Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-94-319, Forwards Util Scope & Objectives for 1995 Facility Annual EP Exercise + (13:51:13, 7 January 2025)
- L-94-293, Provides Update on Items Completed at Plant During 941003-1114 Cycle 15 Refueling Outage.Summarizes Regulatory Activities & Items of Regulatory Interest,For Which Action Taken During Refueling Outage + (13:51:15, 7 January 2025)
- L-94-317, Forwards Rev 28 to Radiological Emergency Plan. Attachment 1 Provides Summary of Plant Radiological Emergency Plan Rev 28 Changes + (13:51:16, 7 January 2025)
- 05000251/LER-1994-006-02, :on 941130,Unit 4 Tripped Automatically.Caused by Failure of Flexible Link Connection Between Main Generator B Phase Bus & Associated Isolated Phase Bus Bar. All Bolts on Flexible Link Checked + (13:51:19, 7 January 2025)
- L-94-313, Monthly Operating Repts for Nov 1994 for Turkey Point Units 3 & 4 + (13:51:21, 7 January 2025)
- ML17352A950 + (13:51:21, 7 January 2025)
- ML17352A947 + (13:51:24, 7 January 2025)
- ML17352A946 + (13:51:25, 7 January 2025)
- ML17352A940 + (13:51:26, 7 January 2025)
- ML17352A939 + (13:51:28, 7 January 2025)
- ML17352A938 + (13:51:29, 7 January 2025)
- ML17352A935 + (13:51:30, 7 January 2025)
- L-94-292, Forwards Plant Procedures & Training Material Provided for Preparation of Licensing Exams for Reactor Operator Group Xv & SRO Upgrade 94,scheduled for Week of 950227 + (13:51:31, 7 January 2025)
- L-94-279, Submits Commitments Re Containment Structural Reanalysis Meeting.Util Appreciated Opportunity to Meet W/Nrc Staff + (13:51:33, 7 January 2025)
- ML17352A930 + (13:51:35, 7 January 2025)
- IR 05000250/1994021 + (13:51:40, 7 January 2025)
- ML17352A920 + (13:51:41, 7 January 2025)
- IR 05000250/1994020 + (13:51:58, 7 January 2025)
- ML17352A911 + (13:52:00, 7 January 2025)
- TAC:M89934 + (13:52:01, 7 January 2025)
- ML17352A907 + (13:52:02, 7 January 2025)
- L-94-290, Forwards Rept of Unsatisfactory Performance Testing Incident.Rept Details Investigative Analysis of Unsatisfactory Blind Specimen Result,Including Cause & C/A Taken by Smithkline Beecham Clinical Lab + (13:52:03, 7 January 2025)
- L-94-289, Monthly Operating Repts for Oct 1994 for Turkey Points Units 3 & 4 + (13:52:05, 7 January 2025)
- ML17352A895 + (13:52:07, 7 January 2025)
- IR 05000250/1994019 + (13:52:11, 7 January 2025)
- ML17352A890 + (13:52:13, 7 January 2025)
- ML17352A889 + (13:52:15, 7 January 2025)
- ML17352A888 + (13:52:19, 7 January 2025)
- 05000250/LER-1994-005-03, :on 941103,design Defect in Safeguards Bus Sequencer Test Logic Places Both Units Outside Design Basis. Caused by 3A Sequencer Failed to Respond as Expected to Opposite Unit SI Signal + (13:52:21, 7 January 2025)
- 05000250/LER-1994-004-03, :on 941103,Unit 3 Outside Design Basis Due to Two of Three Required Safety Injection Pumps Inoperable. Control Switches for 3A & 3B Safety Injection Pumps Immediately Returned to Automatic + (13:52:23, 7 January 2025)
- L-94-264, Forwards Turkey Point Nuclear Plant,Simulator Certification Update 1, Per 10CFR55.45 + (13:52:24, 7 January 2025)
- ML17352A884 + (13:52:24, 7 January 2025)
- ML17352A881 + (13:52:27, 7 January 2025)
- ML17352A880 + (13:52:28, 7 January 2025)
- IR 05000250/1994099 + (13:52:30, 7 January 2025)
- ML17352A877 + (13:52:31, 7 January 2025)
- ML17352A875 + (13:52:32, 7 January 2025)
- IR 05000250/1994018 + (13:52:50, 7 January 2025)
- ML17352A872 + (13:52:52, 7 January 2025)
- ML17352A871 + (13:52:56, 7 January 2025)
- ML17352A870 + (13:52:57, 7 January 2025)
- ML17352A869 + (13:52:58, 7 January 2025)
- L-94-274, Forwards Proprietary Results of Investigation Into Concerns Through Nuclear Safety Speakout Program.Results Withheld + (13:52:59, 7 January 2025)
- ML17352A852 + (13:53:01, 7 January 2025)
- ML17352A851 + (13:53:02, 7 January 2025)
- ML17352A849 + (13:53:03, 7 January 2025)
- L-94-268, Forwards COLR for Turkey Point Units 3 & 4 + (13:53:04, 7 January 2025)
- ML17352A848 + (13:53:04, 7 January 2025)
- L-94-265, Provides Operator Licensing National Examination Schedule as Requested by Administrative Ltr 94-12 + (13:53:08, 7 January 2025)
- 05000251/LER-1994-005-02, :on 940924,Unit 4 Manually Tripped.Caused by Manual Actuation.Light Bulb & Socket Replaced + (13:53:12, 7 January 2025)
- 05000251/LER-1994-004-02, :on 940923,Unit 4 Tripped Automatically from Rated Power.Caused by Faulty Regulator Transistor.Faulty Backup Power Supply Replaced & Maint History for Power Supplies Reviewed + (13:53:14, 7 January 2025)