CATEGORY 1 REQUEST(Q TNRORMRTION DZSTRIBUTZONO'STEM (RTDS)
ACCESSION NBR:9709170242 DOC.DATE: 97/08/31 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C
05000250 50,-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION MOWREYIC.L.
Florida Power
& Light Co.
HOVEY,R.J.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly 'operating repts for Aug 1997 for Turkey Point.
W/970909 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs NOTES:
A T
RECIPIENT ID CODE/NAME PD2-3 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN2 EXTERNAL: LITCO BRYCE,J H
NRC PDR COPIES LTTR ENCL 1
1
,1 1
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME CROTEAU,R FILE CENTER 1
AD NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 0
D 0
U NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS, OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
'DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
@PI SEP 09 1997 L-97-230 10 CFR 550.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements ofTurkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance ofGeneric Letter 97-02, attached are the August 1997 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very truly yours, Oi R. J. Hovey Vice President Turkey Point Plant CLM Attachments cc:
Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant L'i'OO79 9709i70242 97G83i PDR ADQCK 0500025G R
~
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII an FPL Group company
I k'
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-250 TURKEY POINT UNIT 3 Se tember 3 1997 305 246-6204 (Month/Year)
- 1. Design Electrical Rating (MWe-Net) 720
- 2. Maximum Dependable Capacity (MWe-Net) 693
- 3. Number of Hours Reactor Was Critical
- 4. Number of Hours Generator Was On Line
- 5. Unit Reserve Shutdown Hours
- 6. Net Electrical Energy (MWH)
MONTH 744.0 725.5 0.0
-YTD-4737.3 4642.8 0.0 504273.0,,
3161305.0 CUMULATIVE 150188.8 148029.9 121.8 94321511.0
AVERAGE DAI NIT POWER LEVEL
.MONTH August, 1997 DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50- 250 Turkey Point rt'3 Sep 03, 1997 C. L Mowrey (305) 246-6204 DAY 08/01/97 08/02/97 08/03/97 08/04/97 08/05/97 08/06/97 08/07/97 08/08/97 08/09/97 08/10/97 08/11/97 08/12/97 08/13/97 08/14/97 08/15/97 08/16/97 08/17/97 08/18/97 08/19/97 08/20/97 08/21/97 08/22/97 08/23/97 08/24/97 08/25/97 08/26/97 08/27/97 08/28/97 08/29/97 08/30/97 08/31/97 AVERAGE DAILY POWER LEVEL (MWe.Net) 692 698 700 700 698 699 699 699 700 705 702 698 697 302 403 695,
699 700 696 696 697 700 701 701 703 704 704 704 705 705 708
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-250 DNI1' 6MB:
T I P
I I'ATE:
Se tember3 1997 CDMPLB1'BD BY:
C. L.
TBLBPNDNB:
N006
<<-I6 00 REPORT MONTHAUGUST 1997 Date Type'uration
{Hours)
Reasons Method of Shutting Down Reactor'ause 4 Corrective Action Counts 1052 8/14/97 18.5 Taken off line to repair leak from High pressure Oil Backup to Generator Air Side Seal Oil system F - Forced S - Scheduled Reason A - Equipment Failure B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training 6
License Examination F - Administrative G - Operational Error tExplain)
H - Other (Explain)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other {Explain)
SUMMARY
OF< OPERATING EXPERIENCE DOCKET NO.
UNIT:
DATE:
COMPLETED BY TELEPHONE:
50-250 T~ki H Se tember3 1997 L. Mowre 305 246-6204 HH OllT MONTH k Unit 3 operated at essentially 100% power until August 14, 1997, when the plant was taken ofF line to repair an oil leak.
The Main Bearing Oil system supplies high pressure backup oil to the Main Generator Air Side Seal Oil system. The leak was on the backup oil supply line. The unit was returned to service and reached 100% power on August 15. The unit remained at essentially 100% power for the remainder ofthe month..
OPERATING DATAREPORT DOCKET NO.
UNITNAME DATE COMPLETED BY TELEPHONE 50-251 TURKEY POINT UNIT4 Se tember3 1997
~C. L. Mowre (Month/Year)
- 1. Design Electrical Rating (MWe-Net) 720
- 2. Maximum Dependable Capacity (MWe-Net) 693
- 3. Number of Hours Reactor Was Critical
- 4. Number of Hours Generator Was On Line
- 5. Unit Reserve Shutdown Hours MONTH 744.0 744.0 0.0
-YTD-5757.0 5743.8 0.0 CUMULATIVE 147210.0 142909.8 577.2
- 6. Net Electrical Energy (MWH) 515422.0 4030464.0 92079542.0 r
AVERAGE DAI NIT POWER LEVEL MONTH August, 1997 DOCKET NO.
UNIT DATE COMPLETED BY
~ TELEPHONE 50-251 Turkey Point k4 Sep 03, 1997 C. L Mowrey (304) 246 - 6204 DAY 08/01/97 08/02/97 08/03/97 08/04/97 08/05/97 08/06/97 08/07/97 08/08/97 08/09/97 08/10/97 08/11/97 08/12/97 08/13/97 08/14/97 08/15/97 08/16/97 08/17/97 08/18/97 08/19/97 08/20/97 08/21/97 08/22/97 08/23/97 08/24/97 08/25/97 08/26/97 08/27/97 08/28/97 08/29/97 08/30/97 08/31/97 AVERAGE DAILY POWER LEVEL (MWe-Net) 690
, 694 692 692
'691 691 692 692 694 699 695 692 691
., 690 690 691 693 693 690 688 688 691 686 693 694 694 696 697 697 698 701
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNITNAME:
DATE:
COMPLETED BY TELEPHONE:
50-251 Turke Pomt84 Se tember 3 1997 C. L. Mowre 305 246-6204 REPORT MONTHAUGUST 1997 No.
Date Dura'tio n
(Hours)
Reason~
Method of Shutting Down Reactor'ause 4 Corrective Action to Prevent Recurrence N/A F - Eorced S - Scheduled Reason A - Equipnent Eailure B Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training 4
License Examination P - Adninistrative G - Operational Error (Explain)
H - Other (Explain)
Method 1 Manual 2 Manual Scram 3 - Autonatic Scran 4 - Continued 5 - Load Reduction 9 - Other (Explain)
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
UNIT:
DATE:
COMPLETE BY:
TELEPHONE:
50-251 Turke Point P4 Se tember 3 1997 C. L. Mowre 305 246-6204 REPORT MONTHAUGUST 1997 Unit 4 operated at essentially 100% power for the entire month ofAugust.