ML17354A582
| ML17354A582 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point, Saint Lucie |
| Issue date: | 07/21/1997 |
| From: | Hebdon F NRC (Affiliation Not Assigned) |
| To: | Plunkett T FLORIDA POWER & LIGHT CO. |
| References | |
| TAC-M99029, TAC-M99030, TAC-M99031, TAC-M99032, NUDOCS 9707240342 | |
| Download: ML17354A582 (6) | |
Text
gP,S ~EC0+
12 C
~
O h
ID O
Yg gO
++*++
t
~
5P-Z5D/Rg
(
UNITED STATES
~+ <995/5+1 NUCLEAR REGULATORY COMMISSION WASHINGTON> D.C. 20555-0001 July 21, 1997 Hr. Thomas F. Plunkett President, Nuclear Division Florida Power and Light Company Post Office Box 14000 Juno
- Beach, Florida 33408-0420
SUBJECT:
CHANGE TO FITNESS FOR DUTY PROGRAM FOR TURKEY POINT UNITS 3 AND 4 AND ST.
LUCIE UNITS 1
AND 2 (TAC NOS. H99031/H99032/H99029/H99030)
Dear Hr. Plunkett:
By letter dated June 3, 1997, Florida Power 8 Light Company (FPL) requested U.S,. Nuclear Regulatory Commission (NRC) review and concurrence with a proposed modification in the FPL Fitness for Duty (FFD) program.
In response to NRC comments, FPL revised and resubmitted the request by letter dated July 1, 1997.
FPL proposed to eliminate the mandatory 15-minute observation period for the breath alcohol concentration (BAC) test for all donors.
10 CFR Part 26, Appendix A, Section 2.4(g)(18) requires that "Alcohol breath tests shall be delayed at least 15 minutes if any source of mouth alcohol (e.g.,
breath fresheners) or any other substances are ingested (e.g., eating, smoking, regurgitation of stomach contents from vomiting or burping)."
FPL currently implements this requirement by requiring a 15-minute observation period for all personnel before administering a
BAC test.
Based on technical expertise from the manufacturer of the BAC testing device, FPL concluded that the 15-minute waiting period assures that residual alcohol from products such as breath mints, breath freshene} s, and mentholated cigarettes has dissipated below detectable levels and that the 15-minute observation period is relevant only for positive alcohol tests.
Based on this conclusion, FPL proposed to modify the BAC testing aspect of the FFD program as described in the July 1, 1997, submittal.
Based on the description of the program modification in the July 1,
- 1997, submittal, the NRC staff concurs that this modification to the FFD program does not constitute a deviation from the requirements of 10 CFR Part 26, Appendix A, in that it only changes FPL's method for meeting one of the
)gQ2 0 9707240342 97072i PDR ADQCK 05000250 P
't 1
1 P
III
C
(
1g, J
t
4
Mr. T. Plunkett requirements.
Therefore, the FPL program is acceptable in that it will continue to comply with 10 CFR Part 26, Appendix A, Section 2.4(g)(18) and require a 15-minute waiting period where there is a potential source of mouth alcohol.
Sincerely, Original signed by Docket No. 50-250, 50-251, 50-335 and 50-389 Frederick J.
Hebdon, Director Project Directorate II-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc:
See next page Distribution Docket File
-- PUBLIC St.
Lucie Rdg.
Turkey Point Rdg.
B. Boger R. Croteau OGC ACRS J.
- Johnson, RII L. Bush DOCUMENT NAME:
G:iSTLUCIE/FFD.REV To receive a copy of this document, indicate In the boxu C
= Copy without attachment/enclosure E" ~ Copy with attachment/enclosure N
= No copy OFFICE PDII-3/PM PD I I-3/LA PDII-3/D PSGB NAME LWiens BClayton FHebdon JCunningham DATE 07/
7 07/
97 07/ ~97 OFFICIAL RECORD COPY 06/
/97
t' e
I t
v
~'"Hr.'. F. Plunkett Florida Power and Light Company I
CC:
Senior Resident Inspector St. Lucie Plant U.S. Nuclear Regulatory Commission 7585 S.
Hwy A1A
.Jensen
- Beach, Florida 34957 Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs
. 2740 Centerview Drive Tallahassee, Florida 32399-2100 M. S.
Ross, Attorney Florida Power
& Light Company P.O.
Box 14000 Juno
- Beach, FL 33408-0420 John T. Butler, Esquire
- Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Robert J.
Hovey, Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL 33035 Douglas Anderson County Administrator St. Lucie County 2300 Virginia Avenue Ft. Pierce, Florida 34982 Hr. J.
Scar ola Plant General Hanager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen
- Beach, Florida 34957 Hr. Gary E. Hollinger Licensing Manager Turkey Point Nuclear Plant 9760 SW. 344th Street Florida City, FL 33035 Mr. Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Tallahassee, Florida 32399-0700 ST.
LUCIE PLANT TURKEY POINT PLANT Regional Administrator, Region II U.S. Nuclear Regulatory Commission 61 Forsyth Street, SW., Suite 23T85
- Atlanta, GA 30303-3415 Mr. H.
N. Paduano, Manager Licensing
& Special Programs Florida Power and Light Company P.O.
Box 14000 Juno
- Beach, Florida 33408-0420 J.
A. Stall, Site Vice President St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen
- Beach, Florida 34957 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission P.O.
Box 1448 Homestead, Florida 33090 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL 33035 Armando Vidal County Manager Metropolitan Dade County ill NW 1 Street, 29th Floor Miami, Florida 33128 Hr. Kerry Landis U.S. Nuclear Regulatory Commission 61 Forsyth Street, SW., Suite 23T85
- Atlanta, GA.30303-3415 E. J.
Weinkam Licensing Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen
- Beach, Florida 34957
0 I
4f