Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-89-176, Responds to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. NDE of Unit 4 Identified No Crack Indications.Nde of Unit 3 Will Be Completed During Cycle 12 Refueling,Currently Scheduled to Begin in Nov 1989 + (16:35:32, 7 January 2025)
- ML17345A658 + (16:35:36, 7 January 2025)
- ML17345A657 + (16:35:44, 7 January 2025)
- ML17345A656 + (16:35:45, 7 January 2025)
- ML17345A654 + (16:35:47, 7 January 2025)
- ML17345A651 + (16:35:47, 7 January 2025)
- ML17345A649 + (16:35:51, 7 January 2025)
- ML17345A647 + (16:35:53, 7 January 2025)
- L-89-143, Forwards Integrated Schedule Monthly Summary Rept for Mar 1989 + (16:35:54, 7 January 2025)
- L-89-153, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/89-06 & 50-251/89-06.Corrective Actions:Procedure OP 14004.1 Revised to Correct Applicable Step Numbers & Util Analyzing Clearance Order Process + (16:35:57, 7 January 2025)
- ML17345A643 + (16:36:00, 7 January 2025)
- 05000250/LER-1989-008, :on 890320,heat Trace Circuits 8A & 8B on Suction Lines of Boric Acid Transfer Pump Declared Out of Svc.Possibly Caused by Leaking Isolation Valve.Isolation Valve Disassembled for Insp + (16:36:02, 7 January 2025)
- SBK-L-17204, Response to Request for Additional Information Regarding License Amendment Request Related to Alkali-Silica Reaction (CAC No. MF8260; EPID L-2016-LLA-0007) + (16:36:05, 7 January 2025)
- L-89-141, Forwards Mar 1989 Progress Summary of Select Sys Assessment, Per NRC 860812 Order + (16:36:07, 7 January 2025)
- L-89-154, Special Rept:On 890312,16 & 27 Fire Protection Impairments Opened for Repairs & Not Returned to Functional Status within 7 Days,Per Tech Spec 3.14.5.b.Discrepancies Identified by Fire Door Surveillance Being Evaluated + (16:36:10, 7 January 2025)
- L-89-161, Special Rept:On 890322,condenser Air Ejector High Range Noble Gas Monitor Removed from Svc in Order to Performed Maint & Became Inoperable for Greater than 7 Days.Monitor Scheduled to Be Returned to Svc Prior to Restart of Unit + (16:36:12, 7 January 2025)
- 05000250/LER-1989-007, :on 890316,surveillance for Snubber Missed. Caused by Weakness in Snubber Testing Program.Snubber Removed & Functionally Tested & Replaced W/Spare Snubber.W/ + (16:36:16, 7 January 2025)
- ML17345A636 + (16:36:19, 7 January 2025)
- L-89-157, Provides Status of Implementation of TMI Action Plan Items for Plants,Per TE Murley 890414 Request + (16:36:21, 7 January 2025)
- IR 05000250/1989008 + (16:36:25, 7 January 2025)
- ML17345A632 + (16:36:27, 7 January 2025)
- L-89-012, Special Rept:Listed Fire Protection Sys Impairments Opened. Causes Include Leaching in Thermolag Insulation,Grout Void & Faulty Latching & Locking Mechanisms on Fire Doors.List of Impairments Open in Excess of Tech Spec Limits Encl + (16:36:28, 7 January 2025)
- IR 05000250/1988030 + (16:36:31, 7 January 2025)
- ML17345A629 + (16:36:33, 7 January 2025)
- IR 05000250/1988038 + (16:36:38, 7 January 2025)
- ML17345A626 + (16:36:40, 7 January 2025)
- ML17345A625 + (16:36:42, 7 January 2025)
- ML17345A624 + (16:36:43, 7 January 2025)
- ML17345A622 + (16:36:44, 7 January 2025)
- L-88-559, Responds to Generic Ltr 88-17, Loss of Dhr. Response for Programmed Enhancements for DHR Will Be Provided by 890202 + (16:36:45, 7 January 2025)
- 05000250/LER-1988-030, :on 881202,determined That Safety Injection Accumulator Level Tech Spec Limits Possibly Exceeded During Operation.Caused by Errors in Design Which Installed Transmitters.Transmitters Being Replaced + (16:36:49, 7 January 2025)
- L-88-558, Advises That Util Performing Flow Tests to Demonstrate Conditions Described in NRC Bulletin 88-008, Piping Connected to RCS Unlikely at Facilities.Util Will Decide What Addl Actions Needed by 890430 + (16:36:51, 7 January 2025)
- ML17345A618 + (16:36:51, 7 January 2025)
- L-88-553, Forwards mgt-on-shift Weekly Rept for Wk Beginning 881215, Per 871019 Order + (16:36:54, 7 January 2025)
- ML17345A615 + (16:36:56, 7 January 2025)
- ML17345A613 + (16:36:58, 7 January 2025)
- L-88-549, Forwards Summary of mgt-on-shift Weekly Rept for Wk of 881209 & Plant Supervisor Nuclear Shift Repts,Per NRC 871019 Order + (16:37:00, 7 January 2025)
- ML17345A610 + (16:37:02, 7 January 2025)
- L-88-533, Forwards Turkey Point Unit 4 Flux Map Thimble Tube Eddy Current Test Rept for NRC Bulletin 88-009 + (16:37:03, 7 January 2025)
- L-88-506, Requests NRC Approval to Terminate mgt-on-shift Oversight Program & Reporting Requirements as Confirmed by NRC Order. Steps Taken to Strengthen Performance,Including Addition of Experienced Plant Manager Noted + (16:37:06, 7 January 2025)
- ML17345A604 + (16:37:09, 7 January 2025)
- L-88-540, Responds to Violations Noted in Insp Repts 50-250/88-28 & 50-251/88-28.Corrective Actions:Checker of Calculation Retrained in Application of Design Calculation Procedure Edpi 4.37-10 & Bechtel Personnel Readvised + (16:37:10, 7 January 2025)
- ML17345A602 + (16:37:12, 7 January 2025)
- L-88-535, Special Rept:Notifies of Three Fire Protection Impairments Incurred in Excess of Tech Spec Permitted Time Limits.On 881114,fire Protection Impairment 2125 Issued for Breach of Penetration 054-H001 to Provide Access to Repair Hanger + (16:37:13, 7 January 2025)
- L-88-525, Forwards Summary of mgt-on-shift Weekly Repts.Plant supervisor-nuclear Shift Repts Also Encl + (16:37:16, 7 January 2025)
- L-88-531, Forwards Nov 1988 Progress Summary of Select Sys Assessment, Per NRC Order + (16:37:21, 7 January 2025)
- ML17345A598 + (16:37:25, 7 January 2025)
- ML17345A597 + (16:37:26, 7 January 2025)
- ML17345A596 + (16:37:27, 7 January 2025)
- ML17345A594 + (16:37:28, 7 January 2025)
- L-88-536, Responds to Violations Noted in Insp Repts 50-250/88-30 & 50-251/88-30.Corrective Actions:Charging Pump Started & Line Cleared & Procedure 3/4-OP-201 Revised to Add Infrequent Operation to Raise Reactor Cavity Level + (16:37:29, 7 January 2025)