ML17345A577
| ML17345A577 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 12/05/1988 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Conway W FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17345A578 | List: |
| References | |
| NUDOCS 8812160140 | |
| Download: ML17345A577 (6) | |
See also: IR 05000250/1988035
Text
AC CELE RATED
DISaIBUTION
DE MONSTRION
SYSI'EM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8812160140
DOC.DATE: 88/12/05
NOTARIZED: NO
DOCKET
FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power
and Light
C
05000250
~
~
~
AUTH.NAME
AUTHOR AFFILIATION
ERDT,A.R..
Region
2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
CONWAY,W.F.
Florida Power
a Light Co.
SUBJECT:
Forwards
Insp Rept 50-250/88-35
on 881114-18.No violations
or deviations
noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR J
ENCL /
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD2-2
COPIES
LTTR ENCL
1
1
RECIPIENT
ID CODE/NAME
EDISONiG
COPIES
LTTR ENCL
1
1
INTERNAL: AEOD
NRR SHANKMANiS
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC/HDS2
RGN2
FILE
01
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
DEDRO
NRR/DLPQ/PEB
11
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
0
MB
RMAN J
L
02
1
1
1
1
1
1
2
2
1
1
1
1
1,
1
XTERNAL: LPDR
1
1
1
1
NRC
RESL MARTIN,D
1
1
1
1
NOXZ 'I0 ALL 'RZDS" RZCIPI1&IS:
PZEASE HELP US K) REDUCE HASTE!
CGNZACT 'IHE DOCUMEÃZ CONTROL DESK
RQCN Pl-37
(EZZ. 20079) m ELMBQXB RKR NAME EKH DIBTRIBUTICH
LIST8 HK DOCUMENTS YOU DGNiT NEED)
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
22
ENCL
22
i
DEC 06 1ggg
Docket No. 50-250
License
No.
orida Power and Light Company
~
~
~
~
ATTN:
Mr.
W.
F.
Conway
Senior Vice President - Nuclear
P.
0.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
NRC INSPECTION
REPORT
NO. 50-250/88-35
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
S.
E.
Sparks
on
November 14-18,
1988.
The inspection included
a review of
activities authorized for your Turkey Point facility.
At the conclusion of the
inspection,
the findings
were
discussed
with those
members
of your staff
identified in the enclosed
Inspection
Report.
Areas
examined
during the inspection
are identified in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
Within the
scope
of the inspection,
no violations or deviations
were identi-
fied.
In accordance
with Section 2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter, please
contact
us.
Sincerely,
Enclosure;
NRC Inspection
Report
cc w/encl;
(See
page 2)
Alan
. Herdt, Chief
Engineering
Branch
Division of Reactor Safety
40 8~~205
9
ADOCK 05000250
PNU
Florida Power and Light Company
c~ w/encl:
lA. S.
Odom, Vice President
~
~
~
urkey Point Nuclear Plant
.
E. Cross,
Plant Manager
turkey Point Nuclear Plant
M. Bladow, Plant iiA Superintendent
. A'rias, Jr.,
Regulatory
and Compliance
Supervisor
State of Florida
bcc w/encl:
. Edison, Project Manager,
Project
Directorate II-2, Division of Reactor
~
~
~
~
~
~
~
~
~
rojects,
C Resident
Inspector
DRS Technical Assistant
Document Control
Desk
R I ~
SSparks:ser
11/~o/88
RII
FJape" i
1P't /88
RI
i/I1-/88
i