Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17354A656 + (13:18:58, 7 January 2025)
- RA-17-0053, Duke Energy - Anchor Darling Double Disc Gate Valve Information and Status + (13:18:58, 7 January 2025)
- ML17354A636 + (13:19:00, 7 January 2025)
- IR 05000298/2017012 + (13:19:01, 7 January 2025)
- ML17354A632 + (13:19:02, 7 January 2025)
- ML17354A630 + (13:19:06, 7 January 2025)
- L-97-241, Documents That FPL Has No Concerns or Challenges Re site- Specific Written Exam Admininstered at Plants on 970912 + (13:19:07, 7 January 2025)
- IR 05000250/1997005 + (13:19:09, 7 January 2025)
- L-97-230, Monthly Operating Repts for Aug 1997 for Turkey Point + (13:19:10, 7 January 2025)
- IR 05000250/1997008 + (13:19:46, 7 January 2025)
- ML17354A619 + (13:19:51, 7 January 2025)
- IR 05000250/1997006 + (13:19:53, 7 January 2025)
- L-97-202, Application for Amends to Licenses DPR-31 & DPR-41,modifying Turkey Point Units 3 & 4 TS to Allow Use of 12 Hour Shifts for Nominal 40 (36 to 48) Hour Week + (13:19:54, 7 January 2025)
- ML17354A616 + (13:19:54, 7 January 2025)
- L-97-222, Forwards Semiannual FFD Performance Rept for 970101-0630 + (13:19:56, 7 January 2025)
- L-97-203, Responds to NRC Re Violations Noted in Insp Repts 50-250/97-06 & 50-251/97-06.Corrective Actions:Matl Placed Under Control of Licensee & Bulk Releases Stopped Pending Completion of Plant Policy + (13:20:00, 7 January 2025)
- ML17354A609 + (13:20:03, 7 January 2025)
- 05000250/LER-1997-006-02, :on 970722,manual Reactor Trip Occurred Due to Failed Rod Control Power Supplies.Replaced Twelve Power Supplies in Rod Control Logic & Power Cabinets + (13:20:04, 7 January 2025)
- L-97-200, Documents Intent to Change Commitment Re Alternate Shutdown Panel Controls.Frequency of Some of Functional Testing Will Be Changed from Every Refueling Outage,To Every Other Refueling Outage + (13:20:05, 7 January 2025)
- L-97-211, Monthly Operating Repts for July 1997 for Tps + (13:20:07, 7 January 2025)
- L-97-181, Requests Exemption from Certain Requirements of 10CFR50,App R, Fire Barrier Program for Nuclear Power Facilities Operating Prior to 790101, IAW Provisions of 10CFR50.12 + (13:20:10, 7 January 2025)
- L-97-182, Forwards Response to 970616 RAI Re Request for Exemption from Requirements of 10CFR50,App R,Section III.G.2.a,for Electrical Raceway Fire Barrier Sys Used at Plant in Outdoor Fire Zones Excluding Turbine Bldg Area + (13:20:14, 7 January 2025)
- L-97-156, Forwards 120-day Response to GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations + (13:20:18, 7 January 2025)
- L-97-188, Responds to NRC Re Violations Noted in Insp Repts 50-250/97-05 & 50-251/97-05.Corrective Actions:Distributed Critique Rept to Emergency Response Organization Members, Revised 0-EPIP-20132 & Distributed Info Bulletin + (13:20:20, 7 January 2025)
- L-97-192, Notifies of FPL Shipment of Operator License Exams Matl Requested by NRC to Listed Examiner.Index of Reference Matl,Encl + (13:20:22, 7 January 2025)
- ML17354A597 + (13:20:28, 7 January 2025)
- ML17354A596 + (13:20:29, 7 January 2025)
- ML17354A594 + (13:20:30, 7 January 2025)
- ML17354A593 + (13:20:31, 7 January 2025)
- ML17354A592 + (13:20:32, 7 January 2025)
- L-97-113, Submits Util Intent to Discontinue Use of High Frequency Re Automatic Link Establishment for Emergency Preparedness Communications + (13:20:33, 7 January 2025)
- IR 05000250/1997007 + (13:20:35, 7 January 2025)
- ML17354A587 + (13:20:37, 7 January 2025)
- ML17354A585 + (13:20:38, 7 January 2025)
- ML17354A583 + (13:20:39, 7 January 2025)
- TAC:M99029 + (13:20:40, 7 January 2025)
- ML17354A582 + (13:20:43, 7 January 2025)
- ML17354A581 + (13:20:44, 7 January 2025)
- 05000250/LER-1997-005-01, :on 970618,RCP Oil Collection Sys Was Found Outside Design Basis.Caused Because Design Did Not Consider Component Parts to Be Potential Leakage Sources.Entire RCP Oil Collection Sys Was Reviewed + (13:20:45, 7 January 2025)
- ML17354A576 + (13:20:47, 7 January 2025)
- ML17354A578 + (13:20:47, 7 January 2025)
- L-97-155, Forwards Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept, IAW Provisions of ASME Code,Section XI + (13:20:48, 7 January 2025)
- L-97-176, Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2 + (13:20:50, 7 January 2025)
- L-97-173, Requests NRC Review & Concurrence W/Proposed Mod in Fitness for Duty Program,Eliminating Mandatory Fifteen Minute Observation Period for Breath Alcohol Concentration (Bac) Test for All Donors as Listed + (13:20:51, 7 January 2025)
- L-97-170, Forwards Revs to EPIPs 0-EPIP-20132, Technical Support Ctr (TSC) Activation & Operation & 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training. Description of Revs,Attached + (13:20:53, 7 January 2025)
- L-97-163, Provides Update to Written Notice of Claim Involving Alleged Bodily Injury Arising Out Of,Or in Connection With,Use of Radioactive Matl at Plant.Case Was Dismissed by Us District Court on 970606 + (13:20:55, 7 January 2025)
- L-97-143, Informs of Util Intention to Conduct Graded Review of Turkey Point Fsar.Reviews Are Expected to Be Completed by 980118 + (13:20:57, 7 January 2025)
- ML17354A565 + (13:21:03, 7 January 2025)
- ML17354A563 + (13:21:04, 7 January 2025)
- ML17354A561 + (13:21:05, 7 January 2025)
- ML17354A560 + (13:21:07, 7 January 2025)