ML17345A585

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-250/88-34 & 50-251/88-34 on 881031- 1104 & Notice of Violation
ML17345A585
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/15/1988
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Conway W
FLORIDA POWER & LIGHT CO.
Shared Package
ML17345A586 List:
References
NUDOCS 8812200161
Download: ML17345A585 (5)


See also: IR 05000250/1988034

Text

gg CEO~TED

D1

BUT10N

DEMONSTR4TJON

SYS1'EM

REGULATO

INFORMATION DISTRIBUTION

TEM (RIDS)

) ACCESSION NBR: 8812200161

DOC. DATE: 88/12/18

NOTARIZED: NO

DOCKET

FACIL!50-250 Turkey Point Plant, Unit 3, Florida Power and=Light

C

P50PP250

50-251 Turkey Point Plant, Unit 4, Florida Power

and Light C

05000251

AUTH.NAME

AUTHOR AFFILIATION

JULIAN,C.A.

Region

2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

CONWAY,W.F.

Florida Power

a Light Co.

SUBJECT:

Forwards

Insp Repts

50-250/88-34

a 50-251/88-34

on 881031-

1104

a notice of violation.

DISTRIBUTION CODE: IEOlD

COPIES

RECEIVED:LTR /

ENCL Q

SIZE: P7

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

. NOTES:

RECIPIENT

ID CODE/NAME

PD2-2

PD

INTERNAL: AEOD

NRR SHANKMAN,S

NRR/DIPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC/HDS2

RGN2

FILE

01

EXTERNAL: LPDR

NSIC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

EDISONEG

DEDRO

NRR/DLPQ/PEB

11

NRR/DOEA DIR ll

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

OE LIEBERMAN,J

RE

F L

02

NRC PDR

RESL MARTINID

.COPIES

LTTR ENCL

1

1

1

1

1,

1

1

1

2

2

1

1

1

1

-1

-1

1

I

1

1

NOIK 'IO ALL "RIDS" R1KIPIENIS:

PLEASE HELP US IO REDUCE WASTEl

CGNI'ACT 'IHE DOCUMEMI'ONTROL DESK

ROCN Pl-37

(EXT. 20079) K) XKiQQZATE ARK NAME PS'ISTRIBVZIQH

LISTS FOR DOCUMEZZS YOU DGNIT NEED)

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

22

ENCL

22

December

15,

1988

Docket Nos. 50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida

Power and Light Company

ATTN:

Nr.

W.

F.

Conway

Senior

Vice President

- Nuclear

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

Gentlemen:

SUBJECT:

NOTICE

OF VIOLATION

(NRC

INSPECTION

REPORT

NOS. 50-250/88-34

AND 50-251/88-34)

This refers

to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

K. Jury

on October

31 - November

4,

1988.

The inspection

included

a review of

activities authorized for your Turkey Point facility.

At the conclusion of the

inspection,

the findings

were

discussed

with those

members

of your staff

identified in the enclosed

Inspection

Report.

Areas

examined

during

the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews

with personnel,

and

observation

of

activities in progress.

The inspection

findings indicate that certain activities

appeared

to violate

NRC requirements.

The violation, references

to pertinent

requirements,

and

elements

to be included in your response

are described

in the enclosed

Notice

of Violation.

In accordance

with Section

2.790 of the

NRC's

Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosures

will be placed

in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter, please

contact

us.

Sincerely,

881220.0f 62 88k 2f 5

PDR

ADQCK 05000250

6

PNU

Enclosures:

1.

Notice of Viotion

2.

NRC Inspection

Report

cc:

(See

page

2)

(Original signed by'C.

A. Julian)

Caudle

A. Julian,

Chief

Operations

Branch

Division- of Reactor Safety

Florida Power and Light Company

December

15

1988

cc w/encl:-

J.

S.

Odom, Vice President

Turkey Point Nuclear Plant

'J.

E. Cross,

Plant Manager

Turkey Point Nuclear Plant

L.

W. Bladow, Plant gA.Superintendent

J. Arias, Jr., Regulatory

and Compliance

Supervisor

State of Florida

bcc w/encl:

G.

E. Edison, Project Manager,

Project

Directorate II-2, Division of Reactor

Projects,

NRR

NRC Resident Inspector

DRS Technical Assistant

R y)]

RGibbs:sh

12/7 /88

KJury

12/ 7 /88

RII

ABelisl e

12/ ( /88

V

12/$ /88

RII~(j

i)

CJul i an

12//Q/88