Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-17-175, Response to Request for Additional Information Related to License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System + (20:28:45, 7 January 2025)
- ML17325B653 + (20:28:47, 7 January 2025)
- ML17325B650 + (20:28:48, 7 January 2025)
- ML17325B644 + (20:28:49, 7 January 2025)
- ML17325B643 + (20:28:50, 7 January 2025)
- 05000315/LER-1999-013, :on 990327,safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Have Led to ECCS Pump Failure.Caused by Inadequate Original Design Application of Si.Throttle Valves Will Be Developed + (20:28:52, 7 January 2025)
- IR 05000315/1999006 + (20:28:54, 7 January 2025)
- ML17325B637 + (20:28:56, 7 January 2025)
- ML17325B635 + (20:28:56, 7 January 2025)
- ML17325B633 + (20:28:57, 7 January 2025)
- ML17325B631 + (20:28:58, 7 January 2025)
- ML17325B630 + (20:28:59, 7 January 2025)
- ML17325B628 + (20:29:03, 7 January 2025)
- ML17325B618 + (20:29:04, 7 January 2025)
- IR 05000315/1999009 + (20:29:25, 7 January 2025)
- ML17325B613 + (20:29:28, 7 January 2025)
- ML17325B614 + (20:29:28, 7 January 2025)
- ML17325B611 + (20:29:29, 7 January 2025)
- IR 05000315/1999011 + (20:29:31, 7 January 2025)
- ML17325B607 + (20:29:32, 7 January 2025)
- ML17325B606 + (20:29:37, 7 January 2025)
- ML17325B603 + (20:29:41, 7 January 2025)
- ML17325B604 + (20:29:41, 7 January 2025)
- ML17325B602 + (20:29:43, 7 January 2025)
- 05000315/LER-1999-012, :on 990420,concluded That Auxiliary Bldg ESF Ventilation Sys Not Capable of Maintaining ESF Room Temps post-accident.Caused by Inadequate Control of Sys Design Inputs.Comprehensive Action Plan Being Developed + (20:29:44, 7 January 2025)
- BSEP 17-0089, Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion + (20:29:45, 7 January 2025)
- IR 05000315/1999004 + (20:30:10, 7 January 2025)
- ML17325B592 + (20:30:12, 7 January 2025)
- ML17325B591 + (20:30:13, 7 January 2025)
- ML17325B590 + (20:30:15, 7 January 2025)
- ML17325B589 + (20:30:17, 7 January 2025)
- ML17325B587 + (20:30:18, 7 January 2025)
- 05000316/LER-1999-002-01, :on 990415,discovered That TS 4.0.5 Requirements Were Not Met Due to Improperly Performed Test. Caused by Incorrect Interpretation of ASME Code.App J Testing Will Be Completed & Procedures Will Be Revised + (20:30:20, 7 January 2025)
- 05000316/LER-1999-002, Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed + (20:30:22, 7 January 2025)
- ML17325B583 + (20:30:24, 7 January 2025)
- ML17325B582 + (20:30:25, 7 January 2025)
- 05000315/LER-1999-011, :on 990407,air Sys for EDG Will Not Support Long Operability.Caused by Original Design Error.Temporary Mod to Supply Makeup Air Capability in Modes 5 & 6 Was Prepared + (20:30:27, 7 January 2025)
- 05000315/LER-1999-010, :on 990401,RCS Leak Detection Sys Sensitivity Not in Accordance with Design Requirements Occurred.Caused by Inadequate Original Design of Containment Sump Level. Evaluation Will Be Performed to Clearly Define Design + (20:30:30, 7 January 2025)
- JAFP-13-0074, Emergency Plan and Implementing Procedures + (20:30:32, 7 January 2025)
- ML17325B573 + (20:30:35, 7 January 2025)
- ML17325B571 + (20:30:36, 7 January 2025)
- ML17325B568 + (20:30:38, 7 January 2025)
- ML17325B567 + (20:30:39, 7 January 2025)
- ML17325B566 + (20:30:40, 7 January 2025)
- ML17325B563 + (20:30:41, 7 January 2025)
- IR 05000315/1999003 + (20:30:46, 7 January 2025)
- ML17325B560 + (20:30:47, 7 January 2025)
- TAC:MA2435 + (20:30:48, 7 January 2025)
- ML17325B559 + (20:30:49, 7 January 2025)
- 05000315/LER-1999-006, :on 990115,personnel Identified Discrepancy Between TS 3.9.7 Impact Energy Limit & Procedure 12 Ohp 4030.STP.046.Caused by Lack of Design Basis Control.Placed Procedure 12 Ohp 4030.STP.046 on Administrative Hold + (20:30:52, 7 January 2025)
- ML17325B555 + (20:30:55, 7 January 2025)