Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000315/LER-1999-017, :on 990625,noted That Improperly Installed Fuel Oil Return Relief Valve Rendered EDG Inoperable.Caused by Personnel Error.Fuel Oil Return Valve Was Replaced with Valve in Correct Orientation.With + (20:25:40, 7 January 2025)
- 05000315/LER-1998-014-03, Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed + (20:25:44, 7 January 2025)
- ML17326A062 + (20:25:47, 7 January 2025)
- ML17326A060 + (20:25:48, 7 January 2025)
- ML17326A057 + (20:25:50, 7 January 2025)
- ML17326A056 + (20:25:52, 7 January 2025)
- ML17326A055 + (20:25:54, 7 January 2025)
- ML17326A054 + (20:25:55, 7 January 2025)
- ML17326A053 + (20:25:57, 7 January 2025)
- ML17326A051 + (20:25:57, 7 January 2025)
- ML17326A050 + (20:25:58, 7 January 2025)
- 05000315/LER-1999-016, :on 990615,TS Requirements for Source Range Neutron Flux Monitors Not Met.Caused by Failure to Understand Design Basis of Plant.Procedures Revised.With + (20:26:00, 7 January 2025)
- IR 05000315/1999013 + (20:26:02, 7 January 2025)
- TAC:M98339 + (20:26:04, 7 January 2025)
- ML17326A045 + (20:26:04, 7 January 2025)
- ML17326A044 + (20:26:06, 7 January 2025)
- ML17326A043 + (20:26:06, 7 January 2025)
- ML17326A042 + (20:26:07, 7 January 2025)
- ML17326A040 + (20:26:08, 7 January 2025)
- ML17326A037 + (20:26:12, 7 January 2025)
- 05000315/LER-1999-015, :on 990408,RM Sys Was Not Tested IAW TS Srs. Caused by Inadequate Implementation of TS SRs in Plant Surveillance Procedures.Channel Functional Testing of RM Sys Unit Vent Effluent RMs Was Successfully Completed + (20:26:14, 7 January 2025)
- 05000315/LER-1999-004, :on 971030,failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed Was Noted.Caused by Ineffective Mgt of Tss.Chemistry Personnel Have Been Instructed on Requirement to Follow TS as Written + (20:26:17, 7 January 2025)
- 05000315/LER-1999-004-01, Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed + (20:26:19, 7 January 2025)
- ML17326A029 + (20:26:20, 7 January 2025)
- ML17326A028 + (20:26:22, 7 January 2025)
- ML17326A027 + (20:26:23, 7 January 2025)
- ML17326A025 + (20:26:24, 7 January 2025)
- ML17326A024 + (20:26:24, 7 January 2025)
- PNO-III-99-033, on 990625,American Electric Power Co Announced Schedule for Restarting DC Cook Nuclear Power Station.Unit 2 Lead Unit Is Scheduled for Restart in Apr 2000 & Unit 1 Is Scheduled for Restart in Sept 2000 + (20:26:30, 7 January 2025)
- IR 05000315/1999012 + (20:26:33, 7 January 2025)
- ML17326A019 + (20:26:35, 7 January 2025)
- IR 05000315/1999014 + (20:26:38, 7 January 2025)
- ML17326A016 + (20:26:42, 7 January 2025)
- 05000315/LER-1999-014, :on 990521,determined That Boron Injection Tank Manway Bolts Were Not Included in ISI Program,Creating Missed Exam for Previous ISI Interval.Caused by Programmatic Weakness.Isi Program & Associated ISI Database Modified + (20:26:49, 7 January 2025)
- ML17326A014 + (20:26:54, 7 January 2025)
- ML17326A011 + (20:27:06, 7 January 2025)
- ML17326A008 + (20:27:14, 7 January 2025)
- ML17326A007 + (20:27:17, 7 January 2025)
- ML17326A006 + (20:27:18, 7 January 2025)
- ML17326A003 + (20:27:18, 7 January 2025)
- ML17326A000 + (20:27:19, 7 January 2025)
- ML17325B800 + (20:27:20, 7 January 2025)
- ML17325B799 + (20:27:21, 7 January 2025)
- ML17325B796 + (20:27:22, 7 January 2025)
- IR 05000255/1987001 + (20:27:46, 7 January 2025)
- ML17325B793 + (20:27:47, 7 January 2025)
- ML17325B790 + (20:27:49, 7 January 2025)
- 0CAN078705, Responds to Violations Noted in Insp Repts 50-313/87-15 & 50-368/87-15.Corrective Actions:Bolts Cleaned,Nuts Tightened & Torqued & Operability Assessment Performed for Seismic Support.Repairs Completed 870507 + (20:27:53, 7 January 2025)
- ML17325B781 + (20:27:58, 7 January 2025)
- ML17325B765 + (20:27:59, 7 January 2025)
- ML17325B762 + (20:28:00, 7 January 2025)
- ML17325B742 + (20:28:01, 7 January 2025)