NRC MONTHLY OPERATING REPORT DOCKET-NO.
QQ_ Egg UNIT NAME PMNQS-1 DATE 9229ftlA6 COMPLETED BY Jaku_dMll TELEPHONE
- 93-9)g-DJ99 5n.4s_bD32 92GBB.H B9_BIBBlk 1.
Unit Name: P gle _Y,gr d.g_N.gqltat _Qgogng({ng _Qtat.Lqns._QQ Lt _l, 2.
Report ing Period Mgy_Liqq 3.
Licensed Thermal Power (MWt): Jgg9 4.
Nameplate Rating (Gross MWe): J393 5.
Design Electrical Rating (Net MWe):
Jggj 6.
Maximum Dependable Capacity (Gross MWe): 1293 7.
Max imum Dependable Capacity (Net.MWm):
1831 8.
If Changes Occur In Capacity Ratings (It een Number 3 Through 7)
Since Last Re port, Give Reasons:
9.
Power Level to Which Restricted, If Any (Net MWe):
_NQN(_________
19.
Reasons For Restrictions, If Anyt This Month Yr._to-Date Cumulative 11.
Hours in Reporting Period
.,___143__
___SE}E____
___SU3S___
12.
Number of Hours Reactor was Critical
____RRR___
____lii____
____Iti___
13.
Reactor Reserve Shutdown Hours
____JR ___
____Jt_____
____Jt____
14.
Hours Generator On-Line
_ __ _l@.isS _
__ _I@.ltS _ _
__ 13 ltS--
15.
Unit Reserve Shutdown Hours
_____t____
_____R_____
____Jt____
16.
Gross Thermal Energy Generated (MWH)
._Q11s.O_ti_
_Rs.6t%i.49.i_
_Rs.6@.1 Ati 17.
Gross Electrical Energy Generated (MWH)
._Rf.4_s.390__
_ _R%3s.It%_
___%14s.ZR9.
10.
Net Electrical Energy Generated (MWH)
__LZRull2.
___RLiu9il_
___RL&L21L 19.
Unit Service Factor
.._Riul6.n_
. __ES Aln_
____R%sAll 20.
Unit Availability Factor
___Ris.14%
____R4 Aln.
____R%slln 21.
Unit Capacity Factor (Using MDC Net)
__ _ lgs,21% _
.,_ __RQ s. ZEE _
____RQs.1Q1 22.
Unit Capacity Factor (Using DER Net)
___lQs.2EE,
___.AQs.1QE_
____RQs.1qi 23.
Unit Forced Outage Rate
_____R____
_____R_____
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
35.
If Shutdown At End of Report Period, Estimated Date of Startups 26.
Units in Test Status (Prior To Commercial Operat ion) :
Forecast Achieved INITIAL CRITICALITY
__D/jD__
_D/SD/DD_
INITIAL ELECTRICITY
__bl#D__
_hlj!/SD_-
COMMERCIAL OPERATION
_jjl#D__
_#233/S5_
PDR ADOCK 05000528 M*,,, Ebd W60W130288 860531 R
./
4 a
.P s
t./
AVERAGE DAILY UNIT POWER LEVEL i
DOCKET NO.
QQ-QRQ UNIT ________P_YN_QE_L________
DATE=________0_%/_M/_& _______
COMPLETED BY,J _(s Idgli______
TELEPHONE E(R-11g-11tt Exts_65N L90tlRI:
May 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DRILY POWER LEVEL 1
____________9_____________
17 _____.___.____9_____________
e ________ ___9_______
is ___________9______._______
3
_______.____.9_________..
19 ____________9_____________
4
____________9L____________
ee ____________9_____________
5 _____
____9_____________
21____________9_____________.
s _________ __9_____
e2 _______._____9_____________
7
_____________0___________..
23 ____________9_____________
a
____________9_____________
24 ____________53____________
9 ______ _____9 e5 ___________526____________
1e ____________9__-__________
es _________11911__________-_
11 ____ ____ __9____
2 7 _ _ __ _ ____112h2__ ___ _ _ ___ _-.
Le _.-__ _______9__
28 _________112h2____________
13 ____________9 e9 __ ______112hh____________
14 ____________9_____________
3e _________11g33_____.______
15 _______ ____9____________..
31 _________11339____________
i s _ _ _ _ _ _ _ _ _ _ _ _ _e _ _.._ _ _ _ _ _ _ _ _ _
=
/
REFUELING INFORMATION DOCKET NO.
5_( _Q.RR_____ _
UNIT py_Ngg-J______
DATE 95/96/S5_____
COMPLETED BY J2Mz_ Bull ___
TELEPHONE
- 33-2_32-99_
Ey31_by3}____ 1. Sched ul ed date for next refueling shutdown. 03/13/87 2. Scheduled date for restart following refueling. 04/19/87 3. Will refueling or resumption or operation thereafter require a Technical Specification change or other license amendment? Not Yet Determined What will these be? Not Yet Determined 4. Scheduled date for submitting proposed licensing cct ion and supporting information. Not Yet Determined 5. Important Licensing considerat ions associated with refueling,
- e. g.
new or different' fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures. Not Ytt Determined 6. The number of fuel assemblies. l a) In the core. _ Ri1 b) In the spent fuel storage pool. ______0______ 7. ciceissed spent fuel storage capacity. ___JJ39___ ( Intended change in spent fuel storage capacity. ___ Bpn et _,_ i 8. Projected-date of last refueling that can be discharged to spent fuel storage pool assuming present capacity. i 2002 ' (w/ annual reloads and full coro discharge capability). l l l f I I w.
0.g.. Tr d
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH J DOCKET NO. 50-Dgj__ _ __ UNIT _PybijS-1. DATE _05/_06136_____ COMPLETED BY J2Mz_ByJJ____
- 92-932--}}09_
3 TELEPHONE ~ Ex.ts_b523____ 05/01 0000 plant in Mode 5 - Continuing Plant. Outage. 05/17 0512 Entered Mode 4 05/18 1901 Ent ered Mode 3 05/23 1359 Reactor Critical - Entered Mode 2 05/23 164h Entered Mode 1 05/23 2136 Synchronized Main Generator to Grid 05/23 2306 Main Turbine tr ipped on high MSR level 05/24 0552 Synchronized Main Generator to Grid 05/24 ~ 1057 - Trip Main Turbine in preparat ion for valve t ightness and overspeed tests. 05/24 1418 Synchroniz ed Main Generator to Grid 05/24 1000 Cornmence power increase to 60% power 05/25. 2005 React er at 60% power 05/26 1800 Stabili zed power at 92% 05/26 0157 Reactor at 100% power 05/31' 2001 Reactor power at 99. 1 91309 MWe
. Q DOCKET nd, j n W ~C ' UNIT SHUTDOWNS AND POWER REDUCTlDNS UNIT NAHE PVNGS-I DAT E ~~ b-1 U-M0 I COMPLETED BY T 7 "II T[t. Erit 0NE ' 4 D-MHO v.: e (A n a Nethod or Shutting Cause & Corrective Down System Component 1 Duration 2 - 3 f.ER 4 5 Action to No. Date Type litours) flesson Rosctor No. Code Code Prevent pecurrence 2 (Cont.) 5-1-86 S 542 B 4 Plant Outage. i = 1 i 4 1 2 3 la F= fo rce d Reason; Method: Exhibit r - Instructions S-Schoduled A-Eauipment failuro (Explain) 1-Hanual for Prnparation of Data D-Haintenance or Test 2-Hantial Scram. Entry Sheets for Licensee C-ncrueling 3-Asitoma tic Scram. Event Report (LER) file D-negula tory ncstriction ts-continisa tion f rom-(Nun [C 0161) E-Ono ra tor t ra ining h t.lcense Examina tion Previous Month I-Administrativo 5-neduction of 207. 5 or Creator in the Exhibit H-Seme Source C-Op o ra t iona l Error (Explain) Past 2ta flours H-Other (Explain) 9-Other ( Exple in) e n e.n.,
7* c)'f)f;;!v Arizona Nuclear Power Project P.o. BOX 52034 e PHOENIX, ARIZONA 85072-2034 June 13, 1986 ANPP-36930-EVB/PGN/rw/98.05 Mr. Ronald M. Scroggins, Director Office of Resource Fbnagement U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS) Unit 1 Docket No. STN 50-528 (License NPF-41) May Monthly Operating Report File: 86-024-404
Dear Mr. Scroggins:
Attached please find the May, 1986, Monthly Operating Report prepared and sub-mitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Unit 1 Operating License. By copy of this letter we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V office. If you have any questions, please contact me. Very truly yours, b E. E. Van Brunt, Jr. Executive Vice President Project Director EEVB/PGN/rw Attachment cc: J. B. Martin (all w/a) R. P. Zimmerman E. A. Licitra A. C. Gehr INPO Records Center \\'}}