Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205D200 + (00:01:26, 8 December 2024)
- TXX-4953, Forwards Comanche Peak Review Team Results Repts,Including Rev 2 to Isap I.a.4, Agreement Between Drawings & Field Terminations & Rev 1 to Isap I.a.5, Nonconformance Repts on Vendor Installed Amp Terminal Lugs + (00:01:27, 8 December 2024)
- ML20205D191 + (00:01:28, 8 December 2024)
- ML20205D184 + (00:01:30, 8 December 2024)
- ML20205D180 + (00:01:31, 8 December 2024)
- ML20205D182 + (00:01:31, 8 December 2024)
- IR 05000528/1987011 + (00:01:36, 8 December 2024)
- ML20205D177 + (00:01:37, 8 December 2024)
- ML20205D176 + (00:01:38, 8 December 2024)
- ML20205D171 + (00:01:42, 8 December 2024)
- ML20205D166 + (00:01:43, 8 December 2024)
- ML20205D165 + (00:01:43, 8 December 2024)
- ML20205D160 + (00:01:44, 8 December 2024)
- ML20205D157 + (00:01:46, 8 December 2024)
- ML20205D154 + (00:01:47, 8 December 2024)
- ML20205D150 + (00:01:48, 8 December 2024)
- ML20205D151 + (00:01:48, 8 December 2024)
- ML20205D149 + (00:01:49, 8 December 2024)
- ML20205D145 + (00:01:50, 8 December 2024)
- ML20205D140 + (00:01:51, 8 December 2024)
- ML20205D139 + (00:01:51, 8 December 2024)
- ML20205D137 + (00:01:52, 8 December 2024)
- ML20205D133 + (00:01:53, 8 December 2024)
- ML20205D134 + (00:01:53, 8 December 2024)
- ML20205D132 + (00:01:54, 8 December 2024)
- ML20205D131 + (00:01:56, 8 December 2024)
- ML20205D128 + (00:01:57, 8 December 2024)
- ML20205D127 + (00:01:57, 8 December 2024)
- 05000265/LER-1985-018-05, :on 850826,during Low Condenser Vacuum Calibr, Pressure Switches PS-2-503A & PS-2-503C Setpoints Drifted to 20.8 & 19.4 Inches Hydrogen Gas Vacuum,Respectively.Caused by Instrument Setpoint Drift.Switches Recalibr + (00:01:59, 8 December 2024)
- 05000387/LER-1985-027, :on 850809,offgas Pretreatment Radiation Monitors Declared Inoperable.Caused by Determination That Tech Spec 4.3.7.11-1.4 Surveillance Requirement Not Met.New Surveillance Procedures Prepared + (00:02:01, 8 December 2024)
- ML20205D119 + (00:02:02, 8 December 2024)
- ML20205D118 + (00:02:03, 8 December 2024)
- ML20205D113 + (00:02:04, 8 December 2024)
- ML20205D116 + (00:02:04, 8 December 2024)
- ML20205D112 + (00:02:05, 8 December 2024)
- 05000296/LER-1985-022-02, :on 850823,containment Isolation Occurred During Performance of Surveillance Instruction on Reactor Bldg Exhaust Radiation Monitor.Caused by Removal of Temporary Jumper.Isolation Reset + (00:02:07, 8 December 2024)
- ML20205D109 + (00:02:08, 8 December 2024)
- ML20205D102 + (00:02:13, 8 December 2024)
- ML20205D100 + (00:02:14, 8 December 2024)
- ML20205D097 + (00:02:15, 8 December 2024)
- IR 05000285/1988031 + (00:02:17, 8 December 2024)
- ML20205D095 + (00:02:18, 8 December 2024)
- ML20205D092 + (00:02:19, 8 December 2024)
- ML20205D089 + (00:02:20, 8 December 2024)
- ML20205D088 + (00:02:21, 8 December 2024)
- ML20205D086 + (00:02:22, 8 December 2024)
- ML20205D078 + (00:02:23, 8 December 2024)
- ML20205D077 + (00:02:24, 8 December 2024)
- ML20205D064 + (00:02:25, 8 December 2024)
- 05000413/LER-1987-008, :on 870204,discovered That Two Concrete Covers Over Two Nuclear Svc Water Sys Manways Not Installed & Could Not Be Found.Cause Undetermined.Temporary 2-inch Thick Steel Plates Installed Over Two Manway Openings + (00:02:27, 8 December 2024)
- B12463, Advises That Util Conducted Fuel Misloading Event Evaluation for Plant,In Response to NRC 860417 Request.Procedural Controls & Sys Equipment Configurations Will Prevent Assembly Loading Errors.No Errors Committed + (00:02:28, 8 December 2024)