96-213, Informs That Written Summary Rept Will Be Submitted to NRC Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, within 120 Days + (09:24:43, 8 January 2025)
- ML17292A576 + (09:24:43, 8 January 2025)