Text
gp,S REgy o~
Cy A.
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 October 27, 1994 go - Z.SO Mr. J.
H. Goldberg President - Nuclear Division Florida Power and Light Company P.O.
Box 14000 Juno
- Beach, Florida 33408-0420
SUBJECT:
INSERVICE TESTING PROGRAM AND RELIEF REQUESTS FOR PUMPS AND VALVES
- TURKEY POINT PLANT, UNITS 3 AND 4 (TAC NOS.
M88721 AND M88761)
Dear Mr. Goldberg:
We have, with technical assistance from Brookhaven National Laboratory (BNL),
reviewed the information concerning the Inservice Testing
( IST) program submitted by letter dated January 12, 1994, for the third 10-year interval at Turkey Point Units 3 and 4.
We adopt the evaluations and recommendations for granting relief or authorizing alternatives contained in the attached Technical Evaluation Report (TER) prepared by BNL, as reflected in the enclosed Safety Evaluation (SE).
Relief is granted from or alternatives are authorized to the testing requirements which have been determined to be impractical to perform, where compliance would result in a hardship without a compensating increase in
- safety, or where the proposed alternative testing provides an acceptable level of quality and safety.
A summary of NRC action is provided in Table 1 of the attached SE.
The IST program relief requests which are granted, authorized, or approved are acceptable for implementation provided the action items identified in Section 5 of the TER are addressed within one year of the date of the SE or by the end of the next refueling outage, whichever is later.
Additionally, the granting of relief is based upon the fulfillment of any commitments made in the basis for each relief request and the alternatives proposed.
Actions necessary to address relief requests, or portions of relief requests, that are denied are discussed in the SE and in Section 5 of the TER.
Program changes involving new or revised relief requests should be submitted to the NRC.
Programs changes that meet the positions in GL 89-04, Attachment 1,
may be implemented provided the guidance in GL 89-04, Section D, is followed.
Program changes that add or delete components from the IST program should be periodically provided to the NRC.
This requirement affects fewer than 10 respondents and, therefore, is not subject to Office of Management and Budget review under P.L.96-511.
0~0076 9411020i08 941027 PDR ADOCK 05000250 P
PDR Pl'
a If you have any questions about this matter, please contact R.
P.
Croteau at (301) 504-1475.
Sincerely, Docket Nos.
50-250 and 50-251
Enclosures:
As stated cc w/enclosures:
See next page (Original Signed By)
Mohan C. Thadani, Acting Director Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Distribution
~~ocketR.Q.'l.'e:~~
PUBLIC PDII-2 RF
<%L5&>
ACRS (10)
DVerelli, RII T.
Chang OGC Document Name G:~ITP88721. IST To receive a copy of this document, indicate in the box:
"C" =
C py without attachment enclosure "E" = Co y with attac nt enclo re No co y OFFICE LA:PDII-2:DRPE E,
PH:PDII-2:DRPE Q
~V
- DRPE NAME EDunnington DATE 1D/
/94 RCroteau C C.
1D/
/94 1D/I i /94 hadani P/
94 OFFICIAL RECORD COPY
Hr. J.
H. Goldberg Florida Power and Light Company CC:
Harold F. Reis, Esquire Newman and Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 Jack Shreve, Public Counsel Office of the Public Counsel c/o The Florida Legislature 111 West Madison Avenue, Room 812 Tallahassee, Florida 32399-1400 John T. Butler, Esquire
- Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Hr. Thomas F. Plunkett, Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 Joaquin Avino County Manager of Hetropolitan Dade County 111 NW 1st Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission P.O.
Box 1448 Homestead, Florida 33090 Hr. Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Tallahassee, Florida 32399-0700 Turkey Point Plant Units 3 and 4
Hr. Joe Hyers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 Hr.
H.
N. Paduano, Manager Licensing 5 Special Programs Florida Power and Light Company P.O.
Box 14000 Juno
- Beach, Florida 33408-0420 Mr. Edward J.
Weinkam Licensing Manager Turkey Point Nuclear Plant P.O.
Box 4332 Princeton, Florida 33032-4332