Text
CATEGORY
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
PACCESSION NBR:9801210166
DOC.DATE: 97/12/31
NOTARIZED: NO
~
~
~
~
~
~
FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina
AUTH.NAME
AUTHOR AFFILIATION
SHYMLOCK,M.B.
Region
2
(Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
ROBINSON,W.R.
Carolina
Power
&, Light Co.
SUBJECT:
Forwards insp rept 50-400/97-12
on 971026-1206
S
NOV.
Violations cited in encl
NOV R circumstances
surrounding
violations described in detail in encl rept.
DISTRIBUTION CODE: IEOIF
COPIES
RECEIVED:LTR
i ENCL
i
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:Application for permit renewal filed.
DOCKET
05000400
05000400 p
RECIPIENT
ID CODE/NAME
PD2-1
INTERNAL: ACRS
AEOD/TTC
P~CB
NUDOCS -ABSTRACT
OGC/HDS2
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
FLANDERS,S
AEOD/SPD/RAB
DEDRO
NRR/DRCH/HHFB
NRR/DRPM/PERB
OE DIR
RGN2
FILE
01
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
ERNAL: LITCO BRYCE,J H
NRC PDR
1
1
1
.
1
NOAC
NUDOCS FULLTEXT
1
1
1
1
ga'pip
p~~wc g
NOTE TO ALL "RIDS" RECZPZENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIST,
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT
CONTRO'ESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED'. LTTR'9
ENCL
19
December
31,
1997
Carolina
Power
8 Light Company
ATTN:
Mr.
W.
R. Robinson
Vice President
- Harris Plant
Shearon Harris Nuclear
Power Plant
P. 0.
Box 165, Hail Code:
Zone
1
New Hill, NC
27562-0165
SUBJECT:
NRC
INTEGRATED INSPECTION REPORT 50-400/97-12
Dear Hr. Robinson:
On December
6,
1997. the
NRC completed
an inspection at your Harris reactor
facility.
The enclosed
report presents
the results of that inspection.
During the six weeks covered
by this inspection period,
our inspectors
found
that your staff generally took a safety conscious
approach to the operation of
the facility.
Three violations were identified during the inspection.
One
violation with three examples
was associated
with Environmental Qualification
(EQ) data
package
procedural
requirements
which would allow your data
packages
to be out-of-date for equipment installed in the plant.
This is of concern
since these
are corporate
procedures
and would affect your Brunswick and
Robinson sites
as well.
Your Brunswick site was the subject of a civi 1
penalty
($150,000) for EQ program problems in 1996.
We are concerned that
your corporate
procedures
would allow for this to happen.
in light of your
previous corporate
experience.
These violations are cited in the enclosed
and the
circumstances
surrounding the violations are described
in detail in the
enclosed
report.
Please
note that you are required to respond to this letter
and should follow the instructions specified in the enclosed
Notice when
preparing your response.
The
NRC will use your response,
in part. to
determine whether further enforcement
action is necessary
to ensure
compliance
with regulatory requirements.
The
NRC has concluded that information regarding the reason for violations
B
and
C, the corrective actions taken
and planned to correct the violation and
prevent recurrence
are already adequately
addressed
on the docket in
Inspection Report
No. 50-400/97-12,
which is Enclosure
2 to this letter.
Therefore.
you are not requi red to respond to this letter for those violations
unless the description therein
does not accurately reflect your corrective
actions or your position.
In that case,
or if you choose to provide
additional information, you should follow the instructions specified in the
enclosed
Notice.
98012i0i66 'P7i231
ADOCK 05000400
8
lllllllllllllllll!IIIIIIIIIIIIIIIIIIIIII
Ag
~
'
CP8L
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice."
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room
(PDR).
Sincerely,
(Original signed
by Pierce
H. Skinner
for Milton B. Shymlock)
Docket No.
50-400
License
No.
Milton B. Shymlock
~ Chief
Reactor Projects
Branch
4
,
Division of Reactor Projects
Enclosures:
1.
Notice of'iolation
2.
NRC Inspection
Report
cc w/encls:
D.
B. Alexander,
Manager
Performance
Evaluation
and
Regulatory Affairs
OHS7
Carolina
Power
8 Light Company
412 S. Wilmington Street
Raleigh'C
27601
J.
W. Donahue
Director of Site Operations
Carolina
Power
8 Light Company
Shearon Harris Nuclear
Power Plant
P.
0.
Box 165,
MC:
Zone
1
New Hill, NC
27562-0165
Bo Clark
Plant General
Manager
- Harris Plant
Carolina
Power
8 Light Company
Shearon Harris Nuclear
Power Plant
P. 0.
Box 165
New Hill, NC
27562-0165
Chris A. VanDenburgh,
Manager
Regulatory Affairs
Carolina
Power
8 Light Company
Shearon Harris Nuclear Power Plant
P.
0.
Box 165,
Mail Zone
1
New Hill, NC
27562-0165
(cc w/encls cont'd
- See
page 3)
CP8L
(cc w/encls cont'd)
Johnny
H.
Eads,
Supervisor
Licensing/Regulatory
Programs
Carolina
Power
8 Light Company
Shearon Harris Nuclear
Power
Plant
P. 0.
Box 165, Hail Zone
1
New Hill, NC
27562-0165
W.
D. Johnson,
Vice President
and Senior Counsel
Carolina
Power
8 Light Company
P. 0.
Box 1551
Raleigh,
NC
27602
Mel Fry, Acting Director
Di'vision of Radiation Protection
N.
C. Department of Environment,
Health
8 Natural
Resources
3825 Barrett Drive
Raleigh,
NC
27609-7721
Karen
E.
Long
Assistant Attorney General
State of North Carolina
P. 0.
Box 629
Raleigh,
NC
27602
Public Service
Commission
State of South Carolina
P. 0.
Box 11649
Columbian
SC
29211
Chairman of the North Carolina
Utilities Commi ssi on
P. 0.
Box 29510
Raleigh.
NC
27626-0510
Robert
P. Gruber
Executive Director
Public Staff
NCUC
P.
0.
Box 29520
Raleigh'C
27626
(cc w/encls cont'd - See
page 4)
CP8L
(cc w/encls cont'd)
Stewart Adcock,
Chairman
Board of County Commissioners
of Wake County
P. 0.
Box 550
Raleigh,
NC
27602
Margaret Bryant Pollard,
Chairman
Board of County Commissioners
of Chatham County
P. 0.
Box 87
Pittsboro.
NC
27312
Distribution w/encls:
H. Shymlock. RII
J. Coley, RII
R. Baldwin. RII
J.
Lenahan,
RII
W. Rankin, RII
D. Thompson,
RII
V. Rooney,
PUBLIC
NRC Resident
Inspector
U.
S.
Nuclear
Regulatory
Commission
5421 Shearon Harris Road
New Hill, NC
27562-9998
OFFICE
SIGNATURE
DATE
COPY?
RII DRP
FJape
/g
/
YES
KO
RII:DRP
/g( /
YES
NO
Rl I:DRP
JBI
YES
NO
RII:DRP
CPatterson
/
/
YES
NO
RI I:DRP
EBrmn
/
/
YES
NO
RI I:DRS
KN rr>Meat cr
/
/
YE
NO
RII ADRS
/
/
YES
KO
OFFICE
SIGNATURE
DATE
COPY7
R IItDljS'
)tener
@Ran
>n
/
I /
YES
KO
S
NO
OFFICIAL RECORD
COPY
/
/
YES
NO
YES
NO
DOCQIENT NAKE:
G:iHARRISiIRCURRi9712-
/
/
YES
KO
/
/
YES
NO
/
/
YES
NO
CPM.
I I I ill I I U
I
I IIIIIIII rl I .
Slevar L AJcor;k, dra'ir'San
Hvar J vt Crusty Conmissianers
of Make County
P.
Q. Box 650
Raleigh,
NC
27602
Fargaret
Bryant Pollard.
Chairman
Hoard of County Cotlrissioners
of Chatham County
P. 0. Box 87
Pittsboro.
NC
27312
i
ribution w/en ls:
H. Shymlock, RII
J. Coley. Rll
R. Ba)dwin, RII
J.
Lenahan.
Rll
M. Rankin. RII
D. Thompson. Rll
Y. Rooney.
PUBLIC
NRC Resident
Inspector
U. S. Nuclear Regulatory Commission
5421 Shearon
Har ris Road
Neet Hill. NC
27562-9998
HlJX!$
TOTAL P.82
<4
18:34AM
US
blRI',
818 3bc 814d
{cc wlencls cont'd)
Stewart Adcock. Chairman
Board of County Co~issioners
of Make County
P.
Q.
Box 550
Raleigh,
NC
27602
I1argaret Bryant Pollard,
Chairman
Board of County Gomoissioners
of Chatham County
'P. 0. Box 87
Pittsboro,
HC
27312
0
r'
l:
M. Shymlock, RII
J. Coley, RII
R. BaldwIn. RII
J.
Lenahan.
RII
'M, Rankin. RII
D. Thompson,
RII
V. Rooney.
HRR
PUBLIC
HRC Resident
Inspector
U. S.
1Juclear Regulatory Commission
5421 Shearon Harris Poad
Hew Hill, NC
27562-999S
OFF lCE
STQIATVRE
R
11DRP
RLICD
RlftORP
stterre
R1l aORP
.ORS
NfCttlVOS
f
COAT?
S
R
'IES
OFF lCE
RltrDRS
11:DR
CAPT?
TES
OF
TA1. REQÃO APT
I
I
S
NO
DOC&CRT IV@K-
Q!~ISiTRCORKEg712.
TES
lg)
TOTAL P. 01