Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17345A613 + (16:36:58, 7 January 2025)
- L-88-549, Forwards Summary of mgt-on-shift Weekly Rept for Wk of 881209 & Plant Supervisor Nuclear Shift Repts,Per NRC 871019 Order + (16:37:00, 7 January 2025)
- ML17345A610 + (16:37:02, 7 January 2025)
- L-88-533, Forwards Turkey Point Unit 4 Flux Map Thimble Tube Eddy Current Test Rept for NRC Bulletin 88-009 + (16:37:03, 7 January 2025)
- L-88-506, Requests NRC Approval to Terminate mgt-on-shift Oversight Program & Reporting Requirements as Confirmed by NRC Order. Steps Taken to Strengthen Performance,Including Addition of Experienced Plant Manager Noted + (16:37:06, 7 January 2025)
- ML17345A604 + (16:37:09, 7 January 2025)
- L-88-540, Responds to Violations Noted in Insp Repts 50-250/88-28 & 50-251/88-28.Corrective Actions:Checker of Calculation Retrained in Application of Design Calculation Procedure Edpi 4.37-10 & Bechtel Personnel Readvised + (16:37:10, 7 January 2025)
- ML17345A602 + (16:37:12, 7 January 2025)
- L-88-535, Special Rept:Notifies of Three Fire Protection Impairments Incurred in Excess of Tech Spec Permitted Time Limits.On 881114,fire Protection Impairment 2125 Issued for Breach of Penetration 054-H001 to Provide Access to Repair Hanger + (16:37:13, 7 January 2025)
- L-88-525, Forwards Summary of mgt-on-shift Weekly Repts.Plant supervisor-nuclear Shift Repts Also Encl + (16:37:16, 7 January 2025)
- L-88-531, Forwards Nov 1988 Progress Summary of Select Sys Assessment, Per NRC Order + (16:37:21, 7 January 2025)
- ML17345A598 + (16:37:25, 7 January 2025)
- ML17345A597 + (16:37:26, 7 January 2025)
- ML17345A596 + (16:37:27, 7 January 2025)
- ML17345A594 + (16:37:28, 7 January 2025)
- L-88-536, Responds to Violations Noted in Insp Repts 50-250/88-30 & 50-251/88-30.Corrective Actions:Charging Pump Started & Line Cleared & Procedure 3/4-OP-201 Revised to Add Infrequent Operation to Raise Reactor Cavity Level + (16:37:29, 7 January 2025)
- ML17345A592 + (16:37:32, 7 January 2025)
- L-88-511, Application for Amends to Licenses DPR-31 & DPR-41, Separating Current Requirements for Electrical Sys Into Three Subgroups & Add More Restrictive Limiting Conditions for Operation for Diesel Generator Operation.Fee Paid + (16:37:33, 7 January 2025)
- L-88-529, Forwards Financial Disclosure Info,Including 1987 Annual 10-K,Sept 1988 10-Q & Util Statement of Internal Cash Flow Excluding Retained Earnings for 12 Months Ending Sept 1989, Per 10CFR140.21 & Reg Guide 9.4 + (16:37:37, 7 January 2025)
- ML17345A588 + (16:37:40, 7 January 2025)
- ML17345A587 + (16:37:41, 7 January 2025)
- ML17345A585 + (16:37:43, 7 January 2025)
- L-88-522, Forwards Summary of mgt-on-shift Weekly Rept & Plant supervisor-nuclear Shift Rept for Wk Starting 881125 + (16:37:44, 7 January 2025)
- ML17345A583 + (16:37:45, 7 January 2025)
- ML17345A582 + (16:37:47, 7 January 2025)
- L-88-524, Forwards Monthly Operating Status Repts for Nov 1988 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2 & Corrected Unit Shutdown & Power Reductions Rept for Turkey Point Unit 3 for Oct 1988 + (16:37:48, 7 January 2025)
- IR 05000250/1988035 + (16:37:51, 7 January 2025)
- ML17345A577 + (16:37:52, 7 January 2025)
- L-88-514, Forwards mgt-on-shift Weekly Rept for Wk Starting 881118,per Commission 871019 Order + (16:37:53, 7 January 2025)
- L-88-521, Clarifies 881202 Discussions W/Nrc Re Drawing Update Activities & Provides Addl Details on Activities Undertaken to Assure Accuracy of Selected Drawings to Be Used in Control Room for Restart & Subsequent Operation of Unit 3 + (16:37:55, 7 January 2025)
- L-88-516, Advises That Steam Generator a Tube Plugged on 881122,per 881027-1115 Insp + (16:37:57, 7 January 2025)
- ML17345A573 + (16:38:03, 7 January 2025)
- TAC:67475 + (16:38:04, 7 January 2025)
- ML17345A572 + (16:38:05, 7 January 2025)
- L-88-520, Forwards Current Schedule for Completion of SPDS Items,Per NRC 881027 Request + (16:38:07, 7 January 2025)
- ML17345A569 + (16:38:10, 7 January 2025)
- ML17345A568 + (16:38:12, 7 January 2025)
- IR 05000250/1988033 + (16:38:15, 7 January 2025)
- ML17345A565 + (16:38:17, 7 January 2025)
- ML17345A564 + (16:38:18, 7 January 2025)
- ML17345A562 + (16:38:19, 7 January 2025)
- ML17345A560 + (16:38:21, 7 January 2025)
- ML17345A559 + (16:38:22, 7 January 2025)
- ML17345A558 + (16:38:24, 7 January 2025)
- ML17345A556 + (16:38:25, 7 January 2025)
- L-88-518, Provides Addl Info Re Drawing Update Program at Plant,Per 881114 Mgt Meeting.Small Bore Piping & Tubing on Selected safety-related & Important to Safety Sys Were Walked Down to Verify Functionality & Develop Isometrics + (16:38:26, 7 January 2025)
- L-88-509, Forwards mgt-on-shift Weekly Rept for Wk Starting 881111,per 871019 Order.Plant Supervisor Nuclear Shift Repts Also Encl + (16:38:28, 7 January 2025)
- ML17345A553 + (16:38:31, 7 January 2025)
- IR 05000250/1988029 + (16:38:35, 7 January 2025)
- ML17345A548 + (16:38:37, 7 January 2025)
- L-88-502, Forwards Select Sys Assessment Progress Summary for Oct 1988 + (16:38:44, 7 January 2025)