Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203G953 + (05:55:11, 8 December 2024)
- ML20203G952 + (05:55:11, 8 December 2024)
- ML20203G951 + (05:55:13, 8 December 2024)
- ML20203G949 + (05:55:14, 8 December 2024)
- ML20203G947 + (05:55:15, 8 December 2024)
- PNO-III-94-013, on 940308,contract Worker Was Injured When He Fell Into Blowdown Demineralizer Vault.Worker Was Transported in Ambulance to Area Hosp in Serious Condition + (05:55:15, 8 December 2024)
- ML20203G944 + (05:55:16, 8 December 2024)
- ML20203G945 + (05:55:16, 8 December 2024)
- ML20203G942 + (05:55:17, 8 December 2024)
- ML20203G941 + (05:55:18, 8 December 2024)
- ML20203G934 + (05:55:19, 8 December 2024)
- ML20203G931 + (05:55:21, 8 December 2024)
- ML20203G929 + (05:55:21, 8 December 2024)
- PNO-III-94-039, on 940517,two Persons,Russian Visitor & Interpreter Were Killed in Traffic Accident Near Charlevoix,Mi.Cause of Accident Under Investigation + (05:55:24, 8 December 2024)
- ML20203G920 + (05:55:38, 8 December 2024)
- ML20203G916 + (05:55:41, 8 December 2024)
- ML20203G917 + (05:55:41, 8 December 2024)
- PNO-III-94-086, on 941103,near End of Operability Test for 2B Emergency Diesel Generator Master Rod in Diesel Failed Resulting in Significant Internal Damage to 1L & 1R Cylinders + (05:55:42, 8 December 2024)
- ML20203G913 + (05:55:43, 8 December 2024)
- ML20203G912 + (05:55:43, 8 December 2024)
- TXX-4767, Interim Deficiency Rept CP-86-16 Re Possible Detrimental Fire Effects on Instrument Tubing.Initially Reported on 860321.Efforts Underway to Specify Complete Program of Corrective Action.Next Rept Will Be Submitted by 860606 + (05:55:44, 8 December 2024)
- ML20203G908 + (05:55:45, 8 December 2024)
- ML20203G904 + (05:55:46, 8 December 2024)
- ML20203G902 + (05:55:47, 8 December 2024)
- ML20203G901 + (05:55:48, 8 December 2024)
- ML20203G896 + (05:55:49, 8 December 2024)
- ML20203G894 + (05:55:53, 8 December 2024)
- PNO-III-94-090, on 941219,reactor Operators Began Startup of Plant 2 Reactor Following Recovery from Turbine Generator Failure & Fire on 931225 + (05:55:53, 8 December 2024)
- ML20203G891 + (05:55:54, 8 December 2024)
- ST-HL-AE-1691, Revised Final Deficiency Rept Re Potential Failure of Nonseismic Component Cooling Water Tank Level & Flow Switches During Earthquake.Initially Reported on 850207. Surge Tank Level Switches Provided for Protection + (05:55:55, 8 December 2024)
- LIC-98-0024, Forwards Nuclear Matl Transaction Rept (Doe/Nrc Form 741) as Required by 10CFR74.15(a) + (05:55:58, 8 December 2024)
- ML20203G884 + (05:55:58, 8 December 2024)
- ML20203G882 + (05:55:59, 8 December 2024)
- 05000482/LER-1986-016, :on 860327,control Room Ventilation Isolation, Containment Purge Isolation & Fuel Bldg Isolation Signals Occurred.Caused by 15-volt Power Supply Malfunction.Root Cause Under Investigation + (05:56:04, 8 December 2024)
- ML20203G877 + (05:56:06, 8 December 2024)
- ML20203G879 + (05:56:06, 8 December 2024)
- ML20203G876 + (05:56:07, 8 December 2024)
- 05000354/LER-1986-031, :on 860629,reactor Scram Occurred as Result of Upscale Trip on intermediate-range Monitor D.Caused by Personnel Error.Operator Counseled + (05:56:09, 8 December 2024)
- ML20203G869 + (05:56:13, 8 December 2024)
- ML20203G867 + (05:56:16, 8 December 2024)
- ML20203G864 + (05:56:17, 8 December 2024)
- ML20203G862 + (05:56:18, 8 December 2024)
- ML20203G863 + (05:56:18, 8 December 2024)
- ML20203G859 + (05:56:19, 8 December 2024)
- ML20203G855 + (05:56:20, 8 December 2024)
- ML20203G858 + (05:56:20, 8 December 2024)
- ML20203G854 + (05:56:21, 8 December 2024)
- ML20203G853 + (05:56:21, 8 December 2024)
- ML20203G851 + (05:56:22, 8 December 2024)
- ML20203G850 + (05:56:23, 8 December 2024)
- ML20203G848 + (05:56:24, 8 December 2024)
- ML20203G849 + (05:56:24, 8 December 2024)