Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18016A326 + (11:01:58, 7 January 2025)
- ML18016A323 + (11:02:00, 7 January 2025)
- ML18016A322 + (11:02:01, 7 January 2025)
- ML18016A319 + (11:02:03, 7 January 2025)
- HNP-98-018, Monthly Operating Rept for Jan 1998 for Shearon Harris Nuclear Power Plant + (11:02:04, 7 January 2025)
- HNP-98-016, Provides Proprietary Notification That Reactor Operator Licensed on Plant Reassigned from Position for Which Util Previously Certified Need for Reactor Operator License.Encl Withheld (Ref 10CFR2.790(a)(6)) + (11:02:05, 7 January 2025)
- 05000400/LER-1998-001, :on 980109,potential Condition Outside Design Basis Related to Instrument Air Sys Leak Causing SG pre- Heater Bypass Isolation Valves to Be Inoperable Was Noted. Caused by Inadequate Design Control.Generated Jco 98-01 + (11:02:08, 7 January 2025)
- ML18016A312 + (11:02:10, 7 January 2025)
- HNP-98-007, Forwards Listed Info in Response to GL 97-04, Assurance of Sufficient NPSH for ECC & Containment Heat Removal Pumps + (11:02:11, 7 January 2025)
- ML18016A305 + (11:02:13, 7 January 2025)
- ML18016A308 + (11:02:13, 7 January 2025)
- HNP-98-011, Forwards Rev 0 to Procedure HNP-IST-002, Shearon Harris Nuclear Power Plant,Ist Program Plan - 2nd Interval. Plan Describes Tests Required to Verify Operational Readiness of Class 1,2 & 3 Pumps & Valves + (11:02:14, 7 January 2025)
- HNP-98-013, Responds to NRC Re Violations Noted in Insp Rept 50-400/97-12.Corrective Actions:Temporary Interim Action Will Remain in Place Until Specific Procedural Requirements Are Implemented + (11:02:16, 7 January 2025)
- ML18016A298 + (11:02:24, 7 January 2025)
- ML18016A296 + (11:02:25, 7 January 2025)
- ML18016A293 + (11:02:26, 7 January 2025)
- HNP-98-012, Forwards Listed Emergency Planning Info in Response to NRC Administrative Ltr 94-07, Distribution of Site-Specific & State Emergency Planning Info. W/O Encl + (11:02:27, 7 January 2025)
- ML18016A291 + (11:02:27, 7 January 2025)
- HNP-98-010, Forwards Rev 0 to Procedure HNP-ISI-002, Shearon Harris Nuclear Power Plant,Isi Program Plan,2nd Interval. Plan Describes Exams & Schedules for Performing ASME Code Insps of Class 1,2 & 3 Components & Supports + (11:02:29, 7 January 2025)
- IR 05000400/1997010 + (11:02:31, 7 January 2025)
- HNP-98-004, Monthly Operating Rept for Dec 1997 for Shearon Harris Nuclear Plant,Unit 1 + (11:02:32, 7 January 2025)
- ML18016A284 + (11:02:35, 7 January 2025)
- ML18016A281 + (11:02:38, 7 January 2025)
- ML18016A279 + (11:02:39, 7 January 2025)
- ML18016A278 + (11:02:40, 7 January 2025)
- ML18016A276 + (11:02:41, 7 January 2025)
- HNP-98-002, Forwards Proprietary Notification of Changes in RO & SRO Status.Encl Withheld Per 10CFR2.790(a)(6) + (11:02:42, 7 January 2025)
- HNP-98-003, Forwards Response to Exercise Weakness Identified in Paragraph P4.8 of NRC Insp Rept 50-400/97-11 Transmitted by Ltr + (11:02:44, 7 January 2025)
- HNP-97-219, Monthly Operating Rept for Nov 1997 for Shearon Harris Nuclear Power Plant + (11:02:45, 7 January 2025)
- 05000400/LER-1997-024, :on 971118,SSPS Testing Deficiency Was Noted. Caused by Inadequate Testing Scheme Provided by Ssps Vendor. Revised Procedure + (11:02:48, 7 January 2025)
- ML18016A263 + (11:02:49, 7 January 2025)
- HNP-97-217, Requests Relief from Criteria of 10CFR50.55a(g)(6)(ii)(A)(2) for Augmented Exams of RPV Welds at Plant.Relief Requested from Listed ASME B&PV Code,Section Xi,Requirements for Final Insp Period of First 20 Year Insp Interval + (11:02:50, 7 January 2025)
- ML18016A259 + (11:02:51, 7 January 2025)
- HNP-97-198, Application for Amend to License NPF-63,revising TS 4.7.1.2.1.a.2.a to Change Differential Pressure & Flow Requirements of Steam turbine-driven AFW Pump to Allow Testing of Pump at Lower Speed than Is Currently Performed + (11:02:52, 7 January 2025)
- HNP-97-218, Responds to NRC Re Violations Noted in Insp Rept 50-400/97-10.Corrective Actions:Counseled Personnel Involved in Violation,Revised Procedure GP-005 to Provide Addl Guidance & Corrected Specific Procedures + (11:02:57, 7 January 2025)
- ML18016A254 + (11:02:59, 7 January 2025)
- HNP-97-213, Forwards Corrections & Additions to Auxiliary Reservoir Dam Audit Data Sheets,In Response to NRC .List of Actions That Should Be Taken by Util to Ensure Continued Safety of Category I Auxiliary Dam,Encl + (11:03:00, 7 January 2025)
- HNP-97-211, Rept of Changes,Tests & Experiments for Plant for 951213- 970607,per 10CFR50.59(b)(2).Some Changes Implemented After 970607 Are Also Included in Rept + (11:03:02, 7 January 2025)
- 05000400/LER-1997-023, :on 920721,RCS PIV Testing Deficiency Was Noted.Caused by Failure to Consider All Testing Variables During Initial Sp Development.Surveillance Tp OST-1506 Was Revised to Incorporate Correction Factor + (11:03:05, 7 January 2025)
- HNP-97-214, Forwards Proprietary Certification of Medical Exam by Facility Licensee, for One SRO & Two ROs Licensed to Operate Harris Nuclear Plant.Requested That Licenses Be Amended IAW Changes Identified.Proprietary Forms Withheld + (11:03:06, 7 January 2025)
- IR 05000400/1997011 + (11:03:10, 7 January 2025)
- ML18016A244 + (11:03:11, 7 January 2025)
- ML18016A243 + (11:03:12, 7 January 2025)
- ML18016A242 + (11:03:14, 7 January 2025)
- RAIO-0118-58186, LLC Supplemental Response to NRC Request for Additional Information No. 71 (Erai No. 8889) on the NuScale Design Certification Application + (11:03:15, 7 January 2025)
- ML18016A241 + (11:03:15, 7 January 2025)
- ML18016A237 + (11:03:18, 7 January 2025)
- ML18016A236 + (11:03:18, 7 January 2025)
- ML18016A232 + (11:03:19, 7 January 2025)
- IR 05000400/1997009 + (11:03:20, 7 January 2025)
- HNP-97-207, Monthly Operating Rept for Oct 1997 for Shearon Harris Nuclear Power Plant + (11:03:22, 7 January 2025)