j,
~
I +lour I-v Z
REGULATORN 68HQFIN
IBRRFE!ATION SYSTEM (RIDS)
ACCESSION NBR:9412130025
DOC.DATE: 94/12/01
NOTARIZED: NO
SCIL:50-250 Turkey Point Plant, Unit 3, Florida Power
and Light C
50-251 Turkey Point Plant, Unit 4, Florida Power
and Light C
AUTH.NAME
AUTHOR AFFILIATION
BOGER,B.A.
Region
2 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
GOLDBERG,J.H.
Florida Power
& Light Co.
SUBJECT:
Forwards insp repts
50-250/94-23
& 50-251/94-23
on 941030-
1126
& notice of violation.Violation of concern
because
licensed operators
disabled automatic start function of two
high head safety injection pumps.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vio ation
esponse
NOTES:
DOCKET I
05000250
05000251
RECIPIENT
ID CODE/NAME
PD2-2
INTERNAL: AEOD/DEIB
AEOD/SPD/RRAB
DEDRO
NRR/DORS/OEAB
NRR/PMAS/IRCB-E
t
OE DIR
RGN2
FILE
01
EXTERNAL: LITCO BRYCE,J
H
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
CROTEAUrR
AEOD/SPD/RAB
AEOD/~
QEILE CENTER
02
NRR/DRCH/HHFB
NUDOCS-ABSTRACT
OGC/HDS3
NOAC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
iNOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE ~VASTE! CONTACTTHE DOCL'lifEYTCOYTROL
DESK, ROOii! P1-37 (EXT. 504-20S3
) TO ELIMIYATEYOUR i%AWE FROI!
DISTRIBUTIOYLISTS FOR DOCUN!EYTS YOU DOY'1 MEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
18
ENCL
18
,4 ~
December
1,
1994
EA 94-236
Florida Power
and Light Company
ATTN:
Mr. J.
H. Goldberg
President
- Nuclear Division
Nuclear Energy Department
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
SUBJECT:
(NRC
INSPECTION
REPORT
NOS. 50-250/94-23
and 50-251/94-23)
Gentlemen:
The enclosed
report documents
an inspection to assure
public health
and safety
conducted
by Mr. T.
P.
Johnson
and others of the resident staff on October
30
through
November 26,
1994.
The inspection
included
a review of activities
authorized for your Turkey Point facility.
At the conclusion of the
inspection,
the findings were discussed
with those
members of your staff
identified in the enclosed
Inspection
Report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted
of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
Based
on the results of this inspection,
certain of your activities
appeared
to be in violation of NRC requirements,
as specified in the enclosed
Notice of
Violation (Notice).
The violation is of concern
because
licensed
operators
disabled
the automatic start function of two high head safety injection pumps,
and this went undetected
in the control
room for over two hours.
The enclosed
Inspection
Report also identifies activities that violate
NRC requirements
that will not
be subject to enforcement
action because
the licensee's
efforts
in correcting the violation meet the criteria specified in Section VII.B(l) of
the "General
Statement of Policy and Procedure for NRC Enforcement Actions,"
10 CFR Part 2, Appendix
C (Enforcement Policy).
In addition, this report
identifies
an apparent violation associated
with a design deficiency in your
emergency
load sequencers.
You identified this condition
on November 3,
1994,
and subsequently
informed the
NRC.
We are considering this issue for
escalated
enforcement
in accordance
with the "General
Statement of Policy and
Procedure for NRC Enforcement Actions" (Enforcement Policy),
Appendix C.
Accordingly,
no Notice of Violation is presently
being issued for
this finding,
Please
be advised that the characterization
of this apparent
violation may change
as
a result of further
NRC review.
An enforcement
conference
to discuss
the apparent violation has
been
scheduled
t
for December
9,
1994.
The decision to hold an enforcement
conference
does not
mean that the
NRC has determined that
a violation has occurred or that
94i2i30025 94i20i
ADOCK 05000250
8
OFFICIAL COPY
I& ga
~ 4 V ~ ~3P
enforcement
action will be taken.
The purpose of this enforcement
conference
is to discuss
the apparent violation, its causes,
and its safety significance;
to provide you the opportunity to point out any errors in our Inspection
Report;
and to provide
an opportunity for you to present your proposed
corrective actions.
In addition, this is
an opportunity for you to provide
any information concerning your perspectives
on 1) the severity of the
violation; 2) the application of the factors that the
NRC considers
when it
determines
the amount of a civil penalty that
may be assessed
in accordance
with Section VI.B.2 of the Enforcement Policy;
and 3) any other application of
the Enforcement Policy to this case
including the exercise of discretion in
accordance
with Section VII.
You will be advised
by separate
correspondence
of the results of our deliberations
on this matter.
No response
regarding the
apparent violation is required at this time.
Although
10 CFR 2.201 requires
you to submit to this office, within 20 days of
your receipt of this Notice,
a written statement
of explanation,
we note that
the violation cited in the enclosed
Notice had
been corrected
as
documented
in
Licensee
Event Report
No. 50-250/94-004,
and those actions
were reviewed
during this inspection.
Therefore,
no response
with respect
to this matter is
required.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter
and its enclosures will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
Or'ig s'igned
'by Bruce 'A. Boger
Bruce A. Boger, Acting Director,
Division of Reactor Projects
Docket Nos.
50-250,
50-251
License
Nos.
EA 94-236
Enclosures:
1.
2.
NRC Inspection
Report
cc w/encls:
H.
N.
Paduano,
Manager
Licensing
5 Special
Programs
Florida Power
and Light Company
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
cc w/encls cont'd:
See
page
3
5
~
cc w/encls cont'd:
D.
E. Jernigan
Plant General
Manager
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami,
FL
33102
T.
F. Plunkett
Site Vice President
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami,
FL
33102
T.
V. Abbatiello
Site equality
Manager
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami,
FL
33102
E. J.
Weinkam
Licensing Manager
Turkey Point Nuclear Plant
P. 0.
Box 4332
Miami,
FL
33032-4332
Harold F. Reis,
Esq.
Newman
and Holtzinger,
P.C.
1615
L Street,
NW
D.
C.
20036
John T. Butler,
Esq.
Steel,
Hector and Davis
4000 Southeast
Financial
Center
Miami,
FL
33131-2398
Attorney General
Department of Legal Affairs
The Capitol
Tallahassee,
FL
32304
Bill Passetti
Office of Radiation Control
Department of Health
and
Rehabilitative Services
1317
Winewood Boulevard
Tallahassee,
FL
32399-0700
cc w/encls cont'd:
See
page
4
rvL
cc w/ encls cont'd:
Jack Shreve
Public Counsel
Office of the Public Counsel
c/o The Florida Legislature
111
West Nadison
Avenue,
Room 812
Tallahassee,
FL
32399-1400
Joaquin
Avino
County Hanager of Metropolitan
Dade County
111
NW 1st Street,
29th Floor
Hiami,
FL
33128
Joe Hyers, Director
Division of Emergency
Preparedness
Department of Community Affairs
&2740 Centerview Drive
Tallahassee,
FL
32399-2100
Distribution w encl:
R. Croteau,
K. Landis, RII
t
G. A. Hallstrom, RII
PUBLIC
Thomas
P.
Johnson
Senior Resident
Inspector
U.S. Nuclear Regulatory
Commission
P. 0.
Box 1448
Homestead,
FL
33090
SEND
TO
PDR?
Ye.
No
OFC
RII:DRP
NAME
RSchin
DATE
11~~/94
COPY?
Yes
No
RII:DRP
KLend Is
11
/94
Yes
No
Rll:EIC
BUr
11
/94
DOCUMENT NAME:
G:iTP9423
.
P
No
RI I:DRP
Dverrelli
11/ $>/94
Yes
Ho
/
/94
Yes