Text
CATEGORY 2
1 t'EGULATORYINFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9803040174
DOC.DATE: 98/02/17
NOTARIZED: NO
ACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina
UTH.NAME
AUTHOR AFFILIATION
HYMLOCK,M.B.
Region
2 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
ROBINSON,W.R.
Carolina Power
& Light Co.
SUBJECT: Forwards insp rept 50-400/97-13
on 971207-980117
E
NOV.
Violation identified for failure to correct long standing
design deficiency re
bypass
containment isolation valve air actuators.
DOCKET I
05000400
C
DISTRIBUTION CODE: IE01F
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:Application for permit renewal filed.
E
05000400
G
RECIPIENT
ID CODE/NAME
PD2-1
INTERNAL: ACRS
NUDOCS -ABSTRACT
OGC/HDS2
TERNAL: LITCO BRYCE, Z H
NRC PDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
'
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
FLANDERS,S
AEOD/SPD/RAB
DEDRO
NRR/DRCH/HHFB
NRR/DRPM/PERB
OE DIR
RGN2
FILE
01
NOAC
NUDOCS FULLTEXT
COPIES
LTTR ENCL
1
1
1
1
1
. 1
1
1
1
1
1
1
1
1
1
1
1
1
~ 0
D
LOADED FROM
) NRCFLappy
E
NOTE TO ALL "RZDS" RECIPZENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED<! LTTR
19
ENCL
19
February
17,
1998
EA 98-48
Carolina
Power 5 Light Company
ATTN: Mr.
W.
R. Robinson
Vice President
- Harris Plant
Sharon Harris Nuclear
Power Plant
P. 0.
Box 165, Mail Code:
Zone
1
New Hill, NC
27562-0165
SUBJECT:
NRC
INTEGRATED INSPECTION REPORT 50-400/97-13
Dear Mr. Robinson:
On January
17,
1998, the
NRC completed
an inspection at your Harris reactor
facility.
The enclosed
report presents
th'e results of that inspection.
During the six weeks covered
by this inspection period. our inspectors
found
that your staff generally took
a safety conscious
approach to the operation of
the facility.
One violation was identified for failure to correct
a long
standing design deficiency related to the steam generator
feedwater preheater
bypass
containment isolation valve air actuators.
We are also concerned with
the lack of information pertaining to these actuators
in design
and licensing
basis
documents
which would provide their operational
characteristics.
We are
still reviewing your steam generator
blowdown water
hammer event that occurred
on December
22,
1997.
The violation is cited in the enclosed
Notice of Violation, and the
circumstances
surrounding the violation is described in detai 1 in the enclosed
report.
Please
note that you are required to respond to this letter and
should follow the instructions specified in the enclosed
Notice when preparing
your response.
The
NRC will use your response,
in par t. to determine whether
further
enforcement action is necessary
to ensure
compliance with regulatory
requirements.
'P803040i74 9'802i7
PGR
ADOGK 050Q0400
8
!!!!!!!!!!!!!!!!
i[ill]!!!!!!!!!!!!!!!!!
CPEL
2
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice."
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room
(PDR).
Sincerely,
Otllgaa1signedbyM.B. 8~~
Docket No.
50-400
License
No.
Hilton B. Shymlock. Chief
Reactor Projects
Branch 4
Division of Reactor
Projects
Enclosures:
1.
2.
NRC Inspection Report
D.
B. Alexander,
Manager
Performance
Evaluation
and
Regulatory Affairs
OHS7
Carolina
Power
8 Light Company
412 S. Wilmington Street
Raleigh,
NC
27601
J.
W. Donahue
Director of Site Operations
MC:
Zone
1
Carolina
Power
8 Light Company
Shearon Harris Nuclear Power Plant
P. 0.
Box 165
New Hill .
NC
27562-0165
Bo Clark
Plant General
Manager--Harris
Plant
Carolina
Power
8 Light Company
Shearon Harris Nuclear
Power Plant
P. 0.
Box 165
New Hill, NC
27562-0165
Chris A. VanDenburgh,
Manager
Regulatory Affairs
Carolina
Power
8 Light Comp'any
Shearon Harris Nuclear
Power Plant
P. 0.
Box 165. Hail Zone
1
New Hill, NC
27562-0165
(cc w/encls cont'd
- See
page 3)
CPSL
(cc w/encl cont'd)
Johnny
H. Eads,
Supervisor
Licensing/Regulatory
Programs
Carolina
Power
II Light Company
Shearon Harris Nuclear
Power Plant
P. 0.
Box 165, Nail 2one
1
New Hill, NC
27562-0165
William D. Johnson
Vice President
8 Senior
Counsel
Carolina
Power
8 Light Company
P. 0.
Box 1551
Raleigh,
NC
27602
Hel Fry, Acting Director
Division of Radiation Protection
N.
C. Department of Environmental
Commerce
8 Natural
Resources
.3825 Barrett Drive
Raleigh,
NC
27609-7721
Karen
E.
Long
Assistant Attorney General
State of North Carolina
P. 0.
Box 629
Raleigh,
NC
27602
Public Service
Commission
State of South Carolina
P. 0.
Box 11649
Columbia,
SC
29211
Chairman of the North Carolina
Utilities Commission
P. 0.
Box 29510
Raleigh,
NC
27626-0510
Robert
P. Gruber
Executive Director
Public Staff NCUC
P. 0.
Box 29520
Raleigh.
NC
27626
Stewart
Adcock, Chairman
Board of County Commissioiners
of Wake County
P. 0.
Box 550
Raleigh,
NC
27602
Margar'et Bryant Pollard,
Chairman
Board of County Commissioners
of Chatham County
P. 0.
Box 87
Pittsboro,
NC
27312
CP8L
Distribution w/encl:
N. Shymlock, RII
J. Coley, RII
S. Flanders,
R. Aiello, RII
J.
Lenahan.
RII
D. Jones,
RII
D. Thompson,
RII
PUBLIC
NRC Resident
Inspector
U. S. Nuclear Regulatory Commission
5421 Shearon Harris
Road
New Hill, NC
27562-9998
OFFICE
SI GNATURE
DATE
RI I:DRP
RII:DRP
RI I:DRS
RII: RP
RI
- DRS
FDope
TES
NO
T
NO
TS
NO
YES
NO
OFFICIAL RECORD COPT
DOCIRIENT NAKE
G:XNARRISXIRCURR%9713.
S
NO
RII:DRS
E
NO
RII:E
E
NO