Ack Ltr,Dtd 940831,in Response to Request for Info Ltr,Dtd 940728,re Changes in Submittals That Appeared Inconsistent W/Emergency Std of 10CFR50.47(b) & 10CFR50,App E.Dose Limits for Emergency Workers Resolved
ML17352A888
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/31/1994
From: Cline W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
References
NUDOCS 9411210043
Download: ML17352A888 (7)


Text

October 31, 1994 Florida Power and Light Company ATTN:

Hr. J.

H. Goldberg President

- Nuclear Division P. 0.

Box 14000 Juno

Beach, FL 33408-0420 Gentlemen:

SUBJECT:

REVISIONS 26 AND 27 TO RADIOLOGICAL EHERGENCY PLAN FOR TURKEY POINT PLANT,, DOCKET NOS. 50-250 AND 50-251 Thank you for your response dated August 31, 1994 (L-94-221) to our letter of July 28, 1994, in which we requested additional information regarding certain changes in the subject submittals that appeared to be inconsistent with the emergency planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50.

We have evaluated your response and made the following determinations with respect to the two apparent inconsistencies delineated in the Enclosure to our previously referenced letter:

The issue regarding dose limits for licensee emergency workers is considered

resolved, contingent upon fulfillment of your commitment to revise your Plan as indicated in your response.

We request that appropriate modifications be provided to us in final form (i.e.,

as a

revision to your Plan) within 45 days of the date of this letter.

2.

We have not yet made a final determination regarding your use of the terms "total whole body dose" and "thyroid dose", respectively, as substitute terms for "total effective dose equivalent" and "thyroid committed dose equivalent".

The acceptability of this substitute nomenclature is currently under review by the NRC's Office of General Counsel (OGC).

We will inform you of our final determination on this matter once OGC issues its ruling (expected within approximately 60 days from the date of this letter).

E The NRC's acceptance of the other changes made in Revisions 26 and 27 does not embrace the content of the current revision (July 1994) of the State of Florida Notification Hessage Form for Nuclear Power Plants, which was not included in either of these revisions to your Plan.

(A previous edition of this form is exhibited as Table 4-2.)

We realize that changes to the content of this form are negotiated with the State of Florida as well as Florida Power Corporation.

We encourage you to continue working with those organizations to develop a form which is acceptable to all parties and, at the same time, is consistent with the NRC's regulatory guidance for reporting emergency information to State and local agencies.

In previous telephonic discussions between D. Hothena of your staff and members of my staff, we have communicated to you the details of a format that would acceptably address NRC requirements and guidance for reporting information on projected doses to State and local authorities.

This format includes integrated dose projections as well as 9'411210043 941031 PDR ADOCK 05000250 F

PDR

~ Q'f(

C,p,.

V

FPLL reporting terminology that would "bridge the gap" between Part 20 nomenclature and the terminology that the State desires to use.

We will formally review the changes to the State of Florida Notification Message Form when a revised version of the form is incorporated in your Plan.

Please be reminded that 10 CFR 50.54(q) requires that proposed changes which decrease the effectiveness of your Radiological Emergency Plan may not be implemented without application to and approval by the Commission.

However, changes may be made without Commission approval if-such changes do not decrease the effectiveness of the Plan, and the Plan, as changed, continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50. If a change is made without approval, you should furnish copies in accordance with 10 CFR 50.54(q).

Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of Appendix E to 10 CFR Part 50.

Should you have any questions regarding this letter, please contact Hr. Kenneth P. Barr of our staff on 404-331-0335.

Sincerely, William E. Cline, Chief Radiological Protection and Emergency Preparedness Branch Division of Radiation Safety and Safeguards Docket Nos.

50-250, 50-251 License Nos.

DPR-31, DPR-41 cc:

H. N. Paduano, Manager Licensing

5. Special Programs Florida Power and Light Company P. 0.

Box 14000 Juno

Beach, FL 33408-0420 cc:

L.

W. Pearce Plant General Manager Turkey Point Nuclear Plant P. 0.

Box 029100 Miami, FL 33102 T. F. Plunkett Site Vice President Turkey Point Nuclear Plant P. 0.

Box 029100 Miami, FL 33102 cc:

(cont'd on page 3)

FPRL cc:

(cont'd)

T. V. Abbatiello Site equality Manager Turkey Point Nuclear Plant P. 0.

Box 029100 Miami, FL 33102 E. J.

Weinkam Licensing Manager Turkey Point Nuclear Plant P. 0.

Box 4332

Miami, FL 33032-4332 Harold F. Reis, Esq.

Newman and Holtzinger, P.C.

1615 L Street, NW Washington, D. C.

20036 John T. Butler, Esq.

Steel, Hector and Davis 4000 Southeast Financial Center Miami, FL 33131-2398 Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 Jack Shreve Public Counsel Office of the Public Counsel c/o The Florida Legislature 111 West Madison Avenue, Room 812 Tallahassee, FL 32399-1400 Joaquin Avino County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, FL 33128 cc:

(cont'd on page 4)

FP&L cc:

(cont'd)

Jack Shreve Public Counsel Office of the Public Counsel c/o The Florida Legislature ill West Madison Avenue, Room 812 Tallahassee, FL 32399-1400 Joaquin Avino County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, FL 33128 Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Distribution:

R. Croteau, NRR G. A. Hallstrom, RII Document Control Desk Thomas P. Johnson Senior Resident Inspector U.S. Nuclear Regulatory Commission P. 0.

Box 1448 Homestead, FL 33090 FC SEHD RII:DRS JKreh HAHE TO

/

94 ATE PDR2

Yes, Yes Ho COPY?

OFFICIAL ORD COPY Ho RII'I I:DRP KLendis 40 /

/94 C7/~94 es Ho DO EHT NAHE:

A:iPTP2627I.JLK Ho

/

/94 Yes No

/

/94 Yes Ho

FPRL cc:

(cont'd)

Joe Hyers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Distribution:

R. Croteau, NRR G. A. Hallstrom, RII Document Control Desk Thomas P. Johnson Senior Resident Inspector U.S. Nuclear Regulatory Commission P. 0.

Box 1448 Homestead, FL 33090 SEND TO FC RII:DRSS NAHE JKreh RII:DRSS KBarr RI I:DRP KLandis PDR?

ATE

/

/94

/

/94

/

/94

/

/94

/

/94 Yes No COPY?

Yes OFFICIAL RECORD COPY No Yes No Yes DOCUHENT NAHE:

A:iPTP2627I.JLK No Yes No Yes No