E N.R.C. OPERATING DATA REPORT DOCKET NO.

50-316 DATE 6/16/86 COMPLETED BY CLIMER TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 2
2. Reporting Period MAY 86 l notes l
3. Licensed Thermal Power (MWt) 3411 l l
4. Name Plate Rating (Gross MWe) 1133 l l

S. Design Electrical Rating (Net MWe) 1100 l l

6. Maximum Dependable Capacity (GROSS MWe) 1100 l
7. Maximum Dependable Capacity (Net MWe) 1060 -----------------------

8.

If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons

9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions. If Any:

1 This Mo.

Yr. to Date Cumm.i

11. Hours in Reporting Period 744.0 3623.0 73751.0
12. No. of Hrs. Reactor Was Critical 0.0 1352.6 50381.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 0.0 1272.5 49126.1
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 0 3404597 154675207
17. Gross Elect. Energy Gen. (MWH) 0 1097780 50784370
18. Het Elect. Energy Gen. (MWH) 0 1053472 48954840
19. Unit Service Factor 0.0 35.1 68.9
20. Unit Availability Factor 0.0 35.1 68.9
21. Unit Capacity Factor (MDC Net) 0.0 27.4 64.8
22. Unit Capacity Factor (DER Net) 0.0 26.4 63.4
23. Unit Forced Outage Rate 0.0 9.9 15.7 l
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):

I

25. If Shut Down At End of Report Period, Estimated Date of Startup:

Unit shut down for refuelinc.exoected startuo 6/25/86

26. Units in Test Status (Prior to Commercial Operation):

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l

[

6608130286 860531 l

PDR ADOCK 05000316 R

pop A

l AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

50-316 UNIT TWO DATE 6/18/86 COMPLETED BY CLIHER TELEPHONE 616-465-5901 MONTH MAY 86 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 1

0 17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 O

22 0

s 7

0 23 0

1 8

0 24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

i i

I i

l

e 50-316 1

IMICKE1 NO.

IINITSIMillWlWNS ANitPOWEM NEIMNTIONS LINII NAME D.C. Cook, Unit 2 DATE 6-14-86 May, 1986 CtlMPI ETEll hY B. A. Svensson NEFORT WINill IER.EriklNE 616/465-5901 4

i i

l g

m

=

licusce En,,

g*1, y3

'k j jfj i

Cause A Cenectelve g

N...

Dase g

is g

.c g oc livent g?

g3 Atseine to g'

Psevens Necausence fI E-j ;y, g Herius e in 6 e-6 172 860228' S

744 B&C 1

N.A.

ZZ ZZZZZZ The Unit was removed from service for the Cycle 5-6 Refueling Outage.

l All refueling related activities have been completed and the Unit is ready for RCS heatup and startup testing. The estimated return to service date is June 25, 1986.

i 1

\\

i i

1 l

1, l

l l

l 2

3 4

j I:: 17 uted Iteason:

Meehnit:

Enleetill G Instsut-si.nes i

S. Llecilideal A linguapencas Fasluesilsplain)

I 44 annal fus Pscpasasisme of Data l

N Maisesenence ci Test 2 Manual Scians.

linsey Sleeces fin Ikensec l

C Refueling 3 Aneuenasoc &saan.

Evene Negaws ll I'H) l'ile INIINI G-L Il Regislas wy N.senicaisme

-l Oelece liimplaint plioll l' Opciasos Isaining & Ikense I masse 6seasiime 12 Aelneenessoaseve 5

G Opceateissal Leeine Ilisplainen l%luliit 1 Sanee Sinusie l'8/11)

II Oelses Ilimplaine1

[

DockCt NJ.:

50-316 Unit Nam 3:

D.C. Cook Unit 2 Completed By:

A.S. Puplis Telephone:

(616) 465-5901 Date:

June 12, 1986 Page:

1 of 2 MONTHLY OPERATING ACTIVITIES - MAY, 1986 HIGHLIGHTS:

The reporting period began with Reactor Coolant System (RCS) in Mode 6 at 86*F with the core fully unloaded.

Reloading the core began on 5-6-86 and was completed on 5-9-86.

Forty nine 10 year In Service Inspection hydrostatic tests were completed during this outage.

The reporting period ended with the reactor coolant system in Mode 5 and the RCS temperature at 172*F.

SUMMARY

5-02-86 At 1635 reflooding of the reactor cavity to refueling level began.

At 1646 blackout testing of Train "B" began.

The blackout testing was completed about 1500 on 5-5-86.

5-6-86 At 0635 the " Unusual Event" which was declared at 0802 hours0.00928 days <br />0.223 hours <br />0.00133 weeks <br />3.05161e-4 months <br /> on 4-8-86 and was the result of removing 2AB Emergency Diesel Generator from service coincident with the 2CD Emergency Diesel Generator was terminated when 2AB Emergency Diesel Generator was declared operable.

At 1209 fuel movement began.

5-7-86 At 2109 core alterations were started.

5-9-86 At 0046 the core load was completed.

At 1507 the upper internals were set.

5-10-86 At 2155 the head was set.

5-11-86 At 0435 the RCS was drained to 8" above half loop.

At 1025 the breaker to the Engineered Safeguards Features Ventilation Fan tripped due to a smoldering fire in the cable tray.

5-14-86 At 0535 Mode 5 was entered.

At 0546 a draindown of the RCS to half loop was begun.

Half loop was reached at 0646.

DockOt No.:

50-316 Unit Nam 3:

D.C. Cook Unit 2 Completed By:

A.S. Puplis Telephone:

(616) 465-5901 Date:

June 12, 1986 Page:

2 of 2 1

5-20-86 At 2305 RCS pressure was raised to about 40 psig to begin pressurizer heatup.

5-23-86 At 1515, a bubble was drawn in the pressurizer.

The pressurizer heatup was stopped at 1615 with 300'F and 50 psig in the pressurizer.

5-24-86 At 1146 a pressurizer heatup began to raise RCS pressure to 350 psig.

Pressurizer pressure reached 350 psig at 1638.

5-27-86 At 0829 cooldown and depressurization of pressurizer was started.

At 1626 Train "A" blackout testing was commenced.

5-29-86 At 1645 a cooldown of the reactor coolant system was commenced to 145'F for Inservice Inspecion Testing.

5-29-86 At 1830 2 CD Emergency Diesel Generator was de-clared operable.

DOCKET NO.

50 - 316 UNIT NAME D. C. Cook - Unit No. 2 DATE 6-13-86 COMPLETED BY B. A. Svensson TELEPHONE (616) 465-5901 PAGE 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE MAY, 1986 M-1 No. 3 Rear Cylindar on Unit 2 AB Diesel Generator stopped firing.

Replaced injector and inlet line.

Engine tested satisfactorily.

M-2 The inboard pump bearing on the Unit 2 AB Diesel was leaking. The.

mechanical seal was replaced and tested satisfactorily.

M-3 2-CMO-429, Component Cooling Water return from Residual. Heat Ex-changers was tripping thermal overloads in its breaker. The motor was replaced and the valve tested satisfactorily.

M-4 2-NRV-212, Power Operated Steam Dump Valve for No. 21 Steam Gen-erator Stop Valve was leaking by.

Replaced cage and seat ring.

Cut new seating surface on the plug.

Installed new gaskets and packing. The valve tested satisfactorily.

M-5 NRV-164, Pressurizer Spray Control Valve had a body-to-bonnet leak.

Installed new internals and re-assembled with new gaskets and studs.

The valve tested satisfactorily.

C&I-1 ASCO solenoid valves for containment ventilation system isolation valves WCR-906 -925 and -933 allow supply air to bleed continuously when valve is in the closed position.

The ASCO solenoid valve was rebuilt and proper valve operation was verified.

C&I-2 NLP-152 Pressurizer Level Transmitter Channel 2 has a leak from between seal on bellows.

Repaired o-rings and backup ring on transmitter.

C&I-3 The ASCO solenoid valve for WCR-907 is continuously venting and blowing air with valve in the closed position.

Rebuilt ASCO solenoid valve and verified proper valve operation.

C&I-4 The electronic speed tachometer on the CD diesel generator cannot be adjusted to 514 RPM.

Found electronic tachometer circuitry to be defective. Replaced electronic tachometer, calibrated electronic tachometer per procedure, returned to service and verified proper operation.

i

_^

ystem lMNK0]MMlNN1MCTRIC30MNMY Donald C. Cook Nuclear Plant P.O. Som 458, Brutgman, Mchupan 49106 June 13, 1986 Director, Office Of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear plant Unit 2 Technical Specification 6.9.1.6, the attached Monthly Operating Report for the Month of May, 1986 is submitted.

Sincerely, W. G. Smith, W.

W Jr Plant Manager WGStab Attachments cc J. E. Dolan M. P. Alexich R. W. Jurgensen NRC Region III B. L. Jorgensen R. O. Bruggee R. C. Callen S. J. Hierzwa F. S. Van Pelt, Jr.

P. D. Rennix D. R. Hahn Z.

Cordero J. J. Markowsky J. F. Stietzel PNSRC File INPO Records Center A!!I Nuclear Engineering Department d

v h

\\'