November 17, 1997 Carolina Power 8 Light Company ATTN:
Mr.
W.
R. Robinson Vice President
- Harris Plant Shearon Harris Nuclear Power Plant P. 0.
Box 165, Mail Code:
Zone 1
New Hill, NC 27562-0165
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR)
- HARRIS
Dear Mr. Robinson:
On October 17.
1997, the NRC staff completed the semiannual Plant Performance Review (PPR) of Harris Nuclear Plant.
The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.
The results are used by NRC management to facilitate planning and allocation of inspection resources.
The PPR for Harris involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period March 1997 to October, 1997.
PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management Meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the Harris PPR review and the general time frame of planned inspections plus the exact dates of team inspections.
It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite.
The enclosure details our inspection plan for the next six (6) months.
Individual inspections are identified by the month(s) in which we intend to conduct the inspection.
Exact dates are not provided for non-team inspections because experience has proven that we must often change dates as the result of higher priority requi rements and conflicts at your site or other sites.
You will be contacted 3-6 weeks prior to individual inspections to confirm dates.
The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reasons for emphasis in these program areas.
Resident inspections are not listed due to their ongoing and continuous nature.
The NRC's general policy for reactor inspections is that each inspection shall be announced.
except when announcing the inspection could reasonably compromise the objectives of the inspectors.
Therefore, some specific inspections, such as in the security and radiological protection areas, may not be announced.
As part of the regional initiative inspection
- program, we plan to conduct followup inspections of fire barrier penetration seal issues during the next 6
months.
The issues are discussed in Information Notice
( IN) 88-04, I
"Inadequate Qualification and Documentation ot Fire Barrier Penetration Seals,"
and IN 88-56, "Potential Problems with Silicone Foam Fire Barrier 97i2040080 97iii7 PDR ADOCK 05000400 8
PDR lllllllllllllllllllllllllllllIllllllll
CPKL Penetration Seals."
The specific plants that will be inspected have not yet been determined.
We will notify you separately if the inspections are scheduled at your facility in the next 6 months.
We will inform you of any changes to the inspection plan.
If you have any
- questions, please contact me at 404-562-4540.
Sincerely, Docket No. 50-400 License No.
Enclosure:
Inspection Plan cc w/encl:
D.
B. Alexander, Manager Performance Evaluation and Regulatory Affairs OHS7 Carolina Power
& Light Company 412 S. Wilmington Street
- Raleigh, NC 27601 J.
W. Donahue Director of Site Operations Carolina Power 8 Light Company Shearon Harris Nuclear Power Plant P.
O.
Box 165, MC:
Zone 1
New Hill, NC 27562-0165 (cc w/encl cont'd
- See page 3)
Milton B. Shymlock, Chief Reactor Projects Branch 4 Division of Reactor Projects
CP&L (cc w/encl cont'd)
Bo Clark Plant General Manager
- Harris Plant Carolina Power
& Light Company Shearon Harris Nuclear Power Plant P. 0.
Box 165 New Hill.
NC 27562-0165 Chris A. VanDenburgh, Manager Regulatory Affairs Carolina Power
& Light Company Shearon Harris Nuclear Power Plant P. 0.
Box 165, Mail Zone 1
New Hill, NC 27562-0165 Johnny H. Eads, Supervisor Licensing/Regulatory Programs Carolina Power
& Light Company Shearon Harris Nuclear Power Plant P. 0.
Box 165, Mail Zone 1
New Hill, NC 27562-0165 W.
D. Johnson, Vice President and Senior Counsel Carolina Power
& Light Company P. 0.
Box 1551
- Raleigh, NC 27602 Mel Fry, Acting Director Division of Radiation Protection N.
C. Department of Environment, Health
& Natural Resources 3825 Barrett Drive
- Raleigh, NC 27609-7721 Karen E.
Long Assistant Attorney General State of North Carolina P. 0.
Box 629
- Raleigh, NC 27602 Public Service Commission State of South Carolina P.
0.
Box 11649
- Columbia, SC 29211 Chairman of'he North Carolina Utilities Commission P. 0.
Box 29510
- Raleigh, NC 27626-0510 Robert P. Gruber Executive Director Public Staff NCUC P. 0.
Box 29520
- Raleigh, NC 27626 Stewart Adcock, Chairman Board of County Commissioners of Wake County P. 0.
Box 550
- Raleigh, NC 27602 Margaret Bryant Pollard, Chairman Board of County Commissioners of Chatham County P. 0.
Box 87 Pittsboro, NC 27312 Distribution w/encl:
(See page 4)
CP8L Distributi on wiencl:
M. Shymlock, RII J.
Coley. RII R. Baldwin, RII J.
- Lenahan, RII W. Rankin, RII D. Thompson, RII V. Rooney.
NRR PUBLIC NRC Resident Inspector U. S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, NC 27562-9998 SIGNATURE JJohnso rr HChrlstensen PFredr5ckson Peebles COPY?
YES HO ES NO YE HO NO DATE 11 / 4 / 97 11 /
7 / 97 I / ~ / 97 I
/ 97 11 7 / 97 YES NO 11 /
97 YES SIGNATURE DATE COPY?
acDonald Il //P /97 YES HO YES NO C
YES NO 11 /
/ 97 11 /
/ 97 YES HO YES HO 11 /
/ 97 11 /
/ 97 11 /
/ 97 YES NO
HARRIS INSPECTION PLAN FOR: 10/97
- 3/98 IP - Inspection Procedure TI - Temporary Instruction Core Inspection
- Hinimum NRC Inspection Program (mandatory all plants)
Harris SALP Period ends January 17, 1998 INSPECTION IP 82301 TITLE/
PROGRAH AREA Emergency Preparedness NUHBER OF INSPECTORS PLANNED INSPECTION DATES 10/6/97 TYPE OF INSPECTION-COHMENTS Core Inspection Completed IP 83750 IP 84750 IP 86750 IP 40500 IP 37550 IP 37550 IP 81700 IP 71001 IP 83750 IP 84750 IP 86750 IP 62700 Radiation Protection Effectiveness of Licensee Correcti ve Action Progr am Engineering Engineering Security Operator Exams Radiation Protection Haintenance 10/27/97 11/97 12/97 12/97 12/97 1/98 1/98 3/98 Core Inspection Completed Core Inspection Core Ins ection Initiative Inspection to Review Licensee s
Engineering Assessment Core Ins ection Core Inspection Re ual Exam Core Inspection Initiative Inspection to Review TS Surveillance Procedures ENCLOSURE