Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203B401 + (06:54:39, 8 December 2024)
- ML20203B399 + (06:54:39, 8 December 2024)
- ML20203B398 + (06:54:40, 8 December 2024)
- ML20203B396 + (06:54:40, 8 December 2024)
- ML20203B395 + (06:54:41, 8 December 2024)
- ML20203B393 + (06:54:42, 8 December 2024)
- ML20203B392 + (06:54:45, 8 December 2024)
- ML20203B391 + (06:54:46, 8 December 2024)
- ML20203B390 + (06:54:46, 8 December 2024)
- ML20203B385 + (06:54:47, 8 December 2024)
- ML20203B386 + (06:54:47, 8 December 2024)
- 05000306/LER-1998-001, Forwards LER 98-001-00 Re Lockout of 10 Transformer Resulting in Auto Load Rejection/Restoration on Safety Related Bus.Event Reported Via Emergency Notification Sys in Accordance w/10CFR50.72 on 980121 + (06:54:53, 8 December 2024)
- ML20203B378 + (06:54:57, 8 December 2024)
- ML20203B373 + (06:54:58, 8 December 2024)
- ML20203B374 + (06:54:58, 8 December 2024)
- ML20203B371 + (06:54:59, 8 December 2024)
- ML20203B372 + (06:54:59, 8 December 2024)
- ML20203B367 + (06:55:00, 8 December 2024)
- ML20203B369 + (06:55:00, 8 December 2024)
- ML20203B365 + (06:55:01, 8 December 2024)
- ML20203B364 + (06:55:02, 8 December 2024)
- ML20203B362 + (06:55:03, 8 December 2024)
- ML20203B361 + (06:55:04, 8 December 2024)
- ML20203B360 + (06:55:04, 8 December 2024)
- ML20203B359 + (06:55:05, 8 December 2024)
- ML20203B356 + (06:55:06, 8 December 2024)
- ML20203B354 + (06:55:07, 8 December 2024)
- ML20203B352 + (06:55:07, 8 December 2024)
- ML20203B350 + (06:55:08, 8 December 2024)
- ML20203B351 + (06:55:08, 8 December 2024)
- NSD-NRC-97-5454, Discusses SSAR Rev,Proposing Suppl Criteria That Would Require Min Shear Reinforcement at Most Locations of AP600 Basemat.Draft SSAR Rev Encl + (06:55:09, 8 December 2024)
- ML20203B348 + (06:55:09, 8 December 2024)
- ML20203B345 + (06:55:15, 8 December 2024)
- ML20203B343 + (06:55:15, 8 December 2024)
- ML20203B342 + (06:55:16, 8 December 2024)
- 1CAN048605, Provides Info to Document 860327 Telcon Re Seismic Design Issue Noted in Insp Rept 50-313/86-01 on 860106-31.Disagrees W/Nrc Conclusion That Seismic Class 2 Structures Not Considered in Plant Design + (06:55:17, 8 December 2024)
- ML20203B336 + (06:55:17, 8 December 2024)
- ML20203B334 + (06:55:19, 8 December 2024)
- ML20203B333 + (06:55:19, 8 December 2024)
- ML20203B332 + (06:55:20, 8 December 2024)
- ML20203B330 + (06:55:22, 8 December 2024)
- B12002, Forwards Probabilistic risk-based Fire Analysis of internally-initiated Events.Fire Analysis Documented as Chapter 6 of Probabilistic Safety Study.W/Nine Oversize Encls + (06:55:24, 8 December 2024)
- ML20203B328 + (06:55:24, 8 December 2024)
- U-600534, Forwards Addendum Info Re Power Ascension Program Acceleration Test Package STP 8.0, Control Rod Sequence Exchange Test Deletion. Info Provides Examples of Startup Test Programs Using GE Procedures + (06:55:25, 8 December 2024)
- ML20203B323 + (06:55:26, 8 December 2024)
- U-602939, Part 21 Interim Rept 21-97-060 Re Sentry Equipment Corp Commercial Grade Dedication Program Deficiencies.Evaluation of Issue Will Be Completed by 980404 + (06:55:26, 8 December 2024)
- ML20203B321 + (06:55:27, 8 December 2024)
- NRC-86-9043, Forwards Update of All Commitments Made in Response to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. Post-trip & post-maint Operability Testing Review Completed + (06:55:28, 8 December 2024)
- ML20203B319 + (06:55:28, 8 December 2024)
- ML20203B316 + (06:55:29, 8 December 2024)
- ML20203B314 + (06:55:30, 8 December 2024)